ITB 28-06/07/~ ~ A
~s~~/~r
INVITATION TO BID
FOR MULTIPURPOSE MUNICIPAL PARKING FACILITY
BID PACKAGE O1
UNDERGROUND UTILITIES
ITB # 28-06/07
BID OPENING: April 16, 2007
Gus Lopez, CPPO, Procurement Director
PROCUREMENT DIVISION
1700 Convention Center Drive, Miami Beach, Fl 33139
www.miamibeachfl.gov
F:\PURC\ $ALL\Roma n\bids\07\ITB-28-06-07\178-28-06.07. doc
~ MIAMIBEACH
m MIAMIBEACH
City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov
PROCUREMENT Division
Tel: 305-673-7490, Fax: 305-673-7851
INVITATION TO BID (ITB) NO. 28-06107
ADDENDUM NO. 2
April 11, 2007
FOR MULTIPURPOSE MUNICIPAL PARKING FACILITY BID PACKAGE 01 UNDERGROUND
UTILITIES is amended as follows:
THIS ADDENDUM IS A DUPLICATE OF ADDENDUM 1, only the weight on the selection criteria
has been amended. Noon-line bid submittals will be accepted, only hard copv paper bids to
be delivered to the Citv of Miami Beach Procurement Division.
I. The following are answers to questions from prospective bidders.
Q. Will any of the excavated materials be reusable?
A. Please refer to the Technical Specifications section 02315.
Q. Is builder's risk insurance necessary for this project considering there is no building
involved?
A. Yes, Builder's Risk Insurance is a requirement. There are adjacent structures that may
be affected and for this reason Builder's Risk Insurance is required.
Q. Does the City have a scheduled date for Interviews from bidders in reference to this bid?
A. The Technical Review Panel will meet during the week of April 16-20 and will invite
those bidders who are deemed responsive to the bid requirements. Bidders are
requested that they have their key personnel available for interviews on the week of
April 16-20. The key personnel include the following positions:
1) Construction Project Manager
2) Construction Superintendent
Q. Sheet 65 of the bid document states "This contract is by and between the City of Miami
Beach and Ebsary Foundation, Inc." Please provide corrected sheet.
A. Attached to this Addendum is corrected page 65 to be replaced in the bid document.
II. Attached are Amended pages 28 and added page 28-b to be replaced in the bid document.
Amendments are as follows:
The words that have been strikethrough are deleted, and the words underlined are being added
The TECHNICAL REVIEW PANEL (the "Panel") will rank all responsive bidders and will provide
their recommended ranking to the City Manager. pf~ases-to-The
evaluation and scoring process to determine the ranking of bidders ^^~' +"^•• ^~° will be as
follows:
QurrrAVL-T
1) Qualifications and Experience of Contractor's Team (2&15 points)
We are committed to providing excellent public service and safety to cl! who live, work, cnd play in our vibrant, tropical, historic community.
2) Risk Assessments (10 points). A Preliminary Project Schedule should be attached to the
~A~R-Risk Assessment Plan (RAP).
3) Past performance based on number and quality of the Performance Evaluation Surveys (5
points).
3) Presentation and Interview of Key personnel (3~ 20 points).
~u,~AV;= m
4} 5ZBid Price (~ 50 points).
Scoring and ranking procedure:
The r~runu~ei o~~ii~~ni o~~~~~ .Panel will convene and will score and rank all responsive bidders
based on the above criteria. The Panel's recommendation will be presented to the City Manager
After considering the recommendation(s) of the Panel the City Manager shall recommend to the
Mavor and Citv Commission the bid(s) that the City Manager deems to be in the best interest of the
City, unless only one bid response is received, and/or the lowest and best bid exceeds the budgeted
amount allocated towards the construction cost of the project then the City Manager without any
action by the Mayor and City Commission has the authority pursuant to Section 2-367 of the Miami
Beach City Code to exercise any of the following options
(1) Reiect the bid and. if he determines that same is in the best interest of the City re-advertise the
item for bidding; or
(2) Reauest that the Mavor and City Commission make additional funds available and proceed to
negotiate an agreement with the sole bidder: or
(3) Negotiate an agreement with the lowest and best bidder exceeding the budgeted amount of the
work. If the City Manager is unable to successfully negotiate an agreement with the lowest and best
bidder, the Citv Manager may terminate negotiations with such bidder and commence negotiations
with the second lowest and best bidder. If the City Manager is unable to successfully negotiate an
agreement with the second lowest and best bidder the City Manager may terminate negotiations
with the second bidder and commence negotiations with the third lowest and best bidder
The Citv Commission shall consider the City Manager's recommendation(s) and may approve or
reject the Citv Manager's recommendation(s) In any case the Mayor and City Commission shall
select and authorize negotiations with the bidder(s) which the Mayor and Commission deem to be in
the best interest of the City. The City Commission may also reject all bids received
The selection or approval by the City Commission shall not constitute a binding contract between
the City and the selected or approved bidder(s) A binding contract will exist upon the completion of
successful negotiations as determined by the Administration the City Attorney's Office form
approving the contract or contracts and then the Mayor and City Clerk signing the contract(s) after
the selected or approved bidder(s) has for have) done so Onlv the executed contract(s) will be
binding on the contracting parties.
Vb'e are committed to providing exce!len! public service and safety to all bvYro live; work, and play rrr our vibrant iropicai, his'aric community
Bidders are advised to acknowledge this Addendum on ITB document Page 138, "Acknowledgement
of Addenda", or the bid may be considered non-responsive.
CITY OF MIAMI BEACH
Gus Lopez, CPPO
Procurement Director
rm
F:\PU RC\$ALL\Roman\bids\07\ITB-28-O6-07\itb-28-O6-07A2.doc
b'be are coirmiGed to provia'in~ exce!!en! public sen~ice anc sc(ery ;0 071 who live; work, crud ploy in our vibron;; tropical, his!or;c r_om,^1uni,~.~.
00305. TECHNICAL REVIEW PANEL SELECTION CRITERIA /
SELECTION PROCESS
The Evaluation process to be used by the City for this bid will be one of "Best Value
Procurement", meaning that the City will, in addition to price, consider past performance
on previous contracts, Risk Assessment for this ITB, Qualifications of Personnel
proposed, and presentation and interview of Contractor's personnel. (See Section
00315)
The procedure to be used for bid evaluation and selection is as follows:
• Invitation to Bid issued.
• Pre-Bid Meeting.
• Receipt of bids.
• Opening and listing (except pricing) of all bids received.
• Review all bids for responsiveness.
• Distribution of all responsive bids to the Technical Review Panel.
The TECHNICAL REVIEW PANEL (the "Panel") will rank all responsive bidders and will
provide their recommended ranking to the City Manager. The evaluation and scoring
process to determine the ranking of bidders will be as follows
1) Qualifications and Experience of Contractor's Team (15 points)
2) Risk Assessments (10 points). A Preliminary Project Schedule should be
attached to the Risk Assessment Plan (RAP).
3) Past performance based on number and quality of the Performance Evaluation
Surveys (5 points).
4) Presentation and Interview of Key personnel (20 points).
5) Bid Price (50 points).
Scoring and ranking_procedure:
The Panel will convene and will score and rank all responsive bidders based on the
above criteria. The Panel's recommendation will be presented to the City Manager.
After considering the recommendation(s) of the Panel, the City Manager shall
recommend to the Mayor and City Commission the bid(s) that the City Manager deems
to be in the best interest of the City, unless only one bid response is received, and/or
the lowest and best bid exceeds the budgeted amount allocated towards the
construction cost of the project, then the City Manager, without any action by the Mayor
and City Commission, has the authority, pursuant to Section 2-367 of the Miami Beach
City Code, to exercise any of the following options:
(1) Reject the bid and, if he determines that same is in the best interest of the City, re-
advertise the item for bidding; or
(2) Request that the Mayor and City Commission make additional funds available and
proceed to negotiate an agreement with the sole bidder; or
(ITB-28-06/07
CITY OF MIAMI BEACH Amended Page 28,
28 Addendum 2)
(3) Negotiate an agreement with the lowest and best bidder exceeding the budgeted
amount of the work. If the City Manager is unable to successfully negotiate an
agreement with the lowest and best bidder, the City Manager may terminate
negotiations with such bidder and commence negotiations with the second lowest and
best bidder. If the City Manager is unable to successfully negotiate an agreement with
the second lowest and best bidder, the City Manager may terminate negotiations with
the second bidder and commence negotiations with the third lowest and best bidder.
The City Commission shall consider the City Manager's recommendation(s) and, may
approve or reject the City Manager's recommendation(s). In any case, the Mayor and
City Commission shall select and authorize negotiations with the bidder(s) which the
Mayor and Commission deem to be in the best interest of the City. The City
Commission may also reject all bids received.
The selection or approval by the City Commission shall not constitute a binding
contract between the City and the selected or approved bidder(s). A binding
contract will exist upon the completion of successful negotiations as determined by the
Administration, the City Attorney's Office form approving the contract or contracts, and
then the Mayor and City Clerk signing the contract(s) after the selected or approved
bidder(s) has (or have) done so. Only the executed contract(s) will be binding on the
contracting parties.
(ITB-28-06/07
CITY OF MIAMI BEACH Added Page 28-b,
28-b Addendum 2)
00600. CONTRACT
CONTRACT
THIS IS A CONTRACT, by and between the City of Miami Beach, a political
subdivision of the State of Florida, hereinafter referred to as CITY, and
hereinafter referred to as CONTRACTOR.
W I T N E S S E T H, that CONTRACTOR and CITY, for the considerations
hereinafter named, agree as follows:
ARTICLE 1
SCOPE OF WORK
CONTRACTOR hereby agrees to furnish all, unless specifically stated otherwise, labor,
materials, equipment, supervision, mobilization, demobilization, survey, services and
incidentals necessary to perform and complete the work to the full intent as shown or
indicated in/on the Contract Documents and related thereto for the Project.
ARTICLE 2
CONTRACT TIME
2.1 CONTRACTOR shall be instructed to commence the Work by written instructions
in the form of a Standing Order issued by the City's Procurement Director and a
Notice to Proceed issued by the Contract Administrator. Two (2) Notices to
Proceed will be issued for this Contract. CONTRACTOR shall commence
scheduling activities, permit applications and other preconstruction work within
five (5) calendar days after the Project Initiation Date, which shall be the same as
the date of the first Notice to Proceed. The first Notice to Proceed and Purchase
Order will not be issued until CONTRACTOR's submission to CITY of all required
documents (including but limited to: Payment and Performance Bonds, and
Insurance Certificate) and after execution of the Contract by both parties.
2.1.1. The receipt of all necessary permits by CONTRACTOR and acceptance
of the schedule duration as stated herein and acceptance and approval
of CONTRACTOR'S List of Deliverables, Project Schedule, Mobilization
Plan, Safety & Health Manual, Quality Control Manual, Risk
Management Plan, Schedule of Values, and attendance at the Pre-
Construction Conference to review general administrative requirements;
and to review in detail the Scope of Work and CONTRACTOR'S "Base
Line" Project Schedule is a condition precedent to the issuance of the
Second Notice to Proceed to mobilize on the Project Site and commence
with the physical construction of the Work.
(ITB-28-06/07
BID NO: 28-06/07 CITY OF MIAMI BEACH Amended Page 65,
DATE: 03/13/07 65 Addendum 2)
~~~
City of Miami Beath, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov
PROCUREMENT Division
Tel: 305-673-7490, Fax: 305.673-7851
INVITATION TO BID (ITB) NO. 28-06/07
ADDENDUM NO. 1
April 10, 2007
FOR MULTIPURPOSE MUNICIPAL PARKING FACILITY BID PACKAGE 01 UNDERGROUND
UTILITIES is amended as follows:
I. The following are answers to questions from prospective bidders.
Q. Will any of the excavated materials be reusable?
A. Please refer to the Technical Specifications section 02315.
Q. Is builder's risk insurance necessary for this project considering there is no building
involved?
A. Yes, Builder's Risk Insurance is a requirement. There are adjacent structures that may
be affected and for this reason Builder's Risk Insurance is required.
Q. Does the City have a scheduled date for Interviews from bidders in reference to this bid?
A. The Technical Review Panel will meet during the week of April 16-20 and will invite
those bidders who are deemed responsive to the bid requirements. Bidders are
requested that they have their key personnel available for interviews on the week of
April 16-20. The key personnel include the following positions:
1) Construction Project Manager
2) Construction Superintendent
Q. Sheet 65 of the bid document states "This contract is by and between the City of Miami
Beach and Ebsary Foundation, Inc." Please provide corrected sheet.
A. Attached to this Addendum is corrected page 65 to be replaced in the bid document.
II. Attached are Amended pages 28 and added page 28-b to be replaced in the bid document.
Amendments are as follows:
The words that have been strikethrough are deleted, and the words underlined are being added.
The TECHNICAL REVIEW PANEL (the "Panel"will rank all responsive bidders and will provide
their recommended ranking to the City Manager. pgases-#~-The
evaluation and scoring process to determine the ranking of bidders a+~d~e~-afe will be as
follows:
~u~-T
1) Qualifications and_Experience of Contractor's Team (2&10 points)
We are committed to providing excellent public service and safety to all who live; work, and play in our vibrant; tropical, historic community.
2) Risk Assessments (10 points). A Preliminary Project Schedule should be attached to the
~A~-Risk Assessment Plan (RAP).
3) Past performance based on number and quality of the Performance Evaluation Surveys (10
points).
D u.~v;= ri
~) 4~Presentation and Interview of Key personnel (~ 20 points).
Dui
4~ Bid Price (~ 50 points).
Scoring and ranking procedure:
The T~r~u~II~A I DC\/IC\A/ DA AICI Panel will convene and will score and rank all responsive bidders
based on the above criteria. The Panel's recommendation will be presented to the City Manager
After considering the recommendation(s) of the Panel the City Manager shall recommend to the
Mavor and Citv Commission the bid(s) that the City Manager deems to be in the best interest of the
City, unless onto one bid response is received and/or the lowest and best bid exceeds the budgeted
amount allocated towards the construction cost of the project then the City Manager without an_y
action by the Mavor and City Commission has the authority pursuant to Section 2-367 of the Miami
Beach Citv Code. to exercise any of the following options
~) Reiect the bid and, if he determines that same is in the best interest of the City re-advertise the
item for bidding; or
(2) Reauest that the Mavor and City Commission make additional funds available and proceed to
negotiate an agreement with the sole bidder or
(3) Negotiate an agreement with the lowest and best bidder exceeding the budgeted amount of the
work. If the Citv Manager is unable to successfully negotiate an agreement with the lowest and best
bidder, the Citv Manager may terminate negotiations with such bidder and commence negotiations
with the second lowest and best bidder. If the City Manager is unable to successfully negotiate an
agreement with the second lowest and best bidder the City Manager may terminate negotiations
with the second bidder and commence negotiations with the third lowest and best bidder
The Cit Commission shall consider the Cit Mana er's recommendations and ma a rove or
reiect the Citv Manager's recommendation(s) In any case the Mayor and City Commission shall
select and authorize negotiations with the bidder(s) which the Mavor and Commission deem to be in
the best interest of the Citv. The City Commission may also reject all bids received
The selection or approval by the City Commission shall not constitute a binding contract between
the City and the selected or approved bidder(s) A binding contract will exist upon the completion of
successful negotiations as determined by the Administration the City Attorney's Office form
approvma the contract or contracts and then the Mayor and City Clerk signing the contract(s) after
the selected or approved bidder(s) has (or have) done so Only the executed contract(s) will be
bmdmct on the contracting parties.
bb~ are commixed .o providing exce?len? pub?i;: sen~ice and scfeiy to cJ,i who live; work, end play in our vibrant, nopical, his!arc communi,h-
Bidders are advised to acknowledge this Addendum on ITB document Page 138, "Acknowledgement
of Addenda", or the bid may be considered non-responsive.
CITY OF MIAMI BEACH
Gus Lopez, CPPO
Procurement Director
rm
F:\PU RC\$ALL1Romanlbids107\tTB-28-06-07\itb-28-06-07A1.doc
VVe are committed .o praviding exce!ierr! Cuv4c sen~ice and scfe!y !o vi! who live; work, end play it our vibrant;rropice, his!orc com,„nuni!y.
00305. TECHNICAL REVIEW PANEL SELECTION CRITERIA /
SELECTION PROCESS
The Evaluation process to be used by the City for this bid will be one of "Best Value
Procurement", meaning that the City will, in addition to price, consider past performance
on previous contracts, Risk Assessment for this ITB, Qualifications of Personnel
proposed, and presentation and interview of Contractor's personnel. (See Section
00315)
The procedure to be used for bid evaluation and selection is as follows:
• Invitation to Bid issued.
• Pre-Bid Meeting.
• Receipt of bids.
• Opening and listing (except pricing) of all bids received.
• Review all bids for responsiveness.
• Distribution of all responsive bids to the Technical Review Panel.
The TECHNICAL REVIEW PANEL (the "Panel") will rank all responsive bidders and will
provide their recommended ranking to the City Manager. The evaluation and scoring
process to determine the ranking of bidders will be as follows
1) Qualifications and Experience of Contractor's Team (10 points)
2) Risk Assessments (10 points). A Preliminary Project Schedule should be
attached to the Risk Assessment Plan (RAP).
3) Past performance based on number and quality of the Performance Evaluation
Surveys (10 points).
4) Presentation and Interview of Key personnel (20 points).
5) Bid Price (50 points).
Scoring and ranking_procedure:
The Panel will convene and will score and rank all responsive bidders based on the
above criteria. The Panel's recommendation will be presented to the City Manager.
After considering the recommendation(s) of the Panel, the City Manager shall
recommend to the Mayor and City Commission the bid(s) that the City Manager deems
to be in the best interest of the City, unless only one bid response is received, and/or
the lowest and best bid exceeds the budgeted amount allocated towards the
construction cost of the project, then the City Manager, without any action by the Mayor
and City Commission, has the authority, pursuant to Section 2-367 of the Miami Beach
City Code, to exercise any of the following options:
(1) Reject the bid and, if he determines that same is in the best interest of the City, re-
advertise the item for bidding; or
(2) Request that the Mayor and City Commission make additional funds available and
proceed to negotiate an agreement with the sole bidder; or
(ITB-28-06/07
CITY OF MIAMI BEACH Amended Page 28,
18 Addendum 1)
(3) Negotiate an agreement with the lowest and best bidder exceeding the budgeted
amount of the work. If the City Manager is unable to successfully negotiate an
agreement with the lowest and best bidder, the City Manager may terminate
negotiations with such bidder and commence negotiations with the second lowest and
best bidder. If the City Manager is unable to successfully negotiate an agreement with
the second lowest and best bidder, the City Manager may terminate negotiations with
the second bidder and commence negotiations with the third lowest and best bidder.
The City Commission shall consider the City Manager's recommendation(s) and, may
approve or reject the City Manager's recommendation(s). In any case, the Mayor and
City Commission shall select and authorize negotiations with the bidder(s) which the
Mayor and Commission deem to be in the best interest of the City. The City
Commission may also reject all bids received.
The selection or approval by the City Commission shall not constitute a binding
contract between the City and the selected or approved bidder(s). A binding
contract will exist upon the completion of successful negotiations as determined by the
Administration, the City Attorney's Office form approving the contract or contracts, and
then the Mayor and City Clerk signing the contract(s) after the selected or approved
bidder(s) has (or have) done so. Only the executed contract(s) will be binding on the
contracting parties.
(ITB-28-06/07
CITY OF MIAMI BEACH Added Page 28-b,
28-b Addendum 1)
00600. CONTRACT
CONTRACT
THIS IS A CONTRACT, by and between the City of Miami Beach, a political
subdivision of the State of Florida, hereinafter referred to as CITY, and
hereinafter referred to as CONTRACTOR.
W I T N E S S E T H, that CONTRACTOR and CITY, for the considerations
hereinafter named, agree as follows:
ARTICLE 1
SCOPE OF WORK
CONTRACTOR hereby agrees to furnish all, unless specifically stated otherwise, labor,
materials, equipment, supervision, mobilization, demobilization, survey, services and
incidentals necessary to perform and complete the work to the full intent as shown or
indicated in/on the Contract Documents and related thereto for the Project.
ARTICLE 2
CONTRACT TIME
2.1 CONTRACTOR shall be instructed to commence the Work by written instructions
in the form of a Standing Order. issued by the City's Procurement Director and a
Notice to Proceed issued by the Contract Administrator. Two (2) Notices to
Proceed will be issued for this Contract. CONTRACTOR shall commence
scheduling activities, permit applications and other preconstruction work within
five (5) calendar days after the Project Initiation Date, which shall be the same as
the date of the first Notice to Proceed. The first Notice to Proceed and Purchase
Order will not be issued until CONTRACTOR's submission to CITY of all required
documents (including but limited to: Payment and Performance Bonds, and
Insurance Certificate) and after execution of the Contract by both parties.
2.1.1. The receipt of all necessary permits by CONTRACTOR and acceptance
of the schedule duration as stated herein and acceptance and approval
of CONTRACTOR'S List of Deliverables, Project Schedule, Mobilization
Plan, Safety & Health Manual, Quality Control Manual, Risk
Management Plan, Schedule of Values, and attendance at the Pre-
Construction Conference to review general administrative requirements;
and to review in detail the Scope of Work and CONTRACTOR'S "Base
Line" Project Schedule is a condition precedent to the issuance of the
Second Notice to Proceed to mobilize on the Project Site and commence
with the physical construction of the Work.
(ITB-28-06/07
BID NO: 28-06/07 CITY OF MIAMI BEACH Amended Page 65,
DATE: 03/13/07 65 Addendum l)
TABLE OF CONTENTS
PAGE
NOTICE FOR BIDS ......................................................................................................... 6
NO BID NOTIFICATION FORM ..................................................................................... 9
00100. GENERAL INSTRUCTIONS TO BIDDERS ............................................. 10
00200. DEFINITIONS .......................................................................................... 11
00300. INSTRUCTIONS TO BIDDERS ............................................................... 14
1. Examination of Contract Documents and Site ............................... 14
2. Pre-Bid Interpretations .................................................................. 14
3. Submitting Bids ............................................................................. 15
4. Printed Form of Bid ....................................................................... 15
5. Bid Guaranty ................................................................................. 15
6. Acceptance or Rejection of Bids ................................................... 15
7. Determination of Award ................................................................. 16
8. Evaluation ..................................................................................... 16
9. Contract Price... ............................................................................. 16
10. Postponement of Date for Presenting and Opening of Bids.......... 16
11. Qualifications of Bidders ............................................................... 16
12. Addenda and Modifications ........................................................... 17
13. Prevailing Wage Rates .................................................................. 17
14. Occupational Health and Safety .................................................... 17
15. Environmental Regulations ........................................................... 18
16. "Or Equal" Clause ......................................................................... 18
17. Protested Solicitation and Award .................................................. 18
18. Financial Stability and Strength ..................................................... 18
19. Equal Benefit Ordinance ............................................................... 19
00305. TECHNICAL REVIEW PANEL SELECTION CRITERIA/
SELECTION PROCESS .......................................................................... 28
00310. BID SUBMISSION REQUIREMENTS ................................:..................... 29
00315. BEST VALUE PROCUREMENT ATTACHMENTS AND FORMS ........... 32
00400. BID/TENDER FORM ................................................................................44
00405. CITY OF MIAMI BEACH LICENSES, PERMITS AND FEES ................... 47
00407. SCHEDULE OF PRICES BID .................................................................. 48
Bid Form .................................................................................................. 49
List of Unit Prices ..................................................................................... 50
00410. BID GUARANTY FORM
UNCONDITIONAL LETTER OF CREDIT ................................................ 51
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 2
TABLE OF CONTENTS
(Continued)
00500. SUPPLEMENT TO BID/TENDER FORM
QUESTIONNAIRE ................................................................................... 53
00520. SUPPLEMENT TO BID/TENDER FORM
NON-COLLUSION CERTIFICATE .......................................................... 59
00530. SUPPLEMENT TO BID/TENDER FORM
DRUG FREE WORKPLACE CERTIFICATION ....................................... 60
00540. SUPPLEMENT TO BID/TENDER FORM
TRENCH SAFETY ACT ........................................................................... 62
00550. RECYCLED CONTENT INFORMATION ................................................. 64
00600. CONTRACT .............................................................................................65
Article 1. Scope of Work .......................................................................... 65
Article 2. Contract Time ........................................................................... 65
Article 3. The Contract Sum ..................................................................... 68
Article 4. Progress payments ................................................................... 69
Article S.Acceptance and Final Payment ................................................. 70
Article 6. Miscellaneous ........................................................................... 71
00708. FORM CERTIFICATE OF INSURANCE .................................................. 76
00710. FORM OF PERFORMANCE BOND ........................................................ 77
00720. FORM OF PAYMENT BOND ................................................................... 80
00721. CERTIFICATE AS TO CORPORATE PRINCIPAL .................................. 83
00735. PERFORMANCE AND PAYMENT GUARANTY FORM
UNCONDITIONAL LETTER OF CREDIT ................................................ 84
00740. MIAMI BEACH CONVENTION CENTER EXIBIT SCHEDULE ..............
00800. GENERAL CONDITIONS ........................................................................ 86
1. Contract Documents ..................................................................... 86
2. Intention of City ............................................................................. 86
3. Preliminary Matters ....................................................................... 86
4. Performance Bond and Payment Bond ......................................... 89
5. Qualification of Surety ................................................................... 90
6. Indemnification .............................................................................. 91
7. Insurance Requirements ............................................................... 92
8. Labor and Materials ...................................................................... 95
9. Royalties and Patents ................................................................... 95
10. Weather ........................................................................................ 95
BID NO: 28-06/07 CITY OF MIAMI BEACH.
DATE: 03/13/07 3
TABLE OF CONTENTS
(Continued)
11. Permits, Licenses and Impact Fees .............................................. 96
12. Resolution of Disputes ................................................................ .. 96
13. Inspection of Work ...................................................................... .. 97
14. Superintendence and Supervision .............................................. .. 98
15. City's Right to Terminate Contract ................................................ 99
16. Contractor's Right to Stop Work or
Terminate Contract ..................................................................... 101
17. Assignment ................................................................................. 101
18. Rights of Various Interests .......................................................... 101
19. Differing Site Conditions .............................................................. 101
20. Plans and Working Drawings ...................................................... 102
21. Contractor to Check Plans,
Specifications, and Data ............................................................. 102
22. Contractor's Responsibility for
Damages and Accidents ............................................................. 103
23. Warranty ..................................................................................... 103
24. Supplementary Drawings ............................................................ 103
25. Defective Work ............................................................................ 103
26. Taxes .......................................................................................... 104
27. Subcontracts ............................................................................... 104
28. Separate Contracts ..................................................................... 105
29. Use of Completed Portions ......................................................... 106
30. Lands for Work ............................................................................ 107
31. Legal Restrictions and Traffic Provisions .................................... 107
32. Location and Damage to Existing
Facilities, Equipment or Utilities .................................................. 107
33. Value Engineering ....................................................................... 108
34. Continuing the Work .................................................................... 108
35. Changes in the Work or Terms
of Contract Documents ............................................................... 109
36. Field Orders and Supplemental Instructions ............................... 109
37. Change Orders ............................................................................ 109
38. Value of Change Order Work ...................................................... 110
39. Notification and Claim for Change of
Contract Time or Contract Price .................................................. 115
40. No Damages for Delay ................................................................ 115
41. Excusable Delay; Compensable; Non-Compensable ................. 116
42. Substantial Completion ............................................................... 117
43. No Interest .................................................................................. 117
44. Shop Drawings ............................................................................ 117
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/1.3/07 4
TABLE OF CONTENTS
(Continued)
45. Assignment ................................................................................. 119
46. Safety and Protection .................................................................. 119
47. Final Bill of Materials ................................................................... 121
48. Payment by City for Tests ........................................................... 121
49. Project Sign ................................................................................. 121
50. Hurricane Precautions ................................................................. 121
51. Cleaning Up; City's Right to Clean Up ......................................... 122
52. Removal of Equipment ................................................................ 122
53. Nondiscrimination, Equal Employment Opportunity,
and Americans with Disabilities Act ............................................. 122
54. Project Records ........................................................................... 123
00900. SUPPLEMENTARY CONDITIONS ........................................................ 124
00920. ADDITIONAL ARTICLES ....................................................................... 127
1. Prevailing Wage Rate Ordinance ................................................ 127
2. Federal Grant Projects ................................................................ 127
00922. STATEMENT OF COMPLIANCE
(PREVAILING WAGE RATE ORDINANCE NO. 83-72) ......................... 128
00923. STATEMENT OF COMPLIANCE
(DAVIS BACON ACT) ............................................................................ 129
00925. CERTIFICATE OF SUBSTANTIAL COMPLETION ............................... 130
00926. FINAL CERTIFICATE OF PAYMENT .................................................... 132
00930. FORM OF FINAL RECEIPT .................................................................... 133
00950. DRAWINGS INDEX ............................................................................... 135
01000. ADDENDA AND MODIFICATIONS ....................................................... 136
02000. TECHNICAL SPECIFICATIONS ............................................................ 137
04000. ACKNOWLEDGEMENT OF ADDENDA ................................................ 138
06000 PROPOSED SUBCONTRACTOR LISTING INFORMATION ............... 139
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/1.3/07 5
~~~~~ ~C
City of Miami Boach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov
PROCUREMENT DIVISION PUBLIC NOTICE
Tel: 305-673-7490, Fax: 305-673-7851
INVITATION TO BID (ITB) 28-06/07
FOR MULTIPURPOSE MUNICIPAL PARKING FACILITY
BID PACKAGE 01-UNDERGROUND UTILITIES
Sealed bids will be received by the City of Miami Beach Procurement Director, 3rd
Floor, 1700 Convention Center Drive, Miami Beach, Florida 33139, until 3:00 p.m. on
the 16th day of April 2007 for: MULTIPURPOSE MUNICIPAL PARKING FACILITY BID
PACKAGE 01-UNDERGROUND UTILITIES
Scope of Work:
The Scope of Work included in the construction of this Lump Sum Bid shall include but
not be limited to furnishing all, unless specifically stated otherwise, labor, material,
equipment, supervision, mobilization, demobilization, survey, overhead and profit,
bonds, insurance, permits and taxes to complete the work to the full intent as shown or
indicated in/on the Bid Documents.
A brief description of the overall Project is as follows:
Construction of a fully functional seven (7) level parking facility having six hundred fifty
(650) parking spaces, approximately thirty two thousand (32,000) square feet of
commercial space and associated site improvements. The Project is to be located on
the East side of Meridian Avenue North of 17th Street currently the "P" lot adjacent to
777 17th Street.
A brief description of Bid Package 01 -Underground Utilities
Demolition and disposal of the existing; parking areas hard surfaces, curbs and gutters
and associated utilities where required; Furnish and installation of a new 12" potable
water system; Furnish and installation of new storm sewer system including drainage
wells; Furnish and installation of a new sanitary sewer system; Furnish and installation
of underground electrical power supply system; Furnish and installation of
miscellaneous underground conduits for data and telephone systems; Furnish and
installation of a reinforced concrete slab over existing box culvert on Meridian Court;
Road work including paving; The termination of utilities, with future connection (by
others), to be extended to one foot above grade and painted red; Provision of a signed
and sealed survey (by a registered surveyor in the state of Florida) on completion of the
SOW.
Estimated Budget: $850,000.00
Minimum Requirements: Bidder (Business Entity) must be licensed as a General
Contractor in the State of Florida. Bidder shall be required to provide proof with their Bid
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 6
of having satisfactorily constructed on schedule, as a General Contractor, at least three
(3) construction projects each in excess of five hundred thousand dollars ($500,000).
General Contractor will be required to self perform, at a minimum, seventy five percent
(75%) of the work.
Bid Guaranty: A Bid Guaranty of 5% is reauired with bid submission, and the
successful Bidder executing the Contract will be required to provide Performance and
Payment Bonds in the amount of one hundred percent (100%) of the contract amount.
Bidders will be required to submit a letter of intent, from an A rated Financial Class V
surety company to bond the Project.
At the time, date, and place above, bids will be publicly opened. Any bids received after
time and date specified will be returned to the bidder unopened. The responsibility for
submitting a bid before the stated time and date is solely and strictly the responsibility of
the bidder. The City is not responsible for delays caused by mail, courier service,
including U.S. Mail, or any other occurrence.
A Pre-Bid Conference will be held at 10:00 a.m. on March 29, 2007 at the City of
Miami Beach City Hall, 4th Floor, Mayor's Conference Room, located at 1700
Convention Center Drive, Miami Beach, FL 33139.
Attendance (in person or via telephone) to this Pre-Bid submission meeting is
encouraged and recommended as a source of information but is not mandatory.
Bidders interested in participating in the Pre-Bid submission meeting via telephone must
follow these steps:
(1) Dial the TELEPHONE NUMBER: 1-800-915-8704 (Toll-free North America)
(2) Enter the MEETING NUMBER: *2659980* (note that number is preceded and
followed by the star (*) key).
Bidders who are interested in participating via telephone, please send an a-mail to
romanmartinez@miamibeachfl.gov expressing your intent to participate via telephone.
Plans and Specifications for this project are available in digital format. Please call the
City of Miami Beach Procurement Division at 305-673-7490 to secure a CD copy of the
Plans and Specifications. The cost for the plans and specifications CD is $10.00,
company checks and cash accepted no credit cards please.
The City of Miami Beach has contracted with BidNet and is utilizing a central bid
notification system created exclusively for state and local agencies located in South
Florida. This South Florida Purchasing system allows for vendors to register online and
receive notification of new bids, amendments and awards. Vendors with Internet access
should review the registration options at the following website:
www.govbids.com/scripts/southflorida/public/home1.asp.
If you do not have Internet access, please call the BidNet(s) support group at 800-677-
1997 extension # 214.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/1.3/07 7
Interested bidders who would like to know particulars of this and other bids for the City
of Miami Beach should view the City's Procurement Division's web page at
http://www. miamibeachfl.aov/newcity/depts/purchase/bid intro. asp
Any questions or clarifications concerning this Invitation to Bid shall be submitted in
writing by mail or facsimile to the Procurement Department, 1700 Convention Center
Drive, Miami Beach, FL 33139 FAX: (305) 673-7851 no later than March 6, 2007. The
Bid title/number shall be referenced on all correspondence. All responses to
questions/clarifications will be sent to all prospective bidders in the form of an
addendum. The City of Miami Beach reserves the right to accept any proposal or bid
deemed to be in the best interest of the City of Miami Beach, or waive any informality in
any proposal or bid. The City of Miami Beach may reject any and all proposals or bids.
To request this material in accessible format, sign language interpreters, information on
access for persons with disabilities, and/or any accommodation to review any document
or participate in any city-sponsored proceeding, please contact 305-604-2489 (voice) or
305-673-7218 (TTY) five days in advance to initiate your request. TTY users may also
call 711 (Florida Relay Service).
YOU ARE HEREBY ADVISED THAT THIS REQUEST FOR PROPOSAL IS SUBJECT
TO THE CAMPAIGN CONTRIBUTIONS BY VENDORS ORDINANCE NO. 2003-3389.
YOU ARE HEREBY ADVISED THAT THIS REQUEST FOR PROPOSAL IS SUBJECT
TO THE FOLLOWING ORDINANCES/RESOLUTIONS, WHICH MAY BE FOUND ON
THE CITY OF MIAMI BEACH WEBSITE:
http://www.miamibeachfl.gov/newcity/depts/purchase/bid intro.asp
• CONE OF SILENCE -- ORDINANCE NO. 2002-3378
• CODE OF BUSINESS ETHICS -- RESOLUTION NO. 2000-23879.
• DEBARMENT PROCEEDINGS -- ORDINANCE NO. 2000-3234.
• PROTEST PROCEDURES -- ORDINANCE N0.2002-3344.
• LOBBYIST REGISTRATION AND DISCLOSURE OF FEES -- ORDINANCE NO.
2002-3363
• REQUIREMENT FOR CITY CONTRACTORS TO PROVIDE EQUAL BENEFITS
FOR DOMESTIC PARTNERS -ORDINANCE NO. 2005-3494
CITY OF MIAMI BEACH
P~
Gus Lopez, CPPO
Procurement Director
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 8
m MIAMIBEACH
City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov
PROCUREMENT DIVISION
Tel: 305-673-7490, Fax: 305-673-7851
ITB No. 28-06/07
MULTIPURPOSE MUNICPAL PARKING FACILTY
BID PACKAGE 01 -UNDERGROUND UTILITIES
NOTICE TO PROSPECTIVE BIDDERS
NO INTEREST IN SUBMITTING A BID:
If not submitting a bid at this time, please detach this sheet from the bid documents, complete the
information requested, and return to the address listed above.
NO BID SUBMITTED FOR REASON(S) CHECKED AND/OR INDICATED:
Our company does not handle this type of product/service.
We cannot meet the specifications nor provide an alternate equal product.
Our company is simply not interested in bidding at this time.
Due to prior commitments, I was unable to attend pre-proposal meeting.
Timely payment by the City is a concern.
OTHER. (Please specify)
We do _ do not _ want to be retained on your mailing list for future bids for this type or
product and/or service.
Signature:
Title:
Company:
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 9
00100. GENERAL INSTRUCTIONS TO BIDDERS:
General: The following instructions and those set forth in Section 00300 herein
are given for the purpose of guiding Bidders in properly preparing their bids.
Such instructions have equal force and weight with other portions of the Contract
Documents and strict compliance is required with all the provisions contained in
the instructions. Bidders shall note that various paragraphs within these bid
documents have a [ ]box which may be checked. If the box is checked, the
language is made a part of the bid documents and compliance therewith is
required of the Bidder; if the box is not checked, the language is not made a part
of the bid documents.
2. Scope of Work: The Scope of Work included in this Lump Sum Bid shall include
but not be limited to furnishing all, unless specifically stated otherwise, labor,
material, equipment, supervision, mobilization, demobilization, survey, overhead
and profit, bonds, insurance, permits and taxes to complete the work to the full
intent as shown or indicated in/on the Bid Documents.
A brief description of Bid Package 01 -Underground Utilities
Demolition and disposal of the existing; parking areas hard surfaces, curbs and
gutters and associated utilities where required; Furnish and installation of a new
12" potable water system; Furnish and installation of new storm sewer system
including drainage wells; Furnish and installation of a new sanitary sewer system;
Furnish and installation of underground electrical power supply system; Furnish
and installation of miscellaneous underground conduits for data and telephone
systems; Furnish and installation of a reinforced concrete slab over existing box
culvert on Meridian Court; Road work including paving; The termination of
utilities, with future connection (by others), to be extended to one foot above
grade and painted red; Provision of a signed and sealed survey (by a registered
surveyor in the state of Florida) on completion of the SOW.
3. Location of Work: The Project is to be located on the East side of Meridian
Avenue North of 17th Street, currently the "P" lot adjacent to 777, 17th. Street.
4. Abbreviations and Symbols: The abbreviations used throughout the Contract
Documents are defined hereinafter in the Technical Specifications. The symbols
used in the Plans are defined therein.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/1.3/07 10
00200. DEFINITIONS:
1. Definitions: Whenever the following terms or pronouns in place of them appear
in the Project Manual, the intent and meaning shall be interpreted as follows:
1.1. Bidder: Any individual, firm, or corporation submitting a bid for this
Project, acting directly or through a duly authorized representative.
1.2. Change Order: A written document ordering a change in the Contract
Scope.
1.3. City: The City (or Owner) shall mean the City of Miami Beach, a Florida
municipal corporation, having its principal offices at 1700 Convention
Center Drive, Miami Beach, Florida 33139, which is a party hereto and
/or for which this Contract is to be performed. In all respects hereunder,
City's performance is pursuant to City's position as the owner of a
construction project. In the event City exercises its regulatory authority
as a governmental body, the exercise of such regulatory authority and
the enforcement of any rules, regulations, laws and ordinances shall be
deemed to have occurred pursuant to City's regulatory authority as a
governmental body and shall not be attributable in any manner to City
as a party to this Contract.
1.4. City Commission: City Commission shall mean the governing and
legislative body of the City.
1.5. City Manager: City Manager shall mean the Chief Administrative Officer
of the City.
1.6. Consultant: Architect or Engineer who has contracted with City or who
is an employee of City, to provide professional services for this Project..
1.7. Contract: The part or section of the Contract Documents addressing
some of the rights and duties of the parties hereto, including but not
limited to contract time and liquidated damages.
1.8. Contract Documents Clarification: (Not Applicable)
1.9. Contract Administrator (Program Manager): The City's Contract
Administrator shall mean the individual appointed by the City Manager
who shall be the City's authorized representative to coordinate, direct,
and review on behalf of the City, all matters related to the Project. The
City's Contract Administrator for the Project shall be the Program
Manager.
1.10. Contract Documents: The official documents setting forth Bidding
information and requirements, General and Supplemental Conditions,
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/] 3/07 11
drawings (plans) and specifications, the Notice for Bids, Addenda, if
any, the Bid Tender Form, the Bid Bond, the record of the award by the
City Commission, the Performance Bond and Payment Bond, the Notice
of Award, the Notice(s) to Proceed, the Purchase Order, Change
Orders, Field Orders, Supplemental Instructions, and any and all
additional documents the submission of which are required by this
Project, are the documents which are collectively referred to as the
Contract Documents.
1.11. Contract Price: The original amount established in the bid submittal and
award by the City, as may be amended by Change Order.
1.12. Contract Time: The original time between commencement and
completion, including any milestone dates thereof, established in
Article 2 of the Contract, as may be amended by Change Order.
1.13. Contractor: The person, firm, or corporation with whom the City has
contracted and who is responsible for the acceptable performance of
the Work and for the payment of all legal debts pertaining to the Work.
All references in the Contract Documents to third parties under contract
or control of Contractor shall be deemed to be a reference to
Contractor.
1.14. Field Order: A written order which orders minor changes in the Work but
which does not involve a change in the Contract Price or Contract Time.
1.15. Final Completion: The date certified by Consultant in the Final
Certificate of Payment upon which all conditions and requirements of
any permits and regulatory agencies have been satisfied; any
documents required by the Contract Documents have been received by
Consultant; any other documents required to be provided by Contractor
have been received by Consultant; and to the best of Consultant's
knowledge, information and belief the Work defined herein has been
fully completed in accordance with the terms and conditions of the
Contract Documents.
1.16. Inspector: An authorized representative of Consultant or City assigned
to make necessary inspections of materials furnished by Contractor and
of the work performed by Contractor.
1.17. Materials: Materials incorporated in this Project, or used or consumed
in the performance of the Work.
1.18. Notice(s) to Proceed: Written notice to Contractor authorizing the
commencement of the activities identified in the notice or as described
in the Contract Documents.
1.19. Plans and/or Drawings: The official graphic representations of this
Project which are a part of the Contract Documents.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 12
1.20. Program Manager: The City has contracted the services of URS
Corporation as the Program Manager for this Project who will act as the
Contract Administrator.
1.21. Project: The construction project described in the Contract Documents,
including the Work described therein.
1.22. Project Initiation Date: The date upon which the Contract Time
commences.
1.23. Project Manual: Please refer to item 1.10 -Contract-Documents.
1.24. Resident Project Representative: An authorized representative of
Consultant or Program Manager assigned to represent Consultant or
Program Manager on the Project.
1.25. Subcontractor: A person, firm or corporation having a direct contract
with Contractor including one who furnishes material worked to a
special design according to the Contract Documents, but does not
include one who merely furnishes Materials not so worked.
1.26. Substantial Completion: The date certified by Consultant when all
conditions and requirements of permits and regulatory agencies have
been satisfied and the Work is sufficiently complete in accordance with
the Contract Documents so the Project is available for beneficial
occupancy by City. A Certificate of Occupancy or Certificate of
Completion must be issued for Substantial Completion to be achieved,
however, the issuance of a Certificate of Occupancy or Certificate of
Completion or the date thereof are not to be determinative of the
achievement or date of Substantial Completion.
1.27. Surety: The surety company or individual which is bound by the
performance bond and payment bond with and for Contractor who is
primarily liable, and which surety company or individual is responsible
for Contractor's satisfactory performance of the work under the contract
and for the payment of all debts pertaining thereto in accordance with
Section 255.05, Florida Statutes.
1.28. Work: The construction and services required by the Contract
Documents, whether completed or partially completed, and includes all
other labor, materials, equipment and services provided or to be
provided by Contractor to fulfill Contractor's obligations. The Work may
constitute the whole or a part of the Project.
1.29. RFI: Request for Information (RFI). When the CONTRACTOR, during
the course of construction, is uncertain regarding the interpretation of a
specific item in the plans or technical specifications he shall immediately
bring the issue to the attention of the PROGRAM MANAGER. The
Program Manager shall review the question and if not able to find the
answer to the question in the plans and specifications the
CONTRACTOR shall generate an RFI stating his question and submit it
to the PROGRAM MANAGER who shall forward it to the
CONSULTANT for a response.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/]3/07 l3
00300. INSTRUCTIONS TO BIDDERS:
Examination of Contract Documents and Site: It is the responsibility of each
Bidder before submitting a Bid, to:
1.1. Examine the Contract Documents thoroughly,
1.2. Visit the site or structure to become familiar with conditions that may
affect costs, progress, performance or furnishing of the Work,
1.3. Take into account federal, state and local (City and Miami-Dade
County) laws, regulations, ordinances that may affect costs, progress,
performance, furnishing of the Work, or award,
1.4. Study and carefully correlate Bidder's observations with the Contract
Documents, and
1.5. Carefully review the Contract Documents and notify Consultant of all
conflicts, errors or discrepancies in the Contract Documents of which
Bidder knows or reasonably should have known.
1.6. Take into account the necessary allowances, of time and cost, due to the
potential impact of the Miami Beach Convention Center's Schedule of
Events and the restrictions imposed by the planned events there upon the
Project (see attached schedule).
The submission of a Bid shall constitute an incontrovertible representation by
Bidder that Bidder has complied with the above requirements and that without
exception, the Bid is premised upon performing and furnishing the Work required
by the Contract Documents and that the Contract Documents are sufficient in
scope and detail to indicate and convey understanding of all terms and
conditions for performance and furnishing of the Work.
2. Pre-Bid Interpretations: Only questions answered by written Addenda will be
binding. Oral and other interpretations or clarifications will be without legal effect.
All questions about the meaning or intent of the Contract Documents are to be
directed to the City's Procurement Director in writing. Interpretations or
clarifications considered necessary by the City's Procurement Director in
response to such questions will be issued by City by means of Addenda mailed
or delivered to all parties recorded by the City's Procurement Director as having
received the Bid Documents. Written questions should be received no less than
ten (10) calendar days prior to the date of the opening of Bids. There shall be no
obligation on the part of City or the City's Procurement Director to respond to
questions received less than ten (10) calendar days prior to bid opening.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/l3/07 14
3. Submitting Bids: All bids must be received in the Procurement Division, City of
Miami Beach, 1700 Convention Center Drive, Third Floor, Miami Beach, Florida
33139, before the time and date specified for bid opening, enclosed in a sealed
envelope, legibly marked on the outside:
BID FOR: Multipurpose Municipal Parking Facility
Bid Package 01-Underground Utilities
BID/CONTRACT NO.: 28-06/07
4. Printed Form of Bid: All bids must be made upon the blank Bid/Tender Form
included herein and must give the price in strict accordance with the instructions
thereon. The bid must be signed and acknowledged by the Bidder in accordance
with the directions on the bid form.
5. Bid Guaranty: All bids shall be accompanied by an original bid bond executed by
a surety company meeting the qualifications for surety companies as specified in
Section 5, General Conditions. The Bid Bond shall be equal to, ,
,five percent (5%) of the Bid price and be made in
favor $8~a~a~le-te of the City of Miami Beach, Florida, and conditioned upon
the-successful Bidder executing the Contract and providing the required one-
hundred percent (100%) Performance Bond and Payment Bond and evidence of
required insurance within fifteen (15) calendar days after notification of award of
the Contract. A PERSONAL CHECK OR A COMPANY CHECK OF A BIDDER
SHALL NOT BE DEEMED A VALID BID SECURITY. Security of the successful
Bidder shall be forfeited to the City of Miami Beach as liquidated damages, not
as a penalty, for the cost and expense incurred should said Bidder fail to execute
the Contract, provide the required Performance Bond, Payment Bond and
Certificate(s) of Insurance, -within fifteen (15) calendar days after notification of
the award of the Contract, or failure to comply with any other requirements set
forth herein. The time for execution of the Contract and provision of the
Performance Bond, Payment Bond and Certificate(s) of Insurance may be
extended by the City's Procurement Director for good cause shown. Bid
Securities of the unsuccessful Bidders will be returned after award of Contract.
6. Acceptance or Rejection of Bids: The City reserves the right to reject any or all
bids prior to award. Reasonable efforts will be made to either award the Contract
or reject all bids within ninety (90) calendar days after bid opening date. A Bidder
may not withdraw its bid unilaterally nor change the Contract Price before the
expiration of ninety (90) calendar days from the date of bid opening. A Bidder
may withdraw its bid after the expiration of ninety (90) calendar days from the
date of bid opening by delivering written notice of withdrawal to the Purchasing
Division prior to award of the Contract by the City Commission.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 15
7. Determination of Award: The City Commission shall award the contract to the
lowest and best qualified bidder. In determining the lowest best qualified
bidder's bid, bidders will be evaluated on the following:
a. The ability, capacity and skill of the bidder to perform the Contract.
b. Whether the bidder can perform the Contract within the time specified,
without delay or interference.
c. The character, integrity, reputation, judgement, experience and
efficiency of the bidder.
d. The quality of performance of previous contracts.
e. The previous and existing compliance by the bidder with laws and
ordinances relating to the Contract.
8. Evaluation: An interim performance evaluation of the successful Contractor may
be submitted by the Contract Administrator during construction of the Project. A
final performance evaluation shall be submitted when the Request for Final
Payment to the construction contractor is forwarded for approval. In either
situation, the completed evaluation(s) shall be forwarded to the City's
Procurement Director who shall provide a copy to the successful
CONTRACTOR. Said evaluation(s) may be used by the City as a factor in
considering the responsibility of the successful CONTRACTOR for future bids
with the City.
9. Contract Price: The Contract Price shall include furnishing all labor, materials,
equipment including tools, supervision, mobilization, demobilization, survey,
services, bonds, insurance, permit fees, applicable taxes, overhead and profit for
the completion of the Work, except as may be otherwise expressly provided in
the Contract Documents.
10. Postponement of Date for Presenting and Opening of Bids: The City reserves
the right to postpone the date for receipt and opening of bids and will make a
reasonable effort to give at least seven (7) calendar days written notice of any
such postponement to each prospective Bidder.
11. Qualifications of Bidders: Bids shall be considered only from Contractors which
submit their bid by the bid's due date; Bidders who meet the "Minimum
Requirements"; Bidders that provide the 5% Bid Bond; and Bidders that submit
all required documentation as requested under this Invitation to Bid.
In determining a Bidder's responsibility and ability to perform the Contract, City
has the right to investigate and. request information concerning the financial
condition, experience record, personnel, equipment, facilities, principal business
location and organization of the Bidder, the Bidder's record with environmental
regulations, and the claims/litigation history of the Bidder.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 16
12. Addenda and Modifications: The City shall make reasonable efforts to issue
addenda within seven (7) calendar days prior to bid opening. All addenda and
other modifications made prior to the time and date of bid opening shall be
issued as separate documents identified as changes to the Contract Documents.
13. Prevailing Wage Rates: City of Miami Beach Ordinance No, 94-2960 provides
that in all non-federally funded construction contracts in excess of one million
dollars to which the City of Miami Beach is a party, the rate of wages and fringe
benefits, or cash equivalent, for all laborers, mechanics and apprentices
employed by any contractor or subcontractor on the work covered by the
contract, shall not be less than the prevailing rate of wages and fringe benefit
payments or cash equivalence for similar skills or classifications of work, as
established by the Federal Register, in the City of Miami Beach, Florida. The
provisions of this Ordinance shall not apply to the following projects:
a. water, except water treatment facilities and lift stations;
b. sewer, except sewage treatment facilities and lift stations;
c. storm drainage;
d. road construction, except bridges or structures requiring pilings;
and
e. beautification projects, which may include resurfacing new curbs,
gutters, pavers, sidewalks, landscaping, new lighting, bus shelters,
bus benches and signage.
14. Occupational Health and Safety: In compliance with Chapter 442, Florida
Statutes, any toxic substance listed in Section 38F-41.03 of the Florida
Administrative Code delivered as a result of this bid must be accompanied by a
Material Safety Data Sheet (MSDS) which may be obtained from the
manufacturer. The MSDS must include the following information:
14.1. The chemical name and the common name of the toxic substance.
14.2. The hazards or other risks in the use of the toxic substance, including:
14.2.1. The potential for fire, explosion, corrosion, and reaction;
14.2.2. The known acute and chronic health effects of risks from
exposure, including the medical conditions which are
generally recognized as being aggravated by exposure to
the toxic substance; and
14.2.3. The primary routes of entry and symptoms of overexposure.
14.3. The proper precautions, handling practices, necessary personal
protective equipment, and other safety precautions in the use of or
exposure to the toxic substances, including appropriate emergency
treatment in case of overexposure.
14.4. The emergency procedure for spills, fire, disposal, and first aid.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/1.3/07 17
14.5. A description in lay terms of the known specific potential health risks
posed by the toxic substance intended to alert any person reading this
information.
14.6. The year and month, if available, that the information was compiled and
the name, address, and emergency telephone number of the
manufacturer responsible for preparing the information.
15. Environmental Regulations: The City reserves the right to consider a Bidder's
history of citations and/or violations of environmental regulations in investigating
a Bidder's responsibility, and further reserves the right to declare a Bidder not
responsible if the history of violations warrant such determination in the opinion
of the City. Bidder shall submit with its Bid, a complete history of all citations
and/or violations, notices and dispositions thereof. The nonsubmission of any
such documentation shall be deemed to be an affirmation by the Bidder that
there are no citations or violations. Bidder shall notify the City immediately of
notice of any citation or violation which Bidder may receive after the Bid opening
date and during the time of performance of any contract awarded to it.
16. "Or Equal" Clause: Whenever a material, article or piece of equipment is
identified in the Contract Documents including plans and specifications by
reference to manufacturers' or vendors' names, trade names, catalog numbers,
or otherwise, City, through Consultant, will have made its best efforts to name at
least three (3) such references. Any such reference is intended merely to
establish a standard; and, unless it is followed by the words "no substitution is
permitted" because of form, fit, function and quality, any material, article, or
equipment of other manufacturers and vendors which will perform or serve the
requirements of the general design will be considered equally acceptable
provided the materials, article or equipment so proposed is, in the sole opinion of
Consultant, equal in substance, quality and function.
ANY REQUESTS FOR SUBSTITUTION MUST BE MADE TO THE CITY'S
PROCUREMENT DIRECTOR, WHO SHALL FORWARD SAME TO
CONSULTANT.
17. Protested Solicitation Award:
Bidders that are not selected may protest any recommendation for Contract
award in accordance with City of Miami Beach Ordinance No. 2002-3344, which
establishes procedures for resulting protested bids and proposed awards.
Protests not made timely pursuant to the requirements of Ordinance No.
2002-3344 shall be barred.
18. Financial Stability and Strength:
The bidder must be able to demonstrate a good record of performance and have
sufficient financial resources to ensure that they can satisfactorily provide the
goods and/or services required herein.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/1.3/07 18
Bidders shall submit financial statements for each of their last two complete fiscal
years within ten (10) calendar days, upon written request. Such statements
should include, as a minimum, balance sheets (statements of financial position)
and statements of profit and loss (statement of net income).. When the bid
submittal is from a Joint Venture, each bidder involved in the Joint Venture must
submit financial statements as indicated above.
Any bidder who, at the time of bid submission, is involved in an ongoing
bankruptcy as a debtor, or in a reorganization, liquidation, or dissolution
proceeding, or if a trustee or receiver has been appointed over all or a substantial
portion of the property of the bidder under federal bankruptcy law or any state
insolvency, may be declared non-responsive.
19. Equal Benefits Ordinance
Bidders are advised that this Bid and any contract awarded pursuant to this
procurement process shall be subject to the applicable provisions of Ordinance
No. 2005-3494, entitled "Requirement for City Contractors to Provide Equal
Benefits for Domestic Partners (the "Ordinance")." The Ordinance applies to all
employees of a Contractor who work within the City limits of the City of Miami
Beach, Florida; and the Contractor's employees located in the United States, but
outside of the City of Miami Beach limits, who are directly performing work on the
contract within the City of Miami Beach.
All bidders shall complete and return, with their bid, the "Declaration: Non-
discrimination in Contracts and Benefits" form contained herein. The City shall
not enter into any contract unless the bidder certifies that such firm does not
discriminate in the provision of Benefits between employees with Domestic
Partners and employees with spouses and/or between the Domestic Partners
and spouses of such employees. Contractors may also comply with the
Ordinance by providing an employee with the Cash Equivalent of such Benefit or
Benefits, if the City Manager or his designee determines that the successful
bidder Contractor shall complete and return the "Reasonable Measures
Application" contained herein, and the Cash Equivalent proposed.
It is important to note that bidders are considered in compliance if bidder
provides benefits neither to employees' spouses nor to employees' Domestic
Partners.
Following this page please find a Q & A of the major points of the proposed
Ordinance. Additionally, the following documents need to be returned to the City
with your bid:
• Declaration: Nondiscrimination in Contracts and Benefits Form
• Reasonable Measures Application Form
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 19
PROPOSED EQUAL BENEFITS ORDINANCE SUMMARY
The foregoing analysis provides a summary of the major points of the proposed
Ordinance:
1) What is the intent of the Ordinance?
The proposed Ordinance will require certain contractors doing business with the City of
Miami Beach, who are awarded a contract pursuant to competitive bids, to provide
"Equal Benefits" to their employees with Domestic Partners, as they provide to
employees with spouses.
2) How are "Equal Benefits" defined and what kind of "Benefits" does
the Ordinance cover?
"Equal Benefits" means that contractors doing business with the City who are covered
by the Ordinance shall be required to provide the same type of benefits that they offer to
employees and their spouses, to employees with Domestic Partners.
The type of "Benefits" defined by the Ordinance and which may be offered by a
contractor include: sick leave, bereavement leave, family medical leave, and health
benefits.
The "Benefits" defined in the Ordinance are the same type of benefits that the City
provides to Domestic Partners of City employees, pursuant to Section 62-128 of the City
Code].
Notwithstanding the definition of "Benefits" in the Ordinance, to comply with the
Ordinance a Contractor is not required to provide all the above-described benefits.
Contractors are only required to offer the same type of Benefits they offer to their
employees with spouses, to employees with Domestic Partners. Additionally, a
Contractor who offers no benefits to employees or their spouses, would not be required
to offer any benefits to employees with Domestic Partners (and would still be in
compliance with the Ordinance).)
3) Who is considered a "Domestic Partner" under the Ordinance?
A "Domestic Partner" shall mean any two (2) adults of the same or different sex who
have registered as domestic partners with a government body pursuant to state or local
law authorizing such registration, or with an internal registry maintained by the employer
of at least one of the domestic partners.
4) What type of Contracts and/or which Contractors are covered by
the Ordinance?
The Ordinance only applies to the following:
• Competitively bid City contracts (bids, RFP's, RFQ's, RFLI's, etc.).
• Contracts valued at over $100,000.
Contractors who maintain 51 or more full time employees on their payrolls during
20 or more calendar work weeks in either the current or the preceding calendar
year.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 20
• Contractors covered by the Ordinance are only required to comply as to
employees who: 1) either work within the City limits of the City of Miami Beach; or
2) the contractor's employees located in the United States, but outside of the City
limits, only if those employees are directly performing work on the City contract
(covered by the Ordinance).
5) In what cases does the Ordinance not apply?
The provisions of the Ordinance do not apply where:
• The City contract has been has been entered into prior to the effective date of
the Ordinance (including renewal terms contained in such contracts).
• The City contract is not competitively bid.
• The City contract is valued at less than $100,000.
• The contractor has less than 51 employees.
• The contractor does not provide Benefits either to employees' spouses or to
employees' Domestic Partners.
• The contractor is a religious organization, association, society or any non profit
charitable or educational institution or organization operated, supervised or
controlled by or in conjunction with a religious organization, association or
society.
• The contractor is another government entity.
The following City contracts are not covered by the Ordinance:
• Contracts for sale or lease of City property.
• Development Agreements.
• Contracts/grants for CDBG, HOME, SHIP, and Surtax funds administered by
the City's Office of Community Development
• Cultural Arts Council grants
• Contracts for professional A/E, landscape A/E, or survey and mapping
services procured pursuant to Chapter 287.055, Florida Statutes ("The
Consultants Competitive Negotiation Act".
• Contracts for the procurement of life, health, accident, hospitalization, legal
expense, annuity insurance, or any and all other kinds of insurance for the
officers and employees of the City and their dependents, from a group
insurance plan.
The Ordinance provides, upon written recommendation of the City Manager, that the
City Commission may, by 5/7ths vote, waive application of the Ordinance for the
following:
• Emergency contracts.
• Contracts where only one bid response is received.
• Contracts where more than one bid response is received, but none of the
bidders can comply with the requirements of the Ordinance.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/].3/07 21
The City's ability to apply the Ordinance may also be preempted in instances where the
Ordinance impacts health, retirement, or pension program which fall within the
jurisdiction of the Employee Retirement Income Security Act (FRIBA), and may under
certain circumstances be held invalid under Federal preemption.
6) How is the Ordinance enforced by the City?
• City contracts that are covered by the Ordinance shall notify potential
bidders/proposers of the Ordinance and its requirements in the issued bid
documents.
• At the time of entering into the contract with the City, the proposed City
contractor shall certify to the City that it intends to provide Equal Benefits,
along with the description of its employee benefits plan, which needs to be
delivered to the Procurement Director prior to entering into the contract.
• The City has the ongoing right to investigate/audit contracts for compliance
with the provisions of the Ordinance.
• The contractor is required to post notice to its employees at its place of
business that it provides Equal Benefits.
7) Is there another way for a Contractor who does not provide Equal Benefits to
comply with the Ordinance?
If a contractor covered by the Ordinance has made a reasonable yet unsuccessful effort
to provide Equal Benefits, it can still comply with the Ordinance by providing an
employee with the "Cash Equivalent" of the similar benefit(s) offered to the contractor's
employees and their spouses.
8) What are the penalties for non compliance?
Failure of a contractor to comply with the requirements of the Ordinance may
result in the following:
• Breach/default under the contract.
• Termination of the contract.
• Monies due under the contract may be retained by the City until
compliance is achieved.
• Debarment of contractors from City work, as prescribed by the City
Code.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/].3/07 22
,..
..
a
. -._
~ .. _
CITY OF MIAMI BEACH
DECLARATION: NONDISCRIMINATION IN CONTRACTS AND BENEFITS
Section 1. Vendor Inf[o'rmation
Name of Company: mac- ~c ~~;,,'z~t+tcf~c :~ Name of Company Contact Person: ~Yl N - i ~'. C' S r /1
r
Phone Number. ~~~'~~i~1H zcT ~~. Fax Number: ~O'S9y~r ~'~~`~`] E-mail: ~c~nC~T ~ ~e.~~~c~..4tt~.i 6or,. r r;~~~
Vendor Number (if known):
Federal ID or Social Security Number: ,5 `'~ "" I ~a"//"~~57 3
Approximate Number of Employees in the U.S.: "7 ! (If 50 Of IeSS, skip to last page (26),
date and sign)
Are any of your employees covered by a collective bargaining agreement or union trust fund? _Yes_No
Union name(s):
Section 2. Compliance Questions
Question 1. Nondiscrimination -Protected Classes
A. Does your company agree to not discriminate against your employees, applicants for
employment, employees of the City, or members of the public on the basis of the fact or
perception of a person's membership in the categories listed below? Please note: a "YES"
answer means your company agrees it will not discriminate; a "NO" answer means your
company refuses to agree that it will not discriminate. Please answer yes or no to each
category.
Race _Yes _ No Sex _Yes _ No
Color _Yes _ No Sexual orientation _Yes _ No
Creed _Yes _ No Gender identity (transgender status) _Yes _ No
Religion _Yes _ No i Domestic partner status _Yes _ No
National origin _Yes _ No r Marital status _Yes _ No
Ancestry _Yes _ No Disability _Yes _ No
Age _Yes _ No AIDS/HIV status _Yes _ No
Height _Yes _ No r Weight _Yes _ No
B. Does your company agree to insert a similar nondiscrimination provision in any
subcontract you enter into for the performance of a substantial portion of the contract you
have with the City? Please note: you must answer this question, even if you do nut intend
to enter into any subcontracts.
_ Yes _ No
BID NO: 28-06/07 CITY' OF MIAMI BEACH
DATE: 03/13/07 23
Question 2. Nondiscrimination -Equal Benefits for Employees with Spouses and Employees with Domestic
Partners
Questions 2A and 2B should be answered YES even if your employees must
pa some or all of the cost of spousal or domestic partner benefits_ _ __ _____
A. Does your company provide or offer access to any benefits to employees with
spouses or to spouses of employees?
_Yes_No
B. Does your company provide or offer access to any benefits to employees with
(same or opposite sex) domestic partners' or to domestic partners of
employees? _ Yes _No
'The term Domestic Partner shall mean any two (2) adults of the same or different
sex, who have registered as domestic partners with a government body pursuant to
state or local law authorizing such registration, or with an internal registry
maintained by the employer of at leasi one of the domestic partners. A Contractor
may institute an internal registry to allow for the provision of equal benefits to
employees with domestic partner who do not register their partneFships pursuant to
a govemmental body authorizing such registration, or who are located in a
jurisdiction where no such governmental domestic partnership exists. A Contractor
that institutes such registry shall not impose criteria for registration that are more
stringent than those required for domestic partnership registration by the City of
Miami Beach
If you answered "NO' to both Questions 2A and 28, go to Section 4 (at the bottom of
this page), complete and sign the form, filling in all items requested.
If You answered "YES" to either or both Questions 2A and 2B, please continue to
Question 2C below.
Question 2. (continued)
C. Please check all benefits that apply to your answers above and list in the "other" section
any additional benefits not already specified. Note: some benefits are provided to
employees because they have a spouse or domestic partner, such as bereavement leave;
other benefits are provided directly to the spouse or domestic partner, such as medical
insurance.
BENEFIT Yes for
Employees with
S ouses Yes for Employees
with Domestic
Partners No, this Benefit
is Not Offered Documentation of this
Benefit is Submitted
with this Form
Health ^ c ^ ^
Dental a c, ,., L:,
Vision n r.. ^ n
Retirement (Pension,
401 k ,etc. ,., ._ u o
Bereavement ^ o ^
Famil Leave ^ n c.
Parental Leave n c n n
Employee Assistance
Pro ram ^ c
_ ^
_ _ __
~ ^
___
Relocation 8 Travel ^ - ^ ^
Company Discount,
Facilities 8 Events n r_; ^ ^
Credit Union u ^ u
Child Care ,: ~ _
--- r~
_~_
_._ La
__
~__~
Other _
^ `_ L~ o
BID NO: 28-06/07 CITY OF NiIAM! BEACH
DATE: 03/13/07 24
Note: If you can not offer a benefit in a nondiscriminatory manner because of reasons
outside your control, (e. g., there are no insurance providers in your area willing to offer
domestic partner coverage) you may be eligible for Reasonable Measures compliance.
To comply on this basis, you must agree to pay a cash equivalent, submit a completed
Reasonable Measures Application with all necessary attachments, and have your
application approved by the City Manager, or his designee.
Section 3. Required Documentation
'fOU MUST SUBMIT SUPPORTING DOCUMENTATION to verify each benefit marked in Question 2C. Without
proper documentation, your company cannot be certified as complying with the City's Equal Benefits
Requirement for Domestic Partner Ordinance. For example, to document medical insurance submit a statement
from your insurance provider or a copy of the eligibility section of your plan document; to document leave
programs, submit a copy of your company's employee handbook. If documentation for a particular benefit does
not exist, attach an explanation.
Have you submitted supporting documentation for each benefit offered? Yes _ No
Section 4. Executing the Document
I declare under penalty of perjury under the laws of the State of Florida that the foregoing is true and
correct, and that I am authorized~to bind This entity contractually.
Executed this ~ day of 7f`~ I , in the year -- ~ ~ , at iGt~ I ~ cj[ ~' 1
~ City State
Signature
Name of Signatory (please print)
~S~rii, ~`c~mmer'ce fiir~~txu)
Mailing Address
City, State, Zip Code
Title
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 25
~ _, _ .
CITY OF MIAMI BEACH
REASONABLE MEASURES APPLICATION
Declaration: Nondiscrimination in Contracts and Benefits
Submit this form and supporting documentation to the City's Procurement Division ONLY IF
you:
a. Have taken all reasonable measures to end discrimination in benefits; and
b. Are unable to do so; and
c. Intend to offer a cash equivalent to employees for whom equal benefits are not available.
You must submit the following information with this form:
1. The names, contact persons and telephone numbers of benefits providers contacted for the
purpose of acquiring nondiscriminatory benefits;
2. The dates on which such benefits providers were contacted;
3. Copies of any written response(s) you received from such benefits. providers, and if
written responses are unavailable, summaries of oral responses; and
4. Any other information you feel is relevant to documenting your inability to end discrimination
in benefits, including, but not limited to, reference to federal or state laws which preclude the
ending of discrimination in benefits.
I declare (or certify) under penalty of perjury under the laws of the State of Florida that the
foregoing is true and correct, and that I am authorized to bind this entity
contractually.
-~
ff ;,
,.. _.~`~If l ~`j,>j,'14~'0-'t iL`;l L~~`F~i.~~~1 ~+.~l1 1i D~-i~ t.~...1~~^r~rY~',`l. l` ~0.~ f.. ln.'hy -
N~ Company (please prin) Marling Address of Company
%~
Signa ure City, State, Zip
~..t.~ + ---~ -~ -
f`.ar~~ ;'fii SG : l `-'l'S c.jy~ 7''I ~~.,-,i
Name of Signatory (please print) Telephone Number
• 5 f
Title Date
BID Nn: 28--06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 ~6
Definition of Terms
A. REASONABLE MEASURES
The City of Miami Beach will determine whether a City Contractor has taken all reasonable
measures provided by the City Contractor that demonstrates that i# is not possible for the City
Contractor to end. discrimination in benefits. A determination that it is not possible far the City
Contractor to end discrimination in benefits shall be based upon a consideration of such factors as;
{1) The number of benefi#s providers identified and contacted, in writing, by the City Contractor,
and written documentation from these providers that they will not provide equal benefits;
{2) The existence of benefits providers willing to offer equal benefits to the City Contractor; and
{3) The existence of federal or state laws which preclude the City Contractor from ending
discrimination in benefits.
B. CASH EQUIVALENT
"Cash Equivalent means the amount of money paid to an employee with a Domestic Partner {or
spouse, if applicable) in lieu of providing Benefits to the employees' Domes#ic partner {or spouse, if
applicable). The Cash Equivalent is equal to the employer's direct expense of providing Benefits to
an employee for his or her spouse.
Cash Equivalent. The cash equivalent of the following benefits apply:
a. For bereavement leave, cash payment for the number of days that would be allowed as paid
ti me off for dea#h of a spouse, Cash payment would be in the form of wages of the domestic partner
employee for the number of days allowed.
b. For health benef~s, the cost to the Contractor of the Contractor's share of the single monthly
premiums that are being paid for the domestic partner employ®e, to be paid on a regular basis while
the domestic partner employee maintains the such insurance in force for himself or herself.
c. Far family medical leave, cash payments for the number of days that would be allowed as time
off for an employee to care for a spouse that has a serious heath condition. Cash payment would
be in the form of wages of the domestic partner employee for the number of days allowed.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 27
00305. TECHNICAL REVIEW PANEL SELECTION CRITERIA /
SELECTION PROCESS
The Evaluation process to be used by the City for this bid will be one of "Best Value
Procurement", meaning that the City will, in addition to price, consider past performance
on previous contracts, Risk Assessment for this ITB, Qualifications of Personnel
proposed, and presentation and interview of Contractor's personnel. (See Section
00315)
The procedure to be used for bid evaluation and selection is as follows:
• Invitation to Bid issued.
• Pre-Bid Meeting.
• Receipt of bids.
• Opening and listing (except pricing) of all bids received.
• Review all bids for responsiveness.
• Distribution of all responsive bids to the Technical Review Panel.
The TECHNICAL REVIEW PANEL will rank all responsive bidders and will provide their
recommended ranking to the City Manager. There will be three (3) phases to the
evaluation process and they are as follows:
PHASEI
1) Qualifications and Experience of Contractor's Team (20 Points)
2) Risk Assessments (10 points). A Preliminary Project Schedule should be
attached to the RAP.
3) Past performance based on number and quality of the Performance Evaluation
Surveys (10 points).
PHASE II
3) Presentation and Interview of Key personnel (30 points).
PHASE III
4) Bid Price (30 points).
Scoring procedure:
When the TECHNICAL REVIEW PANEL convenes they will provide their scores for
Phase I. At the Panel's discretion, taking into consideration the number of responses,
the Panel may decide to short list bidders for continuation of Phase II through III. Upon
completion of scores for Phase I, scores shall be carried over to Phase II. Upon
completing the Presentation and Interview session with each bidder, the score for
Phase II will be carried over to the Final Phase; Phase III, Price. Phase III shall be
evaluated and scored at the end of the Evaluation process. The Bid Price will not be
opened until the TECHNICAL REVIEW PANEL has provided their scores for Phases I
and II. Upon evaluation and ranking of Phase III, the TECHNICAL REVIEW PANEL
shall add all three Phase scores and shall arrive at a final score at which time; they will
provide their ranking of bids and their recommendation to the City Manager which in
turn he will provide his recommendation to the City Commission.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 28
00310. BID SUBMISSION REQUIREMENTS
The following information should be submitted with you bid response
1.01 CONTENTS OF QUALIFICATION STATEMENT
Bid packages must contain the following documents, each fully completed, and
signed as required. Bid .packages which do not include all required
documentation, or are not submitted in the required format, or do not have the
appropriate signatures on each document, may be deemed in the City's sole
discretion to be non-responsive. The City reserves the right to request any
documentation omitted, with exception of the 5% Bid bond and the Bid Price form
in a sealed envelope, bidder must submit the documentation within three (3)
calendar days upon request from the City, or the bid shall be deemed non-
responsive. Non-responsive bid packages will receive no further consideration.
A. IDENTIFICATION PAGE AND TABLE OF CONTENTS
Bidder shall provide an Identification Page including the following information:
^ Name of Bidder. (Note: if co venture, specify)
^ Address of submitting Bidder. (Note: if co venture, specify)
^ E-mail address for the appropriate contact person at the submitting
company.
^ Phone number and facsimile number of submitting Bidder.
^ Federal Tax Identification Number for submitting Bidder.
^ Declaration regarding company organization, whether as Corporation,
Partnership, or other. (Note: if co venture, specify)
^ Signature of an officer or other individual of the submitting Bidder who has
the authority to bind said Bidder.
^ Printed name of the authorized signing officer or other individual.
^ Title of the authorized signing officer.
^ Date of signature.
^ Table of Contents.
B. QUALIFICATION AND EXPERIENCE OF THE CONTRACTOR'S TEAM
It is a requirement of the bid that the Bidder, staff the project with competent
individuals, and qualified supervisory personnel. To that end, the Bidder shall
provide:
Bidder (Business Entity) shall demonstrate the Contractor Team's (i.e.,
General Contractor, sub-contractors, and key personnel) ability to execute the
type of work described within the Contract Documents of this Invitation to Bid
(ITB). The Contract Documents place emphasis on executing a scope of work
consisting of, but not limited to the following underground utilities: Storm
drainage systems including class 5 drainage wells; Sanitary sewer systems;
Potable water systems; High voltage electrical distribution; Telephone and
data distribution; reinforced concrete load distribution slabs.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/1.3/07 29
It is recommended that the bidder provide representative projects as outlined
above to include the following information and components:
• Bidder's role
• Project name
• Project location
• Brief description of work performed
• Names, addresses, telephone number, fax number, and contact name
for the following:
• Owner or Agency
• Name of General Contractor's project manager and field superintendent
• Awarded contract amount and final contract amount
• Project Status (Projects may include finally completed projects,
substantially completed projects as well as projects in-progress)
• A checklist or description of the following types of construction
encountered on the project, if applicable:
u Storm drainage systems
Class 5 drainage wells
Sanitary sewer systems
~~ Potable water systems
~~ High voltage electrical distribution
u Telephone and data distribution
~ Reinforced concrete load distribution slabs
^ Other: List as may apply
An organizational chart listing the proposed key personnel, their qualifications
and their roles in the project, resumes which shall include educational
background, work experience, employment history, and any other pertinent
information. Where applicable, Bidder team members shall also submit
current and valid certifications and/or licenses for their individual scope of
supervision. At a minimum, the bidder shall include the following proposed
project team members:
^ Construction Project Manager
^ Construction Superintendent
^ Site Foreman
A staffing plan that clearly illustrates the key elements of the proposed
organizational structure. The staffing plan should indicate the availability of
the personnel proposed to work on the Project. The staffing plan should also
indicate the name of the individual who will serve as the primary contact with
City. Bidder shall clearly detail the role of all Sub-contractors proposed for
the Project.
C. PAST PERFORMANCE
Please provide your client with the Performance Evaluation Letter and Survey
attached herein on pages 37 and 38, and request that your client submit the
completed survey to Roman Martinez, Sr. Procurement Specialist at the
following a-mail romanmartinezCa~miamibeachfl.gov and to
johnellis@miamibeachfl.gov. Please understand that we will not accent
Client Survevs beinct sent to our office from the office of the bidder
Surveys must be sent to Procurement from your client's office(s). Contractors
are responsible for making sure their clients return the Performance
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 30
Evaluation Surveys to the City. The City reserves the right to verify and
confirm any information submitted in this process. Such verification may
include, but is not limited to, speaking with current and former clients, review
of relevant client documentation, site-visitation, and other independent
confirmation of data.
D. RISK ASSESSMENT AND PROJECT SCHEDULE
All bidders must submit one (1) original and ten (10) copies of the Risk-
Assessment Plan. The Risk-Assessment Plan should not be longer than
four paces front side of paste only. The RAP should not contain anv
reference to the bidders name within the document. Please exclude anv
letterhead or logos, anything that can identify your company's name.
(Note: The City reserves the right to request, from the bidder, to re-submit the
RAP in cases where the RAP has exceeded the four pages of length or any
RAP that has been identified with the bidder's name or logo. Consultants
must submit the documentation within three (3) calendar days upon request
from the City, or the proposal shall be deemed non-responsive.) The RAP
should be submitted in a sealed labeled envelope and included within the ITB
submission. The Risk-Assessment Plan should address the following items in
a clear and generic language: (Please refer to Section 00315. BEST VALUE
PROCUREMENT ATTACHMENTS AND FORMS, Attachment No. 3 and 4
found on pages 39-43).
The RAP should address the following items in a clear and generic language:
(1) What risks the project has. (Areas that may cause the Contractor not to
finish on time, not finish within budget, cause any change orders, or be a
source of dissatisfaction with the owner).
(2) Explanation of how the risks will be avoided/minimize.
(3) Propose any options that could add value to this project.
(4) Explain the benefits of the Risk Assessment Plan. Address the quality and
performance differences in terms of risk minimization that the City can
understand and what benefits the option will provide to the user. Do not
provide brochures or marketing pieces.
5) Please make sure you attach a preliminary Project Schedule behind the
Risk Assessment Plan
E. BID PRICE
Bidders are required to submit their bid price lump sum using the form found
on page 49 and attach also the Unit Price Form found on page 50 herein.
Bidders are to submit this form in a sealed envelope but separate from the
sealed Risk Assessment envelope. Labeling the sealed envelope with your
company's name is permitted. The Bid Price (Phase III), shall be evaluated
and ranked at the end of the Technical Review Panel Meeting and the score
added to Phases I and II to arrive at a final score for each bidder.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 31
00315. BEST VALUE PROCUREMENT ATTACHMENTS AND FORMS
ATTACHMENT 1
Detailed Instructions on How to Prepare a Reference List and How to
Prepare and Send Performance Surveys
Overview
The objective of this process is to identify the past performance of a contractor and key
components of their team. This is accomplished by sending survey forms to past customers.
The customers will return the forms directly to the City, and the ratings will be averaged together
to obtain a contractor's past performance rating. The figure below illustrates the survey process.
Vendor or Individual
Send/Fax Call to Prepare & Email
Surveys to Confirm Reference List
past clients
'`~ ~ CLIENT
~> ;t.
Faxes back to 1'he City
the City ~ Compiles
Information
tii- s`\
Past Customers
Figure 1: Survey Process
A. Creating and Submitting a Reference List
1. All key components must create a list of past users that will evaluate their past performance.
This will be referred to as a "Reference List". The Reference List Excel file can be
downloaded from BidNet under ITB-28-06/07 or can be sent to you via E-mail, please send
an E-mail to romanmartinezCa~mimaibeachfl.gov requesting the file.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 32
2. The key components may be different for each project. If you are proposing on a specific
project, please make sure to find out what the critical components are for that project. The
following are the key components to be used for this bid:
Key Component Minimum Number of
Surve s allowed Maximum Number of
Surve s allowed
The Contractor 1 25
The Construction Pro'ect Mana er 1 10
The Construction Su erintendent 1 10
3. The Contractor is responsible for selecting their team and for the performance of their team.
We recommend that the Contractor use high performing individuals (i.e. project manager,
and any other individuals required on a particular project).
4. The maximum number of past projects that will be given credit, is 25 (twenty-five) for each
Contractor, and 10 (ten) for each individual (PM, etc.). The minimum number of past
projects is 1 (one) for each key component. Credit will be given to vendors with more high
performing surveys.
5. The reference list should include the firms/individuals "best" projects. Credit will be given to
Contractor /individuals with more high performing surveys.
6. The Reference List must include the following (All fields are required! If you do not submit
all the information required, there will be no credit given for the reference):
CODE A unique (different number assi ned to each pro'ect
FIRST NAME First name of the person who will answer customer satisfaction questions.
LAST NAME Last name of the person who will answer customer satisfaction questions.
PHONE NUMBER Current phone number for the reference (includin area code).
FAX NUMBER Current fax number for the reference (includin area code).
CLIENT NAME Name of the company or institution that the work was performed for (i.e.
Cactus School District, Rock Industries, Cit of Austin .
PROJECT NAME Name of the project (Bird High School A-Wing, Warehouse B, etc.).
DATE COMPLETED
[MM/DD/YYYYj Date when the project was completed. (i.e. 5/31/1995)
COST OF PROJECT Awarded cost of pro'ect ($50,000)
7. The data in the reference list must be submitted must be emailed to Roman Martinez at
romanmartinezCa~miamibeachfl.aov . (The format of the file is shown in Figure 2).
8. The Contractor is responsible for verifying that their (and their key components) information
is accurate prior to bid submission.
9. The reference list must contain different projects You cannot have multiple people
evaluating the same job.. However, one person may evaluate several different jobs.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 33
A
nnf~~y
4VVt: 8
jrp~y{y~
T$f Mk i~ C
p ~)
Y ~.f.H~~ t~RF'1/~I~F L2 ~:
~ i'll~I~ ~
~c~ee E
.. T~~fl1l ~
~y Cn F
>~i~f~~ ~1i/~~ -'G
b
l~R~~ t~ '~ M
a
~.~~~~ I
'~
ice,: ~ f 1
r.., ~~,
r!, ..
2 1 K le Smith 458-963-8562 458-963-8563 Cit of Mesa Mesa Park 5/15/2000 $36,589
3 2 Geor a Johnson 549-765-9654 549-785-9655 Cit. of Mesa Police Buildin 3 618!1999 $452 389
4 3 Phil McGill 458-965-7852 458-965-7853 Cit of Mesa Cafeteria #1 7x6/1980 $12,648
5 4 Bill Robinson 136-621-1264 136-621-1265 ABB Warehouse Warehouse renovation 6/2/1995 $154 893
6 5 Matt Carni an 658-965-8965 658-965-8966 ADOT Sta le Road Over as 1/51~CJ2 $15,648
7 6 Keith Jones 458-965-8523 458-965-8524 Cit of Gilbert Road Renovation 5/402003 $4 865,923
S 7 Gilbert Gre 486-965-8523 dB6-965-8523 Cit of Phoenix Street Li ht Installation 7/2/1990 $456,876
9 8 John Grecko 486-965-8563 486-965-8563 ACG Buildin s Buildin. 456 renovation 8/2/2003 $159,764 v
H ~ - H Profile Referenc e List ~ t > ~ ,
Figure 2: Example of Reference List
10. The past projects (on the reference list file) do not have to be similar to the type of project
being bid.
11. The past projects must be completed past projects (no on-going or substantially complete
projects).
12. The past client/owner must evaluate and complete the survey.
13. All key components must submit their reference list in separate excel files. There must be a
separate excel file for each company and individual participating in the process. Name the
file by the company name or the individual name. Figure 3 shows a sample of the excel files
that must be emailed to the client.
game
ABC Contracting -Reference List.xls
Email Reference
Mark McGraw (Prajeck Manager) -Reference Lisk. xls ® lists to the client.
Pam Hamilkon (Sike Super) -ReFerence List.xls
Sparkfleckrical Contrackors -Reference List.xls
Bob and Sans Mechanical Cantrackars -ReFerence Lisk.xls
Figure 3: Submit separate excel files for each component
14. Each key component should inform their past clients about the survey and the deadline for
submission of the information. The City may contact the references for additional
information. If the reference cannot be contacted after several attempts, there will be no
credit given for that reference.
15. Each Excel file will have two tabs (see Figure 4 below). One tab contains the reference list
information (discussed above), and the second tab contains the company or individual
profile. The profile tab contains information about the key component (Contractor or
individual). Fill out the company information if the excel file is for the Contractor or
Individual. Fill out the individual information if the excel file is for an individual. DO NOT fill
out both sections in one excel file. (Remember: each component will have their own excel
file).
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 34
.=G ~ .< ..
K n ~ u e r u n i ~ tc c
Please Fill out ordg one of the forms below. N this reference gst is for a compang,please use the Company form on top. If this
reference Ast is for and individual, please pu their information in the second form below. DD NDT f~ out both. Remember there
1 must be a separate ercel file for each individual partkpatitg in the process.
2
3 Gamorrw
Compaq Name:
Type:
Point of Garrott:
Phase Nmnber
Fas Number:
Email
e1
Traffic Engneering F'rm, etcJ
Indiuidral Namr.
T~pr.
Compaq Name_
Phone Number:
Fas Number
aR
Ind'tvidufll
(Project Manager, etc.)
Figure 4: Example of the Profile tab.
This tab contains information about the key component (whether it is an individual or firm)
B. Preparing the Surveys
1. Each key component is responsible for sending out a survey questionnaire to each of their
past clients. The survey questionnaire is provided in this document.
2. Each key component should enter the Survey ID (Code), past clients contact information,
and project information on each survey form for each reference. The team member should
also enter the name of the firm and/or individual being surveyed.
3. All the information on the survey form must match the reference information in the excel file
(see Figure 5).
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 35
~. i ~ 1- C G E F H I
~.
1 k„ ~~
r• r
1tA~'
~_ . 11~ ~ FN>C
~ ~11tNi~I1 Ck.lEi(rNAlMlI~ ~
~rpFlQ#'J.; „ ~ , ;.~ ~~
~,~~
__._
2 1 K le
Smith
458-963-85fi2
456 Slb.i-85ti3
Grt of Mesa
Mesa Park
5/15!2000
536
3 ' 549-765-9654 549-785-9655 Cit of Mesa Police Buildin 3 6/8/1999 5452 389
Phil 58-965-7852 458-965-7853 Cit of Mesa Cafeteria #1 7/8/1980 512648
5 Jae McReaken 136-621-1264 136.621-1265 ABB Warehouse Warehouse renovation 6/2/1995 5154 893
6 Bob Hard 658-965-8965 658-965-8966 ADOT Sta le Road Ove as 115!2002 S15 648
7 ' 6 Mitchell Adams 458-965-8523 458-965-8524 Cit of Gilbert Road Renovation 514!2003 54,865,923
1#: 7 Bill. Robinson 486-965-8523 486-965-8523 Cit of Phoenix Street Li ht Installation 7Q/1990 5456 876
9 B oho Grecko 486-965.8563 486-965-8563 ACG Buildin s Buildin 456 renovation BQ(1003 $159 764
N ~ - -i . ~ Pro ferenc e Ltst ~ la y ,~.
Survey Questionnaire
! Survey ID 3
o: - - Phil McGill
(Name of person completing survey)
__....-...... ~ ._. _._...- -.__..__.. _...._...__-__-_--.__._.....--....._._--_-- - - ...__..-_...._-.._--.-........-_._-m....._. -..-..._.-_-..-.-_......._ _. _ .. s
Phone: 458565-7852 Fax: 1 A58565-7853 °_..____..._-._._. -_..-._.__~
_~_...._..._._._._a ........................................................................................................................................... ___ _ _ __..__ ..............................................................................................:...............,
Sub'ect: Past Performance Surve of: ABC
(Name of Company)
Mark McGraw PM ,Pam Hamilton SS
Name of InatYidual5
A Client is implementing a process that collects past performance information on firms and their key
personnel. The information will be used to assist the client in the selection of firms to perform various
projects. The firmlindividual listed above has listed you as a client for which they have previously
performed work on. We would appreciate your taking the time to complete this survey.
Rate each of the criteria on a scale of 7 to 90, with 90 representing that you were very satisfied (and
would hire the firrrdindividual again) and 'J representing that you were very unsatisfied (and would never
hire the firmlindividual again). Please rate each of the criteria to the best of your knowledge. !f you do
not have sufficient knowledge of past performance in a particular area, leave it 61ank.
Client Name: Ci of Mesa
Project Name: Cafeteria #1
Project Completion Date:.; 16f198d
1 Ability to manage the project cost (minimize change orders) (1-10)
Figure 5: Example of Survey Form. The information ~t match the excel file.
To save work in the future, list all key individuals on the survey that participated on the project.
4. If a reference will be evaluating several team members (such as the PM), please list all of
the members on the survey form to get credit for all the areas (as shown in Figure 5).
5. Do not list more than one individual for the same position (i.e. if Joe Smith was a PM on the
project, you cannot list another individual as a PM on that same project).
6. Each key component is responsible for making sure that their past clients receive the
survey, complete the survey, and return the survey back to the City. The survey must be
sent directly from the past client to the City or your survey will not receive credit. Be sure to
indicate to your clients the due date when the survey should be faxed in to the City.
7. The City may contact the references for additional information or to clarify survey data. If the
reference cannot be contacted, there will be no credit given for that reference.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 36
ATTACHMENT 2
~~I
City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachFl.gov
PROCUREMENT DIVISION
Tel: 305.673.7490 ,Fax: 305.673.7851
March 14, 2007
To:
(Client's Name)
Individual Providing the Survey Response:
Phone:
Fax:
E-mail:
Subject: Performance Evaluation of
(Consultant firm and/or Project Manager/Cost Estimator)
Number of pages including cover: 2
To Whom It May Concern:
The City of Miami Beach has implemented a process that collects past performance
information on various Contractors that have the qualifications and experience in
providing construction of underground utilities.
The company listed in the subject line has chosen to participate in this program. They
have listed you as a past client that they have done work for. Both the company and
City of Miami Beach would greatly appreciate you taking a few minutes out of your busy
day to complete the accompanying questionnaire.
Please review all items in the following attachment and answer the questions to the best
of your knowledge. If you have difficulty or cannot decipher the question's meaning,
please provide your best judgment as to it's understanding and score accordingly.
Please return this Questionnaire to Roman Martinez by April 16 2007 or earlier by
fax: 305.673.7851; or a-mail romanmartinezCa~miamibeachfl.gov
Please provide one Survey for the Contractor and one Survey for the Construction
Project Manager or Construction Superintendent who directly worked on your project.
Thank you for your time and effort.
Gus Lopez, CPPO
Procurement Director
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 37
m MIAMIBEACH
City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov
PROCUREMENT DIVISION
Tel: 305.673.7490 ,Fax: 305.673.7851
PERFORMANCE EVALUATION SURVEY
Project Name:
^ Contractor (Bidder)
(Check one)
^ Construction Project Manager and/or Construction Superintendent (Individual)
Name of Above
Phone or a-mail of above Consultant or Individual:
Please evaluate the performance of the Contractor's firm and/or Construction Project Manager and/or
Construction Superintendent (10 means you are very satisfied and have no questions about hiring them
again, 5 is if you don't know and 1 is if you would never hire them again because of very poor
performance).
NO CRITERIA UNIT
1 Ability to manage the project cost (minimize change orders) (1-10)
2 Ability to maintain project schedule (complete on-time or early) (1-10)
3 Quality of workmanship (1-10)
4 Professionalism and ability to manage (includes responses and
rom t a ment to su tiers and subcontractors (1-10)
5 Close out process (no punch list upon turnover, warranties, as-
builts, operating manuals, tax clearance, etc. submitted
rom tl
(1-10)
6 Communication, ex lanation of risk, and documentation 1-10
~ Ability to follow the users rules, regulations, and requirements
housekee in , safet ,etc... (1-10)
$ Overall customer satisfaction and hiring again based on
erformance comfort level in hirin contractor a ain (1-10)
Overall Comments:
Agency or Contact Reference Business Name:
Contact Name:
Contact Phone and a-mail
Date of Services:
Dollar Amount for Services:
PLEASE E-MAIL THIS QUESTIONNAIRE TO
romanmartinezt'a~miamibeachfl.aov and johnellis@miamibeachfl.gov
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 38
ATTACHMENT 3
Risk Assessment Plan Guide
Introduction
The purpose of the Risk Assessment Plan (RAP) is to capture the contractor's ability to
preplan (identify the risks on a future project in terms of cost ($), time, and client
expectation of quality and performance). The RAP is used to:
1. Assist the client in prioritizing firms based on their ability to understand the risk of a
project.
2. Provide high performing vendors the opportunity to differentiate themselves due to
their experience and expertise.
3. Giving the competitive edge to experienced companies who have done the type of
work before, who can see the job from beginning to end, and who know how to
minimize the risk.
4. Provide a mechanism for the high performers to regulate the low performers by
ensuring that if they are not selected, the selected company will minimize the risk
and provide the client with a comparable performance.
The RAP will become part of the contract.
RAP Plan Format
The format for the RAP is attached. The RAP should clearly address the following
items in anon-technical manner:
1. List and prioritize major risk items or decisions to be made that are unique to this
project. This includes items that may cause the project to not be completed on time,
not finished within budget, generate any change orders, or may be a source of
dissatisfaction for the City. Attach a cost ($), time extension, or quality differential for
every risk.
2. Explain how the Contractor will avoid /minimize the risk. If the contractor has a
unique method to minimize the risk, it should be explained in non-technical terms.
3. Propose any options that could increase the value (expectation or quality) of their
work. List any value or differential that the contractor is bringing to the project.
No names!!! - In order to minimize any bias by the Technical Review Panel, the RAP
must not contain ANY names (such as contractor, manufacturer, or designer names,
personnel names, project names, product names, or company letterhead). The RAP
should not contain any marketing information.
Length -The City's goal is to make the selection process as efficient as possible.
Efficiency is to minimize the effort of all participants, especially those who will not get
the project. Therefore, the RAP should be a brief, well organized and concise. The RAP
must not exceed 2 pages.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 39
Font size -The font should be no smaller than 12 point.
Organization -Outline format. The attached format is only a sample.
Impact of Risks
Risks are any items that you should be concerned with throughout the entire project.
They are the most critical items that can impact the cost, time, or quality expectation of
the client. The risks should be prioritized, or listed in order by the greatest risks at the
top to the lowest risk in descending order. Each risk should have a cost and/or time
concern. If the risk has cost implications, the actual estimated cost should be listed. If it
has time concerns, the number of days should be listed.
Rating of Risk Assessment Plans
The RAP will be rated by the Technical Review Panel assigned to this project.
Rating criteria will be:
1. The understanding and minimization of risks.
2. Contractor's differentiation of their value.
3. Schedule.
Checklist for Risk Assessment Plan
1. Are all names removed from the RAP: personal, project, or company names?
2. Does every risk have a cost or time attached to it?
3. Are risks listed, high impact risks? (Do not list risks that you can easily handle
unless you perceive others are not doing it)
4. Does the RAP include all service, quality control processes; documentation that you
do that your competition does not.
5. Are you including Public Relation risks such as interfacing with project managers,
users of the facility, or audit/inspection personnel?
6. Do you have a simple schedule with major milestones?
7. Do you understand that anything you list becomes a part of your contract?
8. Does your RAP plan differentiate you? By how much?
9. Can your RAP plan make anon-technical person comfortable with hiring you?
10. Did you number the pages of the risk assessment plan?
11. Did you make one original and ten (10)copies of your RAP and enclosed them in a
sealed blanked envelope?
If all items are checked, your risk assessment plan is ready to submit.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 40
ATTACHMENT 4
Risk Assessment Plan Format
Please prioritize the risks (list the greatest risks first). Indicate the potential impact to
project cost (in terms of $), and/or schedule (in terms of calendar Days). You may
add/delete the risk tables below as necessary.
Maior Risk Items
Risk 1:
Impact: Schedule
ays)
.......................... .....
Solution:
Risk 2:
Impact:
Solution:
Risk 3:
Impact:
Solution:
Risk 4:
Impact:
Solution:
Risk 5:
Impact:
Solution:
Risk 6:
Impact:
Solution:
Risk 7:
Impact:
Solution:
Risk 8:
Impact:
Solution:
Cost ($) Schedule
_ _._ . _ ........____ ..... .....:. ............_..... _ _ . _ (Days)
Cost ($) Schedule
_ _ .............. _.___............._........__........._ _.... _..... _ (Days)
Cost ($) Schedule
--_.____________..._....~.__.______..__.----.._---_.... (Days)
Cost ($) Schedule
_ _ _..__ _...._. _ (Days)
Cost ($) Schedule
. ______.__._....-_-._ _....___...___._ (Days)
Cost ($)
Cost ($)
Schedule
(Days)
Schedule
(Days)
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 41
Risk 9: ___ _
Impact: Cost ($) Schedule
-_ __ _ __. (Days) _.
__
Solution:
Risk 10:
_ ...............
Impact: Cost ($) Schedule
__ ___ _. (Days)
Solution:
Value Added Oations or Differentials (w_hat you will do that the others do not
Vendors should identify any value added options or differentials that they are proposing,
and include a short description of how it adds value to the project. Identify if the items
will increase or decrease project schedule, cost, or expectation. You may add/delete
the value tables below as necessary.
Item 1:
Impact: Cost ($) Schedule
(Days)
Item 2:
Impact: Cost ($)
Item 3:
Schedule
(Days)
Impact: Cost ($)
Item 4:
Impact: Cost ($)
Schedule
(Days)
Schedule
(Days)
Attached behind this page please include a copy of your company's Project Schedule.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 42
ATTACHMENT 5
Interview of Key Personnel
Introduction
The purpose of the interview is to rate the following of key individuals in their respective
areas:
1. How well they see the project, from beginning to end.
2. Can they pick out and prioritize the critical points (risk) in terms of time and cost, and
have they preplanned for them.
3. Can they continuously improve.
4. Can they measure their own performance.
5. Can they minimize change orders, additional charges, and customer dissatisfaction?
Format
The key personnel shall be evaluated by the Technical Review Panel during its
meeting(s), and should be prepared to attend if invited to provide a presentation. The
interview will cover the above points. They will be questioned by the Technical Review
Panel and other individuals who may include the procurement staff and personnel from
several City user Departments such as CIP, Public Works and Parks and Recreation.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 43
00400. BID/TENDER FORM:
J ~i I ~ ~ ~ ~ ~- )
Submitted: '- P ~ ~ .. ~ 1
Date
City of Miami Beach, Florida
1700 Convention Center Drive
Miami Beach, Florida 33139
The undersigned, as Bidder, hereby declares that the only persons interested in this bid
as principal are named herein and that no person other than herein mentioned has any
interest in this bid or in the Contract to be entered into; that this bid is made without
connection with any other person, firm, or parties making a bid; and that it is, in all
respects, made fairly and in good faith without collusion or fraud.
The Bidder further declares that it has examined the site of the Work and informed itself
fully of all conditions pertaining to the place where the Work is to be done; that it has
examined the Contract Documents and all addenda thereto furnished before the
opening of the bids, as acknowledged below; and that it has satisfied itself about the
Work to be performed; and that it has submitted the required Bid Guaranty; and all other
required information with the bid; and that this bid is submitted voluntarily and willingly.
The Bidder agrees, if this bid is accepted, to contract with the City, a political subdivision
of the State of Florida, pursuant to the terms and conditions of the Contract Documents
and to furnish all necessary materials, equipment, machinery, tools, apparatus, means
of transportation, and all labor necessary to construct and complete within the time
limits specified the- Work covered by the Contract Documents for the Project entitled:
MULTIPURPOSE MUNICIPAL PARKING FACILITY
BID PACKAGE 01-UNDERGROUND UTILITIES
The Bidder also agrees to furnish the required Performance Bond and Payment Bond of
' , ' , eacri for not less than the total bid
price plus alternates, if any, and to furnish the required Certificate(s) of Insurance.
The undersigned further agrees that the bid guaranty accompanying the bid shall be
forfeited if Bidder fails to execute said Contract, or fails to furnish the required
Performance Bond and Payment Bond or fails to fumish the required Certificate(s) of
Insurance within fifteen (15) calendar days after being notified of the award of the
Contract.
In the event of arithmetical errors, the Bidder agrees that these errors are errors which
may be corrected by the City. In the everit of a discrepancy between the price bid in
figures and the price bid in words, the price in words shall govern. Bidder agrees that
any unit price listed in the bid is to be multiplied by the stated quantity requirements in
order to arrive at the total.
Blll NO: 28-06/U7 CIT~r' OF' 1~T1AA'lI BEACH
DATE: 03i 13/07 44
Acknowledgment is hereby made of the following addenda (identified by number)
received since issuance of the Contract Documents:
Attached is a Bid Bond [ ],
,
Aln $ nL of --- fvrr
iiY°~ar r-tit _ _ 1'lnll.+re•
i~ }Giro. the amount of $.....,......00 equating 5% of the Bid Price.
The Bidder shall acknowledge this bid by signing and completing the spaces provided
below.
~~ ~
Name of Bidder: __~~ ~ C: ~ ~' ~ ~ ~ ~ ~ ~~ c 1 t ~ : , ~. _ c' i~' ~=~~-~ ti~ca -~ „y E~
City/State/Zip:
~'~~ l~,C;vt"~G~i-
~~.~
Telephone No.: > ~~ } - ~ -
Social Security
No. or Federal
Dun and
Bradstreet No.: ~` ~~ ~- ~. %~ ~ "- ~ ~~ ~
(if applicable)
If a partnership, names and addresses of partners:
BID NO: 28-06/U7 CITY OF MIAMI BEACH
DA7 E: U3/13/U7 45
(Sign below if not incorporated)
WITNESSES:
(Type or Print Name of Bidder)
(Type or Print Name Signed Above)
(Sign below if incorporated)
A~TTE~T: ~ ____ ~
.~ ~ a
' ~ Secretary
(CJRPQRATE SEAL)
rri
(Type or Print ame of Corporation)
~ 4 ~
(Signature)
~ _
c_ (~ ~ ~C' ~ ~~'(~ i v ;~
~ ~.
ature and Title)
.-
j ~
~ l . ~ ..
(Type or Print Name Signed Above)
Incorporated under the laws of the State of: i~-~ IC_:~i ~ } ~' ~=~
BID NU: 28-06/07
DATE: 03/13/07
CITY OF' MIAMI BEACII
4G
00405. CITY OF MIAMI BEACH LICENSES PERMITS AND FEES:
Pursuant to the Public Bid Disclosure Act, each license, permit or fee a Contractor will
have to pay the City before or during construction or the percentage method or unit
method of all licenses, permits and fees REQUIRED BY THE CITY AND PAYABLE TO
THE CITY by virtue of this construction as part of the Contract is as follows:
The prospective bidder (General Contractor) must have a valid State of Florida
General Contractor's License.
LICENSES, PERMITS AND FEES WHICH MAY BE REQUIRED BY MIAMI-DADE
COUNTY THE STATE OF FLORIDA, OR OTHER GOVERNMENTAL ENTITIES ARE
THE RESPONSIBILITY OF THE GENERAL CONTRACTOR.
Occupational licenses from City of Miami Beach firms will be required to be
submitted within fifteen (15) days of notification of intent to award.
2. Occupational licenses will be required pursuant to Chapter 205.065 Florida
Statutes.
NOTE: a1 If the contractor is a State of Florida Certified Contractor the
following will be required:
1) Copy of State Contractors Certification
2) Place of Business Occupational License
3) Liability and Property Damage Insurance Certificate made to City
of Miami Beach
4) Workers compensation or the exemption
b) If a Dade County Licensed Contractor:
1) Dade Certificate of Competency in the Discipline Licensed
2) Municipal Contractors Occupational License
3) Liability and Property damage Insurance
4) Workers Compensation or the exemption
NOTE: PLEASE PROVIDE COPIES OF ALL YOUR LICENSES
(COMPANY AND PERSONNEL) AND CORPORATE
CERTIFICATES WITH YOUR BID RESPONSE
As per FBC 1822.1.20, the City shall hire and pay for Special Inspectors for Piling as
required.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 47
00407. SCHEDULE OF PRICES BID:
Consideration for Indemnification of CITY
[X] Cost for compliance to all Federal and State requirements
of the Trench Safety Act'' t^ C:EX ` "
25.00
[NOTE: If the brackets are checked or marked, the Bidder must fill out the
Trench Safety Act sheet, Page 63, Section 00540, to be considered
responsive.]
BID NO: 28-06/07 CITY OF MIAMI BEAE,H
DATE: 03/13/U7 d8
SCHEDULE OF PRICES BID:
BID FORM (Page 1 of 2)
Our LUMP SUM BID includes the total cost for the work specified in this bid,
consisting of furnishing all materials, labor, equipment, supervision, mobilization,
demobilization, overhead & profit, insurance, permits and taxes to complete the
Work to the full intent as shown or indicated in the Contract Documents.
Lump Sum Bid: $~LC~G3~ ~~'• ~ ~
'T~-~v,3`,~,u~
Cdr) E ~-t ~ c ~ r O N Tt</ C~ H' t.~ ~1 ~/Z ~~ CJ,S ~'.~ C_ t ~# 2 ~~.
Written Amount
~,_
__ __,,
FIRM'S NAME (Prir~t or
SIGNATURE:
.-,
r>,
..__ .- .
TITLE/PRINTED NAME: _ ~~_~~,, ~; ~ f - ~ t ~ t.< , _, f " ~,~'_~ ~ ~~>,G= ~~ 7~.
t r ._
ADDRESS: ~ ~ , .~ _~ L c~ ~ < <.. !~~ ~ 4~ ~~~~~_~'f ~. c ,r,~~~- ( `' `' l '1
TELEPHONE NUMBER: ~c ~ `?~-l ~' <,.-a- .~. FAX: _~it~ t~ ~l~~. t:c. a f
BID N0.28-06/07
MULTIPURPOSE MUNICIPAL PARKING FACILITY
BID PACKAGE 01 -UNDERGROUND UTILITIES
~'-
BID N(1: 28-06/07 CTI'~' Or MIAMI BEACI~
DATE: 03!13!0' 49
LIST OF UNIT PRICES
(For Information Purposes only)
BID FORM (Page 2 of 2)
Please provide the following cost for each unit line item and include this form together with your
Schedule of Prices Bid Form on the previous page. Both forms need to be submitted in a sealed
envelope, you may place your company's name on the outside of the envelope.
Construction Fencing Per lineal foot $
2n."~,
Work shall include all costs associated with relocation.
Drainage well Each $ 7 ~-~~ ~''~ ~• ~ f ,
Work shall include all costs associated to provide a complete installation.
Cast -in-place concrete Per cubic yard $ `~ CaC~ " ~ ~
Work shall include all costs associated with cast in place concrete
Water main piping -12"dia Per Lineal foot
$ ~"' v G
~ 2 S '
Work shall include all costs associated to complete the work
"
" ~ ~' ~r r
dia Per Lineal foot
Water main piping - 6
-10 $
Work shall include all costs associated to complete the work
Water main piping 4" dia and smaller Per Lineal foot
$ ~~~ ~>
Work shall include all costs associated to complete the work
Storm Drainage piping -24" dia Per Lineal foot $ ~ ~ ~ ~ ~ ~
Work shall include all costs associated to complete the work
Storm Drainage piping -18" dia Per Lineal foot $
G~~ . c'c+
Work shall include all costs associated to complete the work
Storm Drainage piping -6"- 12"dia Per Lineal foot $ 7~ ~ ~ ~
Work shall include all costs associated to complete the work
Storm Drainage piping -4" dia and smaller Per Lineal foot $ ~ G1 ' .. ,
Work shall include all costs associated to complete the work
Sanitary Sewer piping - 6-8" dia Per Lineal foot $ ~ ~ ~ per
Work shall include all costs associated to complete the work
" ~ n
~ Cl ~
Sanitary Sewer piping - 4
dia and smaller Per Lineal foot $ ,
Work shall include all costs associated to complete the work
Catch Basins Each $ ~ r ~'?~~ ° ~o
Work shall include all costs associated to provide a complete installation.
Curb Inlet Each $ ~ + ~'C*CI ° , ~,
Work shall include all costs associated to provide a complete installation.
Electrical Conduit (FPL) Per lineal foot
$ rs a'+
_ ~ Q ~ ~_
Road Base Per cubic yard
$ tats
~ ~`
Work shall include all costs associated to complete the work
Asphalt Base Course Per ton $ ~ ~ ~- ~~,
Work shall include all costs associated to complete the work
B1D NU: 28-06107 CI°I'i' 6F It~II~MII BEA.CI3
UATi`:: U3i13/07 ~0
BID BOND FORM (Standard Form used by
Surety Company is acceptable
I IAI/'`rlAlfllTlrIAIAI I CTTC~ !1C (`~CI'11T•
T~~iffTl ~~ p7TIL'~Jy~~ A .
~~'vnven~'cTVTr'cTertieF~TTa° in I Ini4~_ C~.+}cam C~~nrlco
~2--I'~ eFe~j~Ft~6f#2:2-jF~9 ~F~ilV-9T
~• 4~~i ~rrl ~r •4~e .~i.i.r,~ ~n•
/r.~n4r~ n~~r ~r~nlin~n} n ~ ~c~~~mor\
• f f
,.~a
~qp
" `^`.7.`7'F~. ~S~}t'e-~}e~Y'TL~ ~ I Ini ,.
~~.~ ij+ZUieJTaT7d ~^
'~~f
s
MM''.. ,,,~ aa~~,,,, ,., ,{ ~
~titt~+~'~~tr-tFt~+Qt't'nF
~
~ s
#et~eep-C
~~M;arF~ eQE~, F-;e~i~n~
~ ~ F':kl an~#e-##e-Bi~J~fltF es~A~e~e~-
s-~eaFsiaas~~..a,. ;-~deF-~ett~-e€-C~Fe~+~-P~~
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/1.3/07 51
~TL~LY°r~~~~~ nrl 'n" ~~~~
7~ ~~ a ~h ~ll nnf ho rloomorl fn innnrnnr~4c
' +
s ~
c~h.~ll he ~ rele~e~e i+f III nhliiv~~innc~
n
a
~ r
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 52
THE AMERICAN INSTITUTE OF ARCHITECTS
AIA Document A390
Bid Bond
KNOW ALL MEN BY THESE PRESENTS, that we
SOLO CONSTRUCTION CORPORATION, 3855 COMMERCE PARKWAY, MIRAMAR, FL 33025.
as Principal, hereinafter called the Principal, and
WESTCHESTER FIRE INSURANCE COMPANY, 500 COLONIAL CENTER, PARKWAY, SUITE 200, ROSWELL, GA 30076
a corporation duly organized under the laws of the State of NEW YORK
as Surety, hereinafter called the Surety, are held and firmly bound unto
CITY OF MIAMI BEACH, 1700 CONVENTION CENTER DRIVE; MIAMI BEACH, FL 33139
as Obligee, hereinafter tailed the Obligee, in the sum of
FIVE PERCENT OF THE AMOUNT BID
Dollars (3 5%- ),
for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind
ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by
these presents.
WHEREAS, the Principal has submitted a~ bid for
DEMOLITION AND DISPOSAL OF PARKING AREA ON EAST SIDE OF MERIDIAN AVE. "P" LOT ADJACENT TO
77717TH ST. MULTIPURPOSE i!iUNICIPAL PARKING FACILITY BID PACKAGE O1-UNDERGROUND UTILITIES
PROJECT: 28-Ott/07
NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract
with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding
or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt
payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter
such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty
hereof between the amount specified in said bid and such larger amount for which the Obligee may in good. faith contrxrt
with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwisR~ to remain
in full force and effect.
Signed and sealed this 16th day Of APRIL
~ 2p07
f'; , "''1 , ? SOLO CONSTRUCTION CORPORATION
4 d ~ ~ / ! ,rrt ,r`_,,~ (Principall iSrat)
,';~ (Witness) ` .,r. -
-- (title) .,~_.....
_ --~=..~
(I _ ESTCHESTER FIRE INSURANCE COMPANY
-E~ -- qr.-., _
(GIV'tnesS) _._ ~ __ ',K rz Jr -'^}` _ ~ ..°'~ .-` --.r=:r
D.W. MATSON III (title) ATTORNEY-INS-FAGS" ND
FLORIDA RESIDE:N't AGENT
AIA DOCUMENT A310 • BfD BONO • AtA ®• FEBRU1IRY 1970 ED • THE hMERICAN ~~_--~
INSTITUTE OF ARCHITECTS, 1735 N.Y. AVE., N.W., WASHINGTON, D. C. 20006 '~
,.
-. .,
_.~u,.._ ~ nr.,~ _ .. _ .. - ___._ --..---- - - -.. - ----
,.~'O1WeY Of WESTCHESTER FIRE INSURANCE COMPANY ~ 1 175246
!Attorney..
i ~
~2447b7
I
Know aII I11CR b~ these pl'eS@ntS: That WESTCHESTER FIRE INSURANCE COMPANY , a corporation of the State of New York ;having its i
~, principal office in the City of Adantt}:,'Georgia ,pursuant to the following Resolutipn, adopted by [he Board of Directors of the said Company on November 8, 1999, to
~ wit-
i
"RESOLVED, That the following Rules shall govern the czceution for the Company of bonds,. undtttakings, raognixances, contracu and other writings in the nature thereo0
(]) That the President, any Senior Dice President, any Vice Preaidrnt, and Assistant Vicc Presideal, or any Anomcy-in-Fact, may cxecmo (or a,td on lxhalf of the Company any and a!1 bonds, undenaltings, recognizance,
contracts-and other writings N the natwe thereof, u+esame to be attested when nccessaly by the Ctupo»te Sarctaty, or. any Assistant Corporate Secraery, and the seal of the Company. affixedthereto;ectd thetthe
President, any Senior V ice President, any VicePresilien4 or any Assistant V ice President may eppointsnd authoriie any other Offices (elected or appointed) of the Company, as Attorneys-In-Fact to so ezocutc or attest to,
the execution of all such writings on behalf of the Company and w affix the. seal of tht Company Ihercta
i (2) Any such writing executed in accordance with theuRules shall be az binding upon the Company in any case as (hough signed by rho President end anated to by the Corpoate Secraary
` (3i The signature Of the President, or a Srnior: Viee President, or a Vice President, or en Assistant Vice Presidem and the seal of the Compenymay be affixed by (acsimile oa any power of attorney granted putsuantto this
Resnluhon, and the stgnaturc of a eerttfyitig O(ticer and the scat of the Company may be affixed by (acsimdc to any certificate of any such power, and any such Puw~G or certificate beanng such facsimile signature aptl seal;
shall lx valid.and;binding on the Company-.
~ (4) Such other O(tieers of the Company, and Attorneys-In-Fact shall have authority to certify or vmfy topics of this Resolution, the By-Laws o(the Company, and any affidavit or record of the-Company necessary to the
discharge:of their duties.
(5) The passage of thisResolution dots not revoke any carlia authority granted by Resolutions o(the Hoard of Dircnors." '
j Does hereby nominate, constitute and appoint D. W. MATSON, III and JOHN W. CHARL,TON both of the City Of Coral Gables, State of Florida
,each individually if there be more than one named, its true and lawful attorney-in-fact, to make, execute, seal and deliver on its behalf, and as Us act and
deed any and'alt bonds, undertakings, recognizances, cpntracts and other writings in the nature thereof in penalties not exceeding Twenty Million Dollars
($20,000,OOOjaitd the execution of such writings in pursuance of these presents shall be as binding upon said Company, as fullyand amply as if they had
i been duly executed and ackowledged by the regularly elected officers of the Company at its principal office. '~
IN WITNESS WHEREOF, the said Stephen M. Haney ,Vice-President, has hereunto subscribed his name and affixed the corporate seal of the j
I said WESTCHESTER FIRE INSURANCE COMPANY .this 29th day of September 2006_
1 y~H~r• WESTCHESTER FIRE INSURANCE COMPANY
3'~ .~~.~
1.~ ~' ,~
ti~G GD„ _~) ~~` __
i '`~-..•.•-~~ Stephen M. Haney ,Vice President
COMMONWEALTH OF PENNSYLVANIA
COUNTY OF PHILADELPHIA ss.
On this 29th day of September , A.D. 20D6 ,before me, a Notary Public of the Commonwealth of Pennsylvania in and-for the County of Philadelphia
came Stephen M. Haney ,Vice-President of the WESTCHESTER FIRE INSURANCE COMPANY to me personally known [o be4he individual and
officer who executed'the preceding instrument, and he acknowledged that he executed the same, and that the seal affixed to the preceding instrument is the '
corporate sea).of said.Company; that the said corporate seal and his signature were duly afTixed by the authority and defection of the said corporation, and
that Resolution, adopted by the Board of Directors of said Company, referred to in the preceding instrument, is now in force.
iN TEST(MONY'WHEREOF, 1 have hereunto set my hand and affixed my ofncial seal at the City of Philadelphia Ehe day and year first above written.
i
I~t 1111111,1 r, i,r,
~ ~. i
~~ ~ ~`.
~` ;~~, ~,rt.': 7 NO~'.ARIAL SEAL ~~~ J
~ ~y, ?J D- Kathleen Titre, Notary Public
{T p '~"1).: PhiiadtlphiaPhilatfelphlaCounty -- - ---- ----- -------T -
1~.~ ~ ?~' ~ c , ~{yGOpt&IiSSipB txpiri:S SeFte*ft~t-:~,'2frJ3 Notary Public
y~ ,,fyc~ Q~ Q~Q~ i
E„~, .....* ~~ 1.
,, f
rI
1, the undersigned Secretary of WESTCHESTER FIRE INSURANCE COMPANY , do hereby certify that the original POWER OF
ATTORNEY, of which the foregoing is a substantially true and correct copy, is in full force and effect.
In wjtr~e~IIhereof, I hav~oeOr~ nto subscribed my name as Secretary, and affixed the corporate seal of the Corporation, thisl 6th day of ~~
IiL4p
i~
` ~- - - ---- - I
~ti~s ~ yo" George D. Mulligan ,Secretary
''~!~wNC~..•
THIS POWER OF ATT-ORNEY MAY NOT BE USED TO EXECUTE ANY F30ND WITH AN INCEPTION DAT E AFTER September 39; 2008 .
__ _
i~~~ - ,
-~ ~,.~
~.....,
00500. SUPPLEMENT TO BID/TENDER FORM:
THIS COMPLETED FORM SHOULD BE SUBMITTED WITH THE BID,
HOWEVER, ANY ADDITIONAL INFORMATION NOT INCLUDED IN THE
SUBMITTED FORM AS DETERMINED IN THE SOLE DISCRETION OF
THE CITY, SHALL BE SUBMITTED WITHIN SEVEN (7) CALENDAR DAYS
OF THE CITY'S REQUEST.
QUESTIONNAIRE
The undersigned authorized representative of the Bidder certifies the truth and accuracy
of all statements and the answers contained herein.
How many years has your organization been in business while possessing one of
the licenses, certifications, or registrations specified in Section 00405?
License/Certification#/Registration# # Years
1 A. What business are you in? ``~ ~ ~ ~` ,~" ~: ~:` ~ ~~ I) ~-r~,~" ~`~ C
2. What is the last project of this nature that you have completed?
dui ~ a~ `~~~._ ~> s> ~,
3. Have you ever failed to complete any work awarded to you? If so, where and
why?
3A. Give owner names, addresses and telephone numbers, and surety and project
names, for all projects for which you have performed work, where your surety
has intervened to assist in completion of the project, whether or not a claim was
made. ~ '
4. Give names, addresses and telephone numbers of three individuals, corporations,
agencies, or institutions for which you have performed work:
BID NO: 28-06/07 CITY" OF MIAMI BEACH
I)A'I'I:: 03!13/07 53
j~1nG
4.1. ; t,I ~ iC? Ix,~~ q ~~~~ ~i~I -Tl. S-t ~~IG-~I
(name) (address)
4.2. ~~ , ~_~c~-e_ - . , ~ , {ti, ?~ ~~~ ~ It_,~,_,_~_ _h_L 33 17~~
u..
(name (address)
~~ ~ ~3 ~~S
(Phone #) lso~)s~~..i-~~c
c 3"=.a115~ ~~ 7l
(phone #)
4.3. ~~u~~c I~..-~-o ° Cc~r~~c, ,:~.~1~ 1~ ti ~ (n~.r•() S.h~..y ~'tk ~-~va~' I~'~In-.,~,f°~~~ 3~j~`I ~
(name) (address) (phone #)
F3os)5~~-1- ~ ~ ~!o
5. List the following information concerning all contracts in progress as of the date of
submission of this bid. (In case of co-venture, list the information for all
co-venturers.)
ORIGINAL CURENT DATE OF % OF
NAME OF OWNER & CONTRACT CONTRACT COMPLETION COMPLETION
PROJECT PHONE # VALUE VALUE PER CONTRACT TO DATE
5E'~ /~~1~cl~ed 5~~~ -I~
(Continue list on insert sheet, if necessary.)
6. Has a representative of the Bidder completely inspected the proposed project and
does the Bidder have a complete plan for its performance?
~Y~=~. ~-
7. Will you subcontract any part of this work? If so, give details including a list of
each subcontractor(s) that will perform work in excess of ten percent (10%) of the
contract amount, the approximate percentage, and the work that will be performed
by each such subcontractor(s). Include the name of the subcontractor(s) and the
approximate percentage of work.
The foregoing list of subcontractor(s) may not be amended after award of the
Contract without the prior written approval of the Contract Administrator, whose
approval shall not be unreasonably withhe{d.
8. What equipment do you own that is available for the work and provide copy of
their maintenance records?
BID NO: 28-n6/07 CITY OF MIAMI BEACI~
DATE: 03/13/0754
Make: Model: Year:
9. What equipment will you purchase for the proposed work?
Make: Model: Year:
10. What equipment will you rent for the proposed work?
Make: Model: Year:
\ } t ~.
~+v ~'1C,i 1~'~~( i... i ~ + F'~;il ,S f'{; j( 1'v"\1`> l~l ~, Y,c' L~-•(, .
11. State the name of your proposed project manager and superintendent and give
details of his or her qualifications and experience in managing similar work.
~a~~ ~~ 1~r"1~Q(~~ a ~1C.F~~ 1 1 ~ 1~SCi}'~ ~~-liiY"f"l~_ ~~It~AL~IE`~~
12. State the true, exact, correct and complete name of the partnership, corporation
or trade name under which you do business and the address of the place of
business. (If a corporation, state the name of the president and secretary. If a
partnership, state the names of all partners. If a trade name, state the names of
the individuals who do business under the trade name).
12.1 The correct name of the Bidder is .~ ~c.;~• ~~ , ~.+~'~ r `~ `~" t~ i`t c t= ~"~, ~ ~ ~~' , ~'~'~ ~ ~ .~ ~ E. ~ ~
~' .__
12.2 The business is a (Sole Proprietorship) (Partnership)((Corporation)~ ~~
~~ ~
BID NU: 28-06%(17 CITI' OF MIAMI BEACH
DATE: 03/13/07 55
SOLO CONSTRUCTION
CORPORATION
E . U~IPM~~T I~IS~`
Combinafiions Li hg' t 15rucks
C-686 -CAT 4 Z 6 T-122 Ford F-150
C-687 -CAT 416 T-123 Ford F-150
C-688 -CAT 416 T-124 Foxd F-150
T-126 Ford F-150
Cxraders T-].30 Foxd Explorer
G-704 - HUBER 850A ~EIeavy Z`rucks
G-705 - CAfi 12 G
H-928 2,000 g.
H-900 Peterbuilt 378
Ro3.Iers H-932 PeterbUi.lt 330
H-929 Ford F-800
R-2552 - TNGERSOLL-RAND SD-100D H-927 Ford F-450
R-2554 -- INGERSOLL-RAND SD - 100D H-954 Peterbu.i.lt 357
R-2562 - INGERSOLL -- RAND SD - 100D H-956 Peterbuilt 357
. H-957 Peterbuilt 357
Dozers H-958 Peterbuilt 357
H-959 Peterbuilt 357
Z-44441- CAT D5T~ ~ H-960 Peterbuilt 357
2-4446 - CAT D6H H-962 Peterbvilt 35?
Z-4448 - KOMATSU D65-EX - 12
Loaders
L-890 CAT 936 F
L-892 CAT 936 F
L-894 CAT 950 F
I~-896 -CAT 966F
Excava#ors
E-524 CAT 235C .
E-526 KOMA.TSU PC400LC-5
E-527 HITACHI EX270LC
E-525 CAT 320G LU
JULIO CUENCA
773 NW 136th Ave., Miami FL 33182
Cell. (786) 402-0601 Home (305) 227-8013
juliocuencaQhotmail.com
PROJECT MANAGER
CONSTRUCTION MANAGER/ FIELD SUPERVISOR
QUALIFICATIONS PROFILE
Multi cultural, dynamic and goal driven engineer with 20 years of combined experience in the General
Contracting, Construction Management and Supervision fields. Proven ability to complete projects
safely, within budget, and on time. Excellent leadership, supervisory, and Scheduling skills,
Dedicated, hard working professional. Projected to complete Florida General Contractor Construction
License
Including but not limited to the participation and liaising of National and International Highway,
Vertical, Commercial, Industrial and Transportation Infrastructure contracting within the
Construction and Civil Engineering Industry.
PROFESSIONAL EXPERIENCE
2006- Present SOLO CONSTRUCTION CORPORATION
Miramar ,Florida ,USA
Naranja Lakes Redevelopment Project
Project Manager
Site clearing, earth work, water, sewer, and drainage construction, new road
ways, and bridges, phase 1A is completed and Phase 1B is on going .
2004 - 2006 SOLO CONSTRUCTION CORPORATION
Miramar, Florida ,USA
Miami International Airport Midfield Phase III C
Project Manager
Demolition and Removal of existing facilities including Incinerator, Wash
Rack, Electrical Vault ,Fire Station ,Luggage Miscellaneous Buildings.
Demolition and Removal of Existing utilities including: Pipe /culvert,
Drainage structures ,concrete encased ducts ,Taxiways and Shoulder
Pavement .
Construction of Approximate 2,500 feet new Taxiway "Y"; 2,300 feet new
Taxiway "W" , 750 Feet new Taxiway "Yl" and 780 fee Taxiway "Y2" .
Including Earth Work , 22" Stabilized Sub grade , 22" Lime-rock base course
5" Bituminous Pavement, paving marking, signage and Bi-directional
green-green Taxiway centerline and elevated base mounted Taxiway edge
light system .
Construction of new High Speed Runway exit on existing Runways 12-30
and 8R-26L including Spiral Uni-directional ,Center light system elevated
and flush Base mounted Rwlway edge light
JULIO CUENCA
773 NW 136th Ave., Miami FL 33182
Cell. (786) 402-0601 Home (305) 227-8013
juliocuencaQhotmail.com
2002 - 2004 CONSOLIDATED CONTRACTORS COMPANY (KUWAITT) W.L.L.
Savannah Forest Station, Stann Creek, Belize, C.A
Belize Southern Highway
Construction Manager
Review and assess project plans and specifications to ensure regulatory
compliance, concerning earthwork ,concrete, pavement ,drainage system
and workforce safety issues.
Prepare progress reports for management review reflecting labor, material,
machinery ,and equipment requirements; track and control construction
costs to avoid budget overruns.
Interface on site and in weekly meetings whit contractors, engineers,
inspectors ,and environmental energy specialist to review project status.
Duect in excess of 50 crews members in areas of scheduling, delegation,
supervision, pay certifications ,and performance evaluation from project
inspection to completion.
2000 - 2002 CONSTRUMUNDO GENERAL CONTRACTORS
San Salvador, El Salvador, C.A
Project Coordinator
1989 - 2000 EDISAL GENERAL CONTRACTORS
San Salvador, El Salvador C.A.
Project Manager /Assistant Project Manager
1987- 1988 FRED McGILVARY INC.
Miami, Florida
Estimator Engineer
EDUCATION AND PROFESSIONAL TRAINING
UCA UNIVERSITY
School of Civil Engineering
San Salvador, El Salvador
"Construction Cost"
Sponsored by Mexican Society of Engineers (SMIEL)
"Harvard Project Manager' - CPM Standards, Pert and Fast Track
"Highways and Bridge Construction Concepts".
Sponsored by World Highways Institute
"Construction High Productivity"
Sponsored by Japanese International Cooperation. Agency (JICA)
RICKY PIERSON
3855 Commerce Pkwy
Miramar, FL 33025
Telephone: (305) 944-3922
EMPLOYMENT Solo Construction Corporation
Vice President
1994-Present.
• Responsible for field operations which includes
Managing project managers, supervisors and foremen.
• Ensure all personnel, equipment and scheduling needs are met on a
daily basis.
• Supervision of safety inspections anal provision of guidance to
ensure safety codes and procedures are adhered to.
• Responsible for monitoring project construction to ensure quality
and compliance.
• Direct administration of company payroll operations
Proiect Manager
1990-1993
• Negotiated contracts with vendors and subcontractors.
• Conducted inspections at work sites to verity adherence to
governmental regulations, ensuring successful completion of
quality control inspections.
• Monitored vendors and subcontractors billing, as well as project
time lines ensuring conformance with schedule deadlines.
• Communicated with owners to resolve-to-resolve outstanding
issues related to projects.
RICKY PIERSON
Projects Completed As Project Manager
• Sunny Isle Beach Restoration and Parking Lot Contract
#695043 Metro-Dade County Public Works Department
Description: Construction of a parking lot, including asphalt
pavement, concrete curb and sidewalks, drainage system, fencing,
sodding, landscaping, pavement marking and signing, lighting and
miscellaneous items.
• Cargo Building 2130 and 2134
Dade County Aviation Department
Description: Utility Works, Paving, and Site Work at Miami
International Airport.
• Brown and Root Construction Service
Dallas, Texas
Hurricane Debris Removal
Description: 1.5 Million tons of debris removed.
Amount of Project: 4,000,000.00
• Cargo Building 2205
Dade County Aviation Department
Description: Managed roadway and large parking lot project with
bridge construction at Miami International Airport. Bridgework
consisted of installing concrete ramp to second floor of cargo
building.
Supervisor/Forman
1983-1990
• Coordinated schedules with subcontractors and inspectors for
completion of required testing, project deadlines, and other issues
related to project.
• Monitored projects according to designs and project specifications.
• Supervision of field employees.
RICKY PIERSON
EDUCATION
Florida International University
• Business Management
Miami Dade Community College
• Clearing Grubbing license Computer skills
r d
,E'~~1(i«~1{ IC[~nJ~ t tti;i~~t _JC•"C i('~Qi ~( ~ ~IEi JOI
12.3 The address of principal place of business is
F ~ ,_,~ _.
~.~ i:) ~_ ~ 'E`5~, ti-~-,~~ ~ ~ C~:. k ~ ~ a' K- ~~ l c't ~,r j~~ ; z 4t r d, G; ;'" `- ~ 5(:.i `7
12.4 The names of the corporate officers, or partners, or individuals doing
business under a trade name, are as follows:
~\ C, i ~ ~i
12.5 List all organizations which were predecessors to Bidder or in which the
principals or officers of the Bidder were principals or officers.
BID NO: 28-06/07 CITS' OF MIAMI BEACH
DATE: 03/13!07 56
12.6. List and describe all bankruptcy petitions (voluntary or involuntary) which
have been filed by or against the Bidder, its parent or subsidiaries or
predecessor organizations during the past five (5) years. Include in the
description the disposition of each such petition.
J\:;~; ;~
12.7. List and describe all successful Performance or Payment Bond claims
made to your surety(ies) during the last five (5) years. The list and
descriptions should include claims against the bond of the Bidder and its
predecessor organization(s).
~,` ;\ t`
12.8 List all claims, arbitrations, administrative hearings and lawsuits brought
by or against the Bidder or its predecessor organization(s) during the last
five (5) years. The list shall include all case names; case, arbitration or
hearing identification numbers; the name of the project over which the
dispute arose; a description of the subject matter of the dispute; and the
final outcome of the claim.
Cam. ~~
ll:'~C:' ~~C`i`l`-}"~\~`l. C. ~1~=.:r~'~ ~f ~~;j.it"ii ~<tiil(.' 4,.~.C?c,~\~~1 ~~e lCh'~!(/s~
~ `' ;
~ '
BID NO: 28-06/07 CITY OT :~ZIA.I~ZI BEACH
DATE: 03/13/07 57
12.9. List and describe all criminal proceedings or hearings concerning
business related offenses in which the Bidder, its principals or officers or
predecessor organization(s) were defendants.
i
12.10. Has the Bidder, its principals, officers or predecessor organization(s)
been debarred or suspended from bidding by any government during the
last five (5) years? If yes, provide details.
! -,,
12.11. U`n~d[er what conditions does the Bidder request Change Orders.
1~'V ~Q`n C.~%C. ~.1~CGU~f'1 ~E 4~ l,'rl Os~SC~F'~(1
BID NO: 28-06!07 CITI' OF MIAMI BEACH
DATE: 03/I3/0', 58
00520. SUPPLEMENT TO BID/TENDER FORM
NON-COLLUSION CERTIFICATE
THIS FORM MUST BE SUBMITTED PRIOR TO AWARD FOR BIDDER TO
BE DEEMED RESPONSIBLE.
l.,
Submitted this ~ ~~ day of _,°~ i~~ ~ + ~ , 200
The undersigned, as Bidder, declares that the oniy persons interested in this Bid are
named herein; that no other person has any interest in this Bid or in the Contract to
which this Bid pertains; that this Bid is made without connection or arrangement with any
other person; and that this Bid is in every respect fair and made in good faith, without
collusion or fraud.
The Bidder agrees if this Bid is accepted, to execute an appropriate City of Miami Beach
document for the purpose of establishing a formal contractual relationship between the
Bidder and the City of Miami Beach, Florida, for the performance of all requirements to
which the Bid pertains.
The Bidder states that this Bid is based upon the documents identified by the following
number: Bid N ".;~28-06/07
i
SI N-~)`TUR~ ! J1
PRINTED NAME
TITLE (IF CORPORATION)
BID NO: 28-06/07 CITY OF 1VIIA.MI BEACH
DATE: 03!13/07 59
Table Of Contents
Section One
Identification Page
Declaration: Nondiscrimination in Contracts and Benefits
Reasonable Measures Application
Section Two
Bid/Tender Forms
Bid Bond
Supplement to Bid/Tender Forms
Section Three
Insurance
Statement of Compliance
Permits/Licenses
Section Four
Representative Projects
Organizational Chart
Staffing Plan
Section Five
Aclozowledgement of Addenda
Addendums 1 & 2
Subcontractors Listing Information
SECTION
ONE
• Identification Page
• Declaration: Nondiscrimination in
Contracts & Benefits
• Reasonable Mearsures Application
SECTION
THREE
• Insurance
• Statement of Compliance
• Permits/Licenses
Sign In Sheet
Invitation to Bid (ITBJ 28-06/07
April 1 b, 2007
MULTIPURPOSE MUNICIPAL PARKING GARAGE
BID PACKAGE Ol
UNDERGROUND UTILITIES
Name
(Please Print)
Company
Phone, #
Time
t J Ito C~EMCR~,.
~~ 7
.~~~,~.~
~~~~s~~ tt~ ~~~o~~
~c:~ ,~~t
~
`7
t
-
i-'~'-~,...,
~ +f
f//~~ (J//JJ ~~_.
P ~,
a;~:~/f"ii; art,-°~
y f / ~-,,:
a ~ ~ ~SI ~'
t~ r TATE OF FLORIDA
r ~
'-~.~.`.,~=-~ DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION
•i' CONSTRUCTION INDUSTRY LICENSING BOARD (850) 487-1395
'.,,. ' _ ~' 1940 NORTH MONROE STREET
°°°~1 TALLAHASSEE FL 32399-0783
SOLO CONSTRUCTION CORPORATION
3855 COMMERCE PARKWAY
MIRAMAR FO 33025
STATE OF FLORIDA A(~~,f ~.~ ~ ~ 3
DEPARTMENT OF BUSZNESB .AND _`
..~1 PROFESSIONAL REGULATIONv
QB2153I 06/20/05 047004945
'QUALIFIED .BUSINESS ORGANI~ATTON-j
''-SOLO CONSTRUCTION CORPOR-ATION
(NOT A LICENSE TO-PERFORM WORK.
ALLOWS COMPANY TO DO BUSINESS .IF
IT,<HAS A LICENSED QUAY,IFIER. )
IS QUALIFIED-undoz tho provisions of ch.~4~9 F'H:_
axpirncion-secs: AUG` 31,'- 2'007 Loso6zonosa5
_ i
DETACH HERE
~# Q~ ~ ~ ~ ~ STATE.-OF FLORIDA __- _ _.
_ -
_ , ~ ; ..-.
DEPARTMENT OF`BUSINESS AND :P~ROFESSLONAL REGULATION ''
'b
CONSTRUCTION INDUSTRY LICENSING BOARD S`EQ#Lb5062b,b057,S `.
- •r; ~:3
~~ = - LICENSE NBR -
)6 .~~0 2'005 ~,,~ ,.,:
a'~.l'004945
621531
;1°ne,BUSI.NESS.ORGANIZATTON
Named below IS QUALIFIED
Under 'the provisions of Chapter, 489 FS.
Expiration .date AU±a,.3~~`~~'a0'7•
jT~iI$ IS NOT A LICEI+IS.E 'TO ,PERFORM WORK. THIS ALLOWS
COMPANY TO .DO BUSINESS ONLY IF IT HAS A QUALIF3ER.)
., .
SOLO-CONSTRUCTION CORPORATION
3855 COMMERCE PARKWAY
MIR.AMAR F0 33025
JEB BUSH
GOVERNOR DISPLAY AS REQUIRED BY LAW
DIANE- PARR
SECRETARY
~~+~~~ STATE OF FLORIDA
' ~~ '".°,~ ~ DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION'
~..
T ~ CONSTRUCTION INDUSTRY LICENSING BOARD (850) 487-1395
'.,,. ' - ~' 194 0 NORTH MONROE STREET
`°°~T TALLAHASSEE FL 32399-0783
PIERSON, RANDY L
SOLO CONSTRUCTION CORPORATION
2920 WINDMILL RANCH RD
FT LAUDERDALE FL 33331
DETACH HERE
~# ~ 6 ~ 5 ~ ~ ~ STATE ~OF FLORIDA
,DEPARTMENT OF BUSINES:S_ AND PROFESSIONAL REGULATION
CONSTRUCTION INDUSTRY LLICENSING'"HOARD .: SEQ#L0607:22008,7.4
•• - LICENSE NBR
)7 22:2006 0:58096.536 CUC025613
;erne UNVERGROUND UTILITY & EXCAVATION CO
'Named below IS `CERTIFIED
Under the provisions of Chapter 489 FS.
Expiration date: AUG 31, 20.08
PIERSON, RANDY L -
SOLO CONSTRUCTION CORPORATION
2920 WINDMILL RANCH RD
FT LAUDERDALE FL 33331
JEB BUSH ~ SIMONE MARSTILLER
GOVERNOR nicoi nv ne c~Gni uprn uv i n~nr SECRETARY
SECTION
FOUR
• Representative Projects
• Organizational Chart
• Staffing Plan
i•~
~~
V
0
•,~
GCS
N
•~,
b~A
O
.,.,~
GCS
,L~
O
O
O
•.~
v
r..~
O
O
.•~
O
STAFF PLAN
Construction Project Manager :Julio Cuenca
Extensive experience in construction and a broad background in all aspects of the
management process.
The above functions are one of the critical responsibilities:
Primary contact with city
Organize and plan the Job
Buy out project (issue subcontracts and purchase orders)
Submittals and transmittals
Maintain change request log and control changes
Formal correspondence with owner and A/E
Make or enforce required decisions to assure that major objectives are met.
Assist Superintendent to attain job goals.
Conduct regular progress meetings with owner /architect
Conduct pre construction conference
Prepare breakdowns for payment and payment request
Conduct inspections as required by the quality control program
Construction Superintendent :Ricky Pierson
Assist Project Manager as required
Organize and plan job with Project manager in a daily bases
Organize, Schedule and direct personnel and subcontractors
Review cost and progress weekly
Monitoring of MOT plan
Ensure Testing coordination.
Coordinate and maintain equipment
Field procwement
Respond to Reports
Support the Quality control program
Enforce all safety rules and procedwes
Secwe site and closeout site each work day
Site Foreman : Delroy Ricketts
Water Main, Storm Drainage, Sanitary Sewer piping and installation of
structures Foreman
Foreman :James Felix
Clearing ,Demolitions, Removal of Asphalt ,Road base Foreman
James Felix
Vladimir Chomiak:
Survey ,Verified Locations of existing utilities, Construction Lay Out
and As built record Certified Survey
Derron Pierson:
Equipment Operations and Maintenance Manager
Subcontractors
Cast in Place Concrete Work, Curb & Gutter, Valley Gutter, Sidewalk
and Protection Concrete Slab on Box Culvert .Sub Contractor
Homestead Paving ,contact Dominic Gonzalves
Restoration of Asphalt ,Milling, Asphalt Base Course Sub Contractor
General Asphalt, contact Albert Lopez
Drainage Well Drilling Sub Contractor : Jeffers Well Drilling
Temporary and Permanent Striping and Signing Sub Contractor
Robert's Traffic ,contact Lisa Birchfield
Electrical work Sub Contractor: Atlas corp.
Engineering ,Shoring protection design and Monitoring Sheet piling
driving vibration Sub Contractor : Ebsary Foundation
50 LO ~ t~ ~ o~at~
3555 Commerce Parkway Miramar, Florida 33025 Phone: (954) 447-2800 Fax: (954) 447-6768
STATE SCHOOL QQ1 K-8 FACILITY
Address: 3030 NE 1515. North Miami, FL 33181
Awarded Contract Amount: $208,000 Final Contract Amount: $276,000
Status: COMPLETED 12/31/05
. j~
+, ,~
_=~`~ : r ~.~ ..~ .
PHOTO COURTESY OF SOLO CONSTRUCTION ~
Brief Description
Installation of ~~aterline.
Team Members
.: mac.,.: > . ~ _
Owner: The School Board of Mian-li-Dade County
Address: 1450 NE 2~~a. Avenue Miami, Fl 33025
PH/FX: (305) 995-1000/
General Contractor: F&L Construction, Inc
Sub Contractor: SOLO Construction Corporation
Architect/Engineer: Brown +Brown Architects /ADA Engineering
!Storm drainage systems
Class 5 drainage wells
-i Sanitary sewer systems
[yPotable water systems
l High voltage electrical disn-huti~n
Contact Name: Julio Batista
Superintendent :Ricky Pierson
Project Manager: Ricky Pierson
-! Telephone and data distribution
i ?Reinforced concrete load distribution
[_' Other: List as may apply
SOLO ~~,_
3855 Commerce Parkway Miramar, Florida 33025 Phone: (954) 447-2800 Fax: (954) 447-6768
NARANTA LAKES REDEVELOPMENT PROTECT
Project Address: SW 140TH Ave & SW 272nd St Naranja, Florida
Awarded Contract Amount: $3,787,732.00 Final Contract Amount: $4,228,598.22
Status: One Phase Completed 12/31/06
Brief Description
After the destruction of this neighborhood in 1992 by Hurricane Andrew, Miami Dade County created a
Community Reinvestment Act (CRA) to rebuild this devastated Community. SOLO Construction Corporation
was the successful bidder to provide site clearing, earthwork, water, sewer, and drainage constriction, new
roadways, and bridges in an effort to rebuild this community this project is on going.
Team Members
Owner: Naranja Lakes Construction LLC Contact Name: Scott I Iedge
Address: 14600 SW 136 Street Miami, Florida 33186
PH/FX: (305)259-3100/(305)259-3200
General Contractor: SOI_,O Constn_iction Corporation Superintendent: Delroy Rickets
Architect/Engineer: Ford Engineers Inc. Project Manager: Julio Cuenca
f_~~Stonn drainage systems
(J Class 5 drainage wells
IY' Sanitary sewer systems
~~'Potable water systems
~:_' Nigh voltage electrical distribution
(7 'Telephone and data distribution
U Reinforced concrete load distribution
:: i Other: List as may apply
SOLO ~~
3855 Commerce Parkway Miramar, Florida 33025 Phone: (954) 447-2800 Fax: (954) 447-6768
CITY OF SWEETWATER STORM WATER IMPROVEMENTS
Project Address: SW 102nd Place & SW 5w Street
Awarded Contract Amount: $2,1.42,764.00
Status: COMPLETED 7/1/04
Final Contract Amount: $2,511,520.00
Brief Descri tp ion
Site demolition, installation. of several pump stations, stormceptor, drainage and sewage, relocation of existing
water main at various locations throughout the City of Sweetwater
Team Members
Owner: The City of Sweetwater
Address: 500 SW 109TH Avenue Sweetwater, FL 33174
PH/FX: (305)221-0411./(305)221-?_541
General Contractor: SOLO Construction Corporation
Architect/Engineer: Craig A. Smith Associates
1000 W McNabb Rd
Pompano Bch, Fl 33069
(954)782-8222
r~±'~Stonn drainage systems
C1 Class 5 drainage wells
Sanitary sewer systems
I:: Potable water systems
~ High voltage electrical distribution
Contact Name: Joe Jeffries
Superintendent: Keith Leslie
Project Manager: Stanley Bateman
Ci Telephone and data distribution
i 1 Reinforced concrete load distribution
i-1 Other: List as may apply
JULIO CUENCA
773 NW 136" Ave., Miami FL 33182
Cell. (786) 402-0601 Home (305) 227-8013
j uliocuenca®ho tm ail. com
PROJECT MANAGER
CONSTRUCTION MANAGER/ FIELD SUPERVISOR
QUALIFICATIONS PROFILE
Multi cultural, dynamic and goal driven engineer with 20 years of combined experience in the Ceneral
Contracting, Construction Management and Supervision fields. Proven ability to complete projects
safely, within budget, and on time. Excellent leadership, supervisory, and Scheduling skills,
Dedicated, hazd working professional. Projected to complete Florida General Contractor Construction
License
Including but not limited to the participation and liaising of National and International Highway,
Vertical, Commercial, Industrial and Transportation Infrastructure contracting within the
Construction and Civil Engineering Industry.
PROFESSIONAL EXPERIENCE
2006- Present SOLO CONSTRUCTION CORPORATION
Miramaz ,Florida ,USA
Nazanja Lakes Redevelopment Project
Project Manager
Site clearing, eazth work, water, sewer, and drainage construction, new road
ways, and bridges, phase lA is completed and Phase 1B is on going .
2004 - 2006 SOLO CONSTRUCTIOl~' COI~I'ORATION
Miramar, Florida ,USA
Miami Intemational Airport Midfield Phase III C
Project Manager
Demolition and Removal of existing facilities including Incinerator, Wash
Rack, Electrical Vault ,Fire Station ,Luggage Miscellaneous Buildings.
Demolition and Removal of Existing utilities including: Pipe /culvert,
Drainage structures ,concrete encased ducts ,Taxiways and Shoulder
Pavement .
Construction of Approximate 2,500 feet new Taxiway "Y"; 2,300 feet new
Taxiway "W" , 750 Feet new Taxiway "Yl" and 780 fee Taxiway "Y2" .
Including Eazth Work , 22" Stabilised Sub grade , 22" Lime-rock base course
5" Bituminous Pavement, paving marking, signage and Bi-directional
green-green Taxiway centerline and elevated base mounted Taxiway edge
light system .
Construction of new High Speed Runway exit on existing Runways 12-30
and SR-26L including Spiral Uni-directional ,Center light system elevated
and flush Base mounted Runway edge light
JULIO CUENCA
773 NW 136 Ave., Miami FL 33182
Cell. (786) 402-0601 Home (305) 227-8013
juliocuenca®hotmail.com
2002 - 2004 CONSOLIDATED CONTRACTORS COMPANY (KUWAITT) W.L.L.
Savannah Forest Station, Stann Creek, Belize, C.A
Belize Southern Highway
Construction Manager
Review and assess project plans and specifications to ensure regulatory
compliance, concerning eazthwork ,concrete, pavement ,drainage system
and workforce safety issues.
Prepare progress reports for management review reflecting labor, material,
machinery ,and equipment requirements; track and control construction
costs to avoid budget overruns.
Interface on site and in weekly meetings whit contractors, engineers,
inspectors ,and environmental energy specialist to review project status.
Duect in excess of 50 crews members in areas of scheduling, delegation,
supervision, pay certifications ,and performance evaluation from project
inspection to completion.
2000 - 2002 CONSTRUMUNDO GENERAL CONTRACTORS
San Salvador, El Salvador, C.A
Project Coordinator
1989 - 2000 EDISAL GENERAL CONTRACTORS
San Salvador, EI Salvador C.A.
Project Manager /Assistant Project Manager
1987 -1988 FRED McGILVARY 1NC.
Miami, Florida
Estimator Engineer
EDUCATION AND PROFESSIONAL TRAINING
UCA UIVNEIZSTTY
School of Civil Engineering
San Salvador, El Salvador
"Construction Cost"
Sponsored by Mexican Society of Engineers (SMIEL)
"Harvazd Project Manager' - CPM Standards, Pert and Fast Track
"Highways and Bridge Construction Concepts".
Sponsored by World Highways Institute
"Construction High Productivity"
Sponsored by Japanese International Cooperation Agency (JICA)
ji,ILlO CLIENCA
773 NW 136w Ave., Miami FL 33182
Cell. (786) 402-0601 Home (305) 227-8013
juliocuenca®hotmail.com
OTHER SKILLS
• Experience in export and import operations
• Knowledge and experience of heavy equipment maintenance
• Quality control Management
• Operation of crusher plants and the production of aggregates for concrete and hot mix
asphalt.
• Erection and setting up of metallic structure.
• Knowledge and operation of utility computer programs including Microsoft Excel, Lotus
Smart Suite, Microsoft Word, Quattro pro, Harvard Project Manager, Time Line, Auto Cad
• Fluent in written and spoken English and Spanish
• Computer Literate
ACHIEVMENTS:
- QC / QA experience in Hot Mix Asphalt.
- US ARMY CORPS OF ENGINEERS spec's management experience.
- BSN British Standazds and ISO-9002 Contracting experience.
- MIA Airside Operation Area driving Certification
PERSONAL: Mazried, US Citizen, Bilingual English-Spanish
Bom 6/18/64
REFERENCES: Upon Request
RICKY PIERSON
3855 Commerce Pkwy
Miramar, FL 33025
Telephone: (305) 944-3922
EMPLOYMENT Solo Construction Corporation
Vice President
1994-Present.
• Responsible for field operations which includes
Managing project managers, supervisors and foremen.
• Ensure all personnel, equipment and scheduling needs are met on a
daily basis.
• Supervision of safety inspections and provision of guidance to
ensure safety codes and procedures are adhered to.
• Responsible for monitoring project construction to ensure quality
and compliance.
• Direct administration of company payroll operations
Proiect Manager
1990-1993
• Negotiated contracts with vendors and subcontractors.
• Conducted inspections at work sites to verity adherence to
governmental regulations, ensuring successful completion of
quality control inspections.
• Monitored vendors and subcontractors billing, as well as project
time lines ensuring conformance with schedule deadlines.
• Communicated with owners to resolve-to-resolve outstanding
issues related to projects.
RICKY PIERSON
EDUCATION
Florida International University
• Business Management
Miami Dade Community College
• Clearing Grubbing license Computer skills
SECTION
FIVE
• Acknowledgement of Addenda
• Addendums 1 & 2
• Subcontractors Listing Information
~ MIAMIBEACH
City of Miami Beath, 1700 Convention Center Drive, Miomi Beach, Florida 33139, www.miamibeachfl.gov
PROCUREMENT Division
Tel: 305-673-7490, Fax: 305.673.7851
INVITATION TO BID (ITB) NO. 28-06/07
ADDENDUM NO. 2
April 11, 2007
FOR MULTIPURPOSE MUNICIPAL PARKING FACILITY BID PACKAGE 01 UNDERGROUND
UTILITIES is amended as follows:
THIS ADDENDUM IS A DUPLICATE OF ADDENDUM 1 only the weight on the selection criteria
has been amended No on-line bid submittals will be accepted only hard copy paper bids to
be delivered to the City of Miami Beach Procurement Division.
I. The following are answers to questions from prospective bidders.
Q. Will any of the excavated materials be reusable?
A. Please refer to the Technical Specifications section 02315.
Q. Is builder's risk insurance necessary for this project considering there is no building
involved?
A. Yes, Builder's Risk Insurance is a requirement. There are adjacent structures that may
be affected and for this reason Builder's Risk Insurance is required.
Q. Does the City have a scheduled date for Interviews from bidders in reference to this bid?
A. The Technical Review Panel will meet during the week of April 16-20 and will invite
those bidders who are deemed responsive to the bid requirements. Bidders are
requested that they have their key personnel available for interviews on the week of
April 16-20. The key personnel include the following positions:
1) Construction Project Manager
2) Construction Superintendent
Q. Sheet 65 of the bid document states "This contract is by and between the City of Miami
Beach and Ebsary Foundation, Inc." Please provide corrected sheet.
A. Attached to this Addendum is corrected page 65 to be replaced in the bid document.
II. Attached are Amended pages 28 and added page 28-b to be replaced in the bid document.
Amendments are as follows:
The words that have been strikethrough are deleted, and the words underlined are being added.
The TECHNICAL REVIEW PANEL (the "Panel")will rank all responsive bidders and will provide
their recommended ranking to the City Manager. plaasefr-to-t-The
evaluation and scoring process to determine the ranking of bidders a~$ will be as
follows:
1) Qualifications and Experience of Contractor's Team (;~15 points)
tr ~.<r c:i nr~r,ne:i ro t. ,, ~r,l.} ~- , 'i.ail! ..,u .ar-.~,.. .r. c~ :; e~;~, ;.. o; ..i.c, ;:.rr, he „k, o:;;:r j L,. .:; . i:: ~.,:~r. r t ,. J; jr., t 'r : ~ rlr•n:u,i;iy.
2) Risk Assessments (10 points). A Preliminary Project Schedule should be attached to the
~tAizRisk Assessment Plan (RAP).
3) Past performance based on number and quality of the Performance Evaluation Surveys (5
points).
3) 41Presentation and Interview of Key personnel (~ 20 points).
4} SZBid Price (~A 50 points).
Scoring and ranking procedure:
When tfae-T€CHPfISAI= F~~~VI #~P~~~~~
iist-k~idder~fe~safltar~datien e~Rhasa
shall-bc~sar~+ed even to
#~e evaidated grid sacred at-the and of tfie€valaatier~-~resess~#
the~E-6HNaShL-~€VI€W R111~IE-~has~Fevidad tMelr sFe
sfaatl-ar{-ive-at-a fnaa~Eere a~-whisl~-t~m~-thejr-will--pfe '
fesemr~endatiAra to the~ity-ManaaAr w#~ish~r~ tarn-#ia-will~revide his
6sr~issie+~
The Tyr''-'""r'ni DCVICIAI DA"ICI panel will convene and will score and rank all responsive bidders
based on the above criteria The Panel's recommendation will be presented to the City Manager.
After considering the recommendation(s) of the Panel the City Manager shall recommend to the
Mavor and City Commission the bid(s) that the City Manager deems to be in the best interest of the
City unless only one bid response is received, and/or the lowest and best bid exceeds the budgeted
amount allocated towards the construction cost of the project, then the Citv Manager, without any
action by the Mavor and City Commission has the authority, pursuant to Section 2-367 of the Miami
Beach City Code to exercise any of the following options:
(1) Reject the bid and if he determines that same is in the best interest of the City. re-advertise the
item for bidding: or
j2) Request that the Mavor and City Commission make additional funds available and proceed to
negotiate an agreement with the sole bidder; or
~3) Negotiate an agreement with the lowest and best bidder exceeding the budgeted amount of the
work If the City Manager is unable to successfully negotiate an agreement with the lowest and best
bidder the City Manager may terminate negotiations with such bidder and commence negotiations
with the second lowest and best bidder. If the City Manager is unable to successfully negotiate an
agreement with the second lowest and best bidder, the Citv Manager may terminate negotiations
with the second bidder and commence negotiations with the third lowest and best bidder.
The City Commission shall consider the City Manager's recommendation(s) and, may approve or
reject the City Manager's recommendation(s). In any case, the Mayor and City Commission shall
select and authorize negotiations with the bidder(s) which the Mayor and Commission deem to be in
the best interest of the City. The City Commission may also reject all bids received.
The selection or approval by the City Commission shall not constitute a binding contract between
the City and the selected or approved bidder(s). A binding contract will exist upon the completion of
successful negotiations as determined by the Administration, the Citv Attorney's Office form
approving the contract or contracts. and then the Mayor and Citv Clerk siar-ing the contract(s) after
the selected or approved bidder(s) has (or have) done so. Onl r~the executed contract swill be
binding on the contracting parties.
lYe iaP r ~~ r•~ ti;-; , h: c zb7rno e c l:nr ;;~ .; r ..erdr:F• and :.;r r!r ro ob xhc ~n,t- v.c ~ a•:•rr E.c.y a rw 1 ~;.:u,l, ,.~ :r:r n, n+. cr t e<mv~un~~:
Bidders are advised to acknowledge this Addendum on ITB document Page 138, "Acknowledgement
of Addenda", or the bid may be considered non-responsive.
CITY OF MIAMI BEACH
Gus Lopez, CPPO
Procurement Director
rm
F:\PURC\$AL L1Romanlbids\071ITB-28-06-07\itb-28-06-07A2.doc
V•lr- cur. ,~ca, -+;.::. i,; i , ,wuirn_:..~ec- : ..~~. ~ ..~!. ..:~:,, r rind su er,, to ~ri~ ~~,/!c! ih.r. ~ in., ~~r:ii i:iuy a: c;t, ~ vd:r~.~ni, tt-.:E~~:.ur, ~,~.,~:nc. Cc~ntnrurr~ly.
00305. TECHNICAL REVIEW PANEL SELECTION CRITERIA /
SELECTION PROCESS
The Evaluation process to be used by the City for this bid will be one of "Best Value
Procurement", meaning that the City will, in addition to price, consider past performance
on previous contracts, Risk Assessment for this ITB, Qualifications of Personnel
proposed, and presentation and interview of Contractor's personnel. (See Section
00315)
The procedure to be used for bid evaluation and selection is as follows:
• Invitation to Bid issued.
• Pre-Bid Meeting.
• Receipt of bids.
• Opening and listing (except pricing) of all bids received.
• Review all bids for responsiveness.
• Distribution of all responsive bids to the Technical Review Panel.
The TECHNICAL REVIEW PANEL (the "Panel") will rank all responsive bidders and will
provide their recommended ranking to the City Manager. The evaluation and scoring
process to determine the ranking of bidders will be as follows
1) Qualifications and Experience of Contractor's Team (15 points)
2) Risk Assessments (10 points). A Preliminary Project Schedule should be
attached to the Risk Assessment Plan (RAP).
3) Past performance based on number and quality of the Performance Evaluation
Surveys (5 points).
4) Presentation and Interview of Key personnel (20 points).
5) Bid Price (50 points).
Scoring and ranking_procedure:
The Panel will convene and will score and rank all responsive bidders based on the
above criteria. The Panel's recommendation will be presented to the City Manager.
After considering the recommendation(s) of the Panel, the City Manager shall
recommend to the Mayor and City Commission the bid(s) that the City Manager deems
to be in the best interest of the City, unless only one bid response is received, and/or
the lowest and best bid exceeds the budgeted amount allocated towards the
construction cost of the project, then the City Manager, without any action by the Mayor
and City Commission, has the authority, pursuant to Section 2-367 of the Miami Beach
City Code, to exercise any of the following options:
(1) Reject the bid and, if he determines that same is in the best interest of the City, re-
advertise the item for bidding; or
(2) Request that the Mayor and City Commission make additional funds available and
proceed to negotiate an agreement with the sole bidder; or
(ITB-28-06/07
CfTY OF 1~IlAM1 BEACH Amended Page 28,
28 Addendum 2)
(3) Negotiate an agreement with the lowest and best bidder exceeding the budgeted
amount of the work. If the City Manager is unable to successfully negotiate an
agreement with the lowest and best bidder, the City Manager may terminate
negotiations with such bidder and commence negotiations with the second lowest and
best bidder. If the City Manager is unable to successfully negotiate an agreement with
the second lowest and best bidder, the City Manager may terminate negotiations with
the second bidder and commence negotiations with the third lowest and best bidder.
The City Commission shall consider the City Manager's recommendation(s) and, may
approve or reject the City Manager's recommendation(s). In any case, the Mayor and
City Commission shall select and authorize negotiations with the bidder(s) which the
Mayor and Commission deem to be in the best interest of the City. The City
Commission may also reject all bids received.
The selection or approval by the City Commission shall not constitute a binding
contract between the City and the selected or .approved bidder(s). A binding
contract will exist upon the completion of successful negotiations as determined by the
Administration, the City Attorney's Office form approving the contract or contracts, and
then the Mayor and City Clerk signing the contract(s) after the selected or approved
bidder(s) has (or have) done so. Onty the executed contract(s) will be binding on the
contracting parties.
(ITB-28-Q6/07
CITY OF MIAMI BEACH Added Pale 28-b,
28-b .4ddcndum 2)
00600. CONTRACT
CONTRACT
THIS IS A CONTRACT, by and between the City of Miami Beach, a political
subdivision of the State of Florida, hereinafter referred to as CITY, ~ and
hereinafter referred to as CONTRACTOR.
W I T N E S S E T H, that CONTRACTOR and CITY, for the considerations
hereinafter named, agree as follows:
ARTICLE 1
SCOPE OF WORK
CONTRACTOR hereby agrees to furnish all, unless specifically stated otherwise, labor,
materials, equipment, supervision, mobilization, demobilization, survey, services and
incidentals necessary to perform and complete the work to the full intent as shown or
indicated in/on the Contract Documents and related thereto for the Project.
ARTICLE 2
CONTRACT TIME
2.1 CONTRACTOR shall be instructed to commence the Work by written instructions
in the form of a Standing Order issued by the City's Procurement Director and a
Notice to Proceed issued by the Contract Administrator. Two (2) Notices to
Proceed will be issued for this Contract. CONTRACTOR shall commence
scheduling activities, permit applications and other preconstruction work within
five (5) calendar days after the Project Initiation Date, which shall be the same as
the date of the first Notice to Proceed. The first Notice to Proceed and Purchase
Order will not be issued until CONTRACTOR's submission to CITY of all required
documents (including but limited to: Payment and Performance Bonds, and
Insurance Certificate) and after execution of the Contract by both parties.
2.1.1. The receipt of all necessary permits by CONTRACTOR and acceptance
of the schedule duration as stated herein and acceptance and approval
of CONTRACTOR'S List of Deliverables, Project Schedule, Mobilization
Plan, Safety & Health Manual, Quality Control Manual, Risk
Management Plan, Schedule of Values, and attendance at the Pre-
Construction Conference to review general administrative requirements;
and to review in detail the Scope of Work and CONTRACTOR'S "Base
Line" Project Schedule is a condition precedent to the issuance of the
Second Notice to Proceed to mobilize on the Project Site and commence
with the physical construction of the Work.
~rrB-as-oGro7
BID NO: 28-OG/07 CITY OF MIAMI BEACH Amended Page 65,
UA'1'E: 03/13/07 GS Addendum 2)
MIA1~11 BEACH
City of Miami Beach, 1700 Convention Center Drive, Miami Beoch, Florida 33139, www.miamibeachfl.gov
PROCUREMENT Division
Tel: 305-673-7490, Fox: 305.673.7851
INVITATION TO BID (ITB) NO. 28-06/07
ADDENDUM NO. 1
April 10, 2007
FOR MULTIPURPOSE MUNICIPAL PARKING FACILITY BID PACKAGE 01 UNDERGROUND
UTILITIES is amended as follows:
1. The following are answers to questions from prospective bidders.
Q. Will any of the excavated materials be reusable?
A. Please refer to the Technical Specifications section 02315.
Q. Is builder's risk insurance necessary for this project considering there is no building
involved?
A. Yes, Builder's Risk Insurance is a requirement. There are adjacent structures that may
be affected and for this reason Builder's Risk Insurance is required.
Q. Does the City have a scheduled date for Interviews from bidders in reference to this bid?
A. The Technical Review Panel will meet during the week of April 16-20 and will invite
those bidders who are deemed responsive to the bid requirements. Bidders are
requested that they have their key personnel available for interviews on the week of
April 16-20. The key personnel include the following positions:
1) Construction Project Manager
2) Construction Superintendent
Q. Sheet 65 of the bid document states "This contract is by and between the City of Miami
Beach and Ebsary Foundation, Inc." Please provide corrected sheet.
A. Attached to this Addendum is corrected page 65 to be replaced in the bid document.
II. Attached are Amended pages 28 and added page 28-b to be replaced in the bid document.
Amendments are as follows:
The words that have been strikethrough are deleted, and the words underlined are being added.
The TECHNICAL REVIEW PANEL (the "Panel") will rank all responsive bidders and will provide
their recommended ranking to the City Manager. The
evaluation. and scoring process to determine the ranking of bidders aid-~#e~r-are will be as
follows:
~~LA~€-4
1) Qualifications and Experience of Contractor's Team (2&-1 C~oints)
t ~I. F' .'i::•!r n r,{i 17 } 7. 7ir i•.) C ;'ignl ~ t UIr:.>e?!~k .. )rlti :ii )rr^: i0 Uil roil(', irvP. t (.~l E, i)!:ii ))S:Jy In Url ~i.!;,a'~1, 1 : p :'iJ', :i'SI(.i rt ~,:i :R:IOUi 41p.
2) Risk Assessments (10 points). A Preliminary Project Schedule should be attached to the
BAR-Risk Assessment Plan (RAP).
3) Past performance based on number and quality of the Performance Evaluation Surveys (10
points).
3) 4ZPresentation and Interview of Key personnel (38- 20 points).
P#A~1=-1#4
4~ Bid Price (~9 50 points).
Scoring and ranking procedure:
When the T€CI~NIC-„h~R~€VI€W R!1•N€1= se
{ist~iddeFS~~ent+r~yatiera of Rfa
shall-be-
be••avaidated•-ancl seared at-the end of the-€~aluatiera-aresc3ss
tie-T€
DC\/ICIA/ DAAICI c. L,r.ll .,di+ .+II +F~roe DF,.,~e c~nr~roc• ~nrl
s~
rec~r~rraen~latieA tc•~tfae G+t~1~M~nagHr wk~isf~-i~ turn-#~e-wial~r~ic~
6er~a+~issiea-
T_he TCrunllr-el DC\/IC\n, DenlCl Panel will convene and will score and rank all responsive bidders
based on the above criteria The Panel's recommendation will be presented to the City Manager.
After considering the recommendation(s) of the Panel, the City Manager shall recommend to the
Mayor and City Commission the bid(s) that the City Manager deems to be in the best interest of the
City unless only one bid response is received, and/or the lowest and best bid exceeds the budgeted
amount allocated towards the construction cost of the project, then the City Manager, without anv
action by the Mavor and City Commission. has the authority. pursuant to Section 2-367 of the Miami
Beach City Code, to exercise anv of the following options:
~) Reject the bid and, if he determines that same is in the best interest of the City, re-advertise the
item for bidding; or
(2) Request that the Mavor and City Commission make additional funds available and proceed to
negotiate an agreement with the sole bidder; or
(3) Negotiate an agreement with the lowest and best bidder exceeding the budgeted amount of the
work. If the City Manager is unable to successfully negotiate an agreement with the lowest and best
bidder, the City Manager may terminate negotiations with such bidder and commence negotiations
with the second lowest and best bidder. If the City Manager is unable to successfully negotiate an
agreement with the second lowest and best bidder, the City Manager may terminate negotiations
with the second bidder and commence negotiations with the third lowest and best bidder.
The City Commission shall consider the City Manager's recommendation(s) and, may approve or
reject the Citv Manager's recommendation(s). In anv case, the Mavor and City Commission shall
select and authorize negotiations with the bidder(s) which the Mavor and Commission deem to be in
the best interest of the City. The City Commission may also reLect all bids received.
The selection or approval by the City Commission shall not constitute a binding contract between
the City and the selected or approved bidder(s). A binding contract will exist upon the completion of
successful negotiations as determined by the Administration, the City Attorney's Office form
approving the contract or contracts, and then the Mayor and._G~ Clerk signing the contracts after
the selected or approved bidder sLhUs_(or have} done so_Onl~ the executed contract(s) will be
binding on the contracting parties.
VVe are roc , r i;r..i tr,lr. ~urcirn•:1 E .c _I'.;m,_!blr cyr/ a ,r~ri,rrr~r;; rn irir whc.!:ce, wOr~, i)rr!laay ur ow ~ibr,m: n,rmn! r;isc:u, :.omrnur;ry,
Bidders are advised to acknowledge this Addendum on ITB document Page 138, "Acknowledgement
of Addenda", or the bid may be considered non-responsive.
CITY OF MIAMI BEACH
Gus Lopez, CPPO
Procurement Director
rm
F:\PU RC\$AL L1Roma n\bids107\ITB-28-O6-071itb-28-O6-07A 1.doc
.~
V1 F l!EF cGln; nitL?,7 1.:7 )r ~).iO.n•,] e. (~' •..r„ n, t.:i c SN!v~c.~ an<Y SoreN rc) 06 ~M1'~o sve. 1a~o+''.. oRCi Flrirr Irr o:n vrt!r~lnl. r!vNrca+, hiti/c;nC: C:om!Irun+ry.
00305. TECHNICAL REVIEW PANEL SELECTION CRITERIA /
SELECTION PROCESS
The Evaluation process to be used by the City for this bid will be one of "Best Value
Procurement", meaning that the City will, in addition to price, consider past performance
on previous contracts, Risk Assessment for this ITB, Qualifications of Personnel
proposed, and presentation and interview of Contractor's personnel. (See Section
00315)
The procedure to be used for bid evaluation and selection is as follows:
• Invitation to Bid issued.
• Pre-Bid Meeting.
• Receipt of bids.
• Opening and listing (except pricing) of all bids received.
• Review all bids for responsiveness.
• Distribution of all responsive bids to the Technical Review Panel.
The TECHNICAL REVIEW PANEL (the "Panel") will rank all responsive bidders and will
provide their recommended ranking to the City Manager. The evaluation and scoring
process to determine the ranking of bidders will be as follows
1) Qualifications and Experience of Contractor's Team (10 points)
2) Risk Assessments (10 points). A Preliminary Project Schedule should be
attached to the Risk Assessment Plan (RAP).
3) Past performance based on number and quality of the Performance Evaluation
Surveys (10 points).
4) Presentation and Interview of Key personnel (20 points).
5) Bid Price (50 points).
Scoring and ranking procedure:
The Panel will convene and will score and rank all responsive bidders based on the
above criteria. The Panel's recommendation will be presented to the City Manager.
After considering the recommendation(s) of the Panel, the City Manager shall
recommend to the Mayor and City Commission the bid(s) that the City Manager deems
to be in the best interest of the City, unless only one bid response is received, and/or
the lowest and best bid exceeds the budgeted amount allocated towards the
construction cost of the project, then the City Manager, without any action by the Mayor
and City Commission, has the authority, pursuant to Section 2-367 of the Miami Beach
City Code, to exercise any of the following options:
(1) Reject the bid and, if he determines that same is in the best interest of the City, re-
advertise the item for bidding; or
(2) Request that the Mayor and City Commission make additional funds available and
proceed to negotiate an agreement with the sole bidder; or
(ITB-28-06/07
C1TY dF MIAMI BEACH Amended Pale ZS,
IS Addendum I)
(3) Negotiate an agreement with the lowest and best bidder exceeding the budgeted
amount of the work. If the City Manager is unable to successfully negotiate an
agreement with the lowest and best bidder, the City Manager may terminate
negotiations with such bidder and commence negotiations with the second lowest and
best bidder. If the City Manager is unable to successfully negotiate an agreement with
the second lowest and best bidder, the City Manager may terminate negotiations with
the second bidder and commence negotiations with the third lowest and best bidder.
The City Commission shall consider the City Manager's recommendation(s) and, may
approve or reject the City Manager's recommendation(s). In any case, the Mayor and
City Commission shall select and authorize negotiations with the bidder(s) which the
Mayor and Commission deem to be in the best interest of the City. The City
Commission may also reject all bids received.
The selection or approval by the City Commission shall not constitute a binding
contract between the City and the selected or approved bidder(s). A binding
contract will exist upon the completion of successful negotiations as determined by the
Administration, the City Attorney's Office form approving the contract or contracts, and
then the Mayor and City Clerk signing the contract(s) after the selected or approved
bidder(s) has (or .have) done so. Only the executed contract(s) will be binding on the
contracting parties. -
lITR-28-06/07
CITY OF MIAMI BEACH Added Page 28-b,
28-b Addendum I)
00600. CONTRACT
CONTRACT
THIS IS A CONTRACT, by and between the City of Miami Beach, a political
subdivision of the State of Florida, hereinafter referred to as CITY, and
hereinafter referred to as CONTRACTOR.
W I T N E S S E T H, that CONTRACTOR and CITY, for the considerations
hereinafter named, agree as follows:
ARTICLE 1
SCOPE OF WORK
CONTRACTOR hereby agrees to furnish all, unless specifically stated otherwise, labor,
materials, equipment, supervision, mobilization, demobilization, survey, services and
incidentals necessary to perform and complete the work to the full intent as shown or
indicated in/on the Contract Documents and related thereto for the Project.
ARTICLE 2
CONTRACT TIME
2.1 CONTRACTOR shall be instructed to commence the Work by written instructions
in the form of a Standing Order issued by the City's Procurement Director and a
Notice to Proceed issued by the Contract Administrator. Two (2) Notices to
Proceed will be issued for this Contract. CONTRACTOR shall commence
scheduling activities, permit applications and .other preconstruction work within
five (5) calendar days after the Project Initiation Date, which shall be the same as
the date of the first Notice to Proceed. The first Notice to Proceed and Purchase
Order will not be issued until CONTRACTOR's submission to CITY of all required
documents (including but limited to: Payment and Performance Bonds, and
Insurance Certificate) and after execution of the Contract by both parties.
2.1.1. The receipt of all necessary permits by CONTRACTOR and acceptance
of the schedule duration as stated herein and acceptance and approval
of CONTRACTOR'S List of Deliverables, Project Schedule, Mobilization
Plan, Safety 8 Health Manual, Quality Control Manual, Risk
Management Plan, Schedule of Values, and .attendance at the Pre-
Construction Conference to review general administrative requirements;
and to review in detail the Scope of Work and CONTRACTOR'S "Base
Line" Project Schedule is a condition precedent to the issuance of the
Second Notice to Proceed to mobilize on the Project Site and commence
with the physical construction of the Work.
(1T6-28-06/07
BIll NO: 28-06/U7 CITY OF MIAMI BEACH Amended Page 65,
UATF,: U3/13/U7 65 Addendum I)
Table Of Contents
Section One
Identification Page
Declaration: Nondiscrimination in Contracts and Benefits
Reasonable Measures Application
Section Two
Bid/Tender Forms
Bid Bond
Supplement to Bid/Tender Forms
Section Three
Insurance
Statement of Compliance
Permits/Licenses
Section Four
Representative Projects
Organizational Chart
Staffing Plan
Section Five
Aclmowledgement of Addenda
Addendums 1 & 2
Subcontractors Listing Information
SECTION
ONE
• Identification Page
• Declaration: Nondiscrimination in
Contracts & Benefits
• Reasonable Mearsures Application
3855 Commerce Parkway
Miramar, Florida 33025
Ph:(954)447-2800/(305)944-3922
Fx: (954) 447-6768/ (305) 944-4406
Randy@ S oloConstructi on. com
Federal ID#: 59-182-9536
Solo Construction Corporation was founded in April 19, 1978. We handle
site and development construction.
j
_.' '1.
ignature Of Officer) (Date)
°° _ ~ ~ _~
~) ,
rinted Name)
~~~
1 j 1---
(Title)
SECTION
TWO
• Bid/Tender Forms
• Bid Bond
• Supplement to Bid/Tender Forms
SECTION
THREE
• Insurance
• Statement of Compliance
• Permits/Licenses
Sign in Sheet
Invitation to Bid (ITBJ 28-06/07
April 16, 2007
MULTIPURPOSE MUNICIPAL PARKING GARAGE
BID PACKAGE Ol
UNDERGROUND UTILITIES
Name
(Please Print)
Company
Phone #
Time
JJ ~1 o CU~c'r1c.~~ ..
~C>Vt S i t2~.~. i`~'0%1
.~-,
. %
---...,
`i
~/~ ~ ~ ~~ -
f f~
~~ sue:
~:~
SECTION
FOUR
• Representative Projects
• Organizational Chart
• Staffing Plan
~ ~
~
~ ~ w
0
O
~ ~
~./
.~
~
y
a p
~
~ a O ~
~ ~
O ~ ~
_
~ ,tio ~~
N ~~
~ ,~ ~
~
' ~ ~a
~ .
~,
~, c o
~ a, .~ w ,~
A ~
~ Q
~ ,
0
O
.
~ ~ ~~
o ~o ~~
~ ~~ ~~
~ ~~ ~
o ~~
L 'O ~o
~
; 0
QI ~ ~
.
ti ~
~
F,+-~ ~ '.~
O
•~
V
~
c
~~ i.
~ bD`'
~yy
~ 0
ir1 Q
0 ~
5
'
+~ ~
~ ~
O ,g, q
~ w
STAFF PLAN
Construction Project Manager :Julio Cuenca
Extensive experience in construction and a broad background in all aspects of the
management process.
The above functions are one of the critical responsibilities:
Primary contact with city
Organize and plan the Job
Buy out project (issue subcontracts and purchase orders)
Submittals and transmittals
Maintain change request log and control changes
Formal- correspondence with owner and A/E
Make or enforce required decisions to assure that major objectives aze met.
Assist Superintendent to attain job goals.
Conduct regulaz progress meetings with owner /architect
Conduct pre construction conference
Prepare breakdowns for payment and payment request
Conduct inspections as required by the quality control program
Construction Superintendent :Ricky Pierson
Assist Project Manager as required
Organize and plan job with Project manager in a daily bases
Organize, Schedule and direct personnel and subcontractors
Review cost and progress weekly
Monitoring of MOT plan
Ensure Testing coordination.
Coordinate and maintain equipment
Field procurement
Respond to Reports
Support the Quality control program
Enforce all safety rules and procedures
Secure site and closeout site each work day
Site Foreman : Delroy Ricketts
Water Main, Storm Drainage, Sanitary Sewer piping and installation of
structures Foreman
Foreman :James Felix
Clearing ,Demolitions, Removal of Asphalt ,Road base Foreman
James Felix
Vladimir Chomiak:
Survey ,Verified Locations of existing utilities, Construction Lay Out
and As built record Certified Survey
Derron Pierson:
Equipment Operations and Maintenance Manager
Subcontractors
Cast in Place Concrete Work, Curb & Gutter, Valley. Gutter, Sidewalk
and Protection Concrete Slab on Box Culvert .Sub Contractor
Homestead Paving ,contact Dominic Gonzalves
Restoration of Asphalt ,Milling, Asphalt Base Course Sub Contractor
General Asphalt, contact Albert Lopez
Drainage Well Drilling Sub Contractor : Jeffers Well Drilling
Temporary and Permanent Striping and Signing Sub Contractor :
Robert's Traffic ,contact Lisa Birchfield
Electrical work Sub Contractor: Atlas corp.
Engineering ,Shoring protection design and Monitoring Sheet piling
driving vibration Sub Contractor : Ebsary Foundation
S O ~ O Go~strz~ctGon Go oratGo~Z
3855 Commerce Parkway Miramar, Florida 33025 Phone: (954) 447-2800 Fax: (954) 447-6768
STATE SCHOOL QQ1 K-8 FACILITY
Address: 3030 NE 1515. North Miami, FL 33181
Awarded Contract Alnount: $208,000 Final Contract Amount: $276,000
Status: C01~4PLETED 12/31/05
....--
`~
~~ r r:~ ~
PHOTO COURTESY OF SOLO CONSTRUCTION CURYORATION
Brief Description
Installation of waterline.
Team Members
Owner: The School Board of Miami-Dade County
Address: 1450 NE 2nd. Avenue Miami, Fl 33025
PH/FX: (305) 995-1000/
General Contractor: F&L Construction, Inc
Sub Contractor: SOLO Construction Corporation
Architect/Engineer: Brown +Brown Architects /ADA Engineering
Storm drainage systems
~- ~ Class 5 drainage wells
LJ Sanitary sewer systems
~aYPotable water systems
[-~i High voltage electrical distribution
Contact Name: Julio Batista
Superintendent :Ricky Pierson
Project Manager: Ricky Pierson
Telephone and data distribution
Reinforced concrete load distribution
C' Other: List as may apply
S O ~ ~ GonstructGon Go ol"atGoyL
3855 Commerce Parkway Miramar, Florida 33025 Phone: (954) 447-2800 Fax: (954) 447-6768
NARANTA LAKES REDEVELOPMENT PROTECT
Project Address: SW 140TH Ave & SW 272~dSt Naranja, Florida
Awarded Contract Amount: $3,787,732.00 Final Contract Amount: $4,228,598.22
Status: One Phase Completed 12/31/06
Brief Description
After the destruction of this neighborhood in 1992 by Hurricane Andrew, Miami Dade County created a
Conununity Reinvestment Act (CRA) to rebuild this devastated Community. SOLO Construction Corporation
was the successful bidder to provide site clearing, earthwork, water, sewer, and drainage constriction, new
roadways, and bridges in an effort to rebuild this community this project is on going.
Team Members
Owner: Naranja Lakes Construction LLC Contact Name: Scott I-Iedge
Address: 14600 SW 136 Street Miami, Florida 33186
PH/FX: (305)259-3100/(305)259-3200
General Contractor: SOLO Constn.ution Corporation Superintendent: Delroy Rickets
Architect/Engineer: Ford Engineers Inc. Project Manager: Julio Cuenca
f-r Storm drainage systems
Class 5 drainage wells
I~ Sanitary sewer systems
r~'Potable water systems
i _! High ~~oltage electrical distribution
O Telephone and data distribution
Reinforced concrete load distribution
C Other: List as may apply
7, r
SO LO ~ t~~ o~~t~
3855 Commerce Parkway Miramar, Florida 33025 Phone: (954) 447-2800 Fax: (954) 447-6768
CITY OF SWEETWATER STORM WATER IMPROVEMENTS
Project Address: SW 102nd Place & SW 5~ Street
Awarded Contract Amount: $2,1.42,764.00
Status: COMPLETED 7/1/04
Final Contract Amount: $2,511,520.00
Brief Descri tp ion
Site demolition, installation of several pump stations, stormceptor, drainage and sewage, relocation of existing
water main at various locations throughout the City of Sweetwater
Team Members
Owner: The City of Sweetwater
Address: 500 SW 109TH Avenue Sweetwater, FL 33174
PH/FX: (305)221-0411/(305)221-?_541
General Contractor: SOLO Construction Corporation
Architect/Engineer: Craig A. Smith Associates
1000 W McNabb Rd
Pompano Bch, F133069
(954)782-8222
~~r~Storm drainage systems
C Class 5 drainage wells
Sanitary sewer systems
C__; Potable water systems
~ High voltage electrical distribution
Contact Name: Joe Jeffries
Superintendent: Keith Leslie
Project Manager: Stanley Bateman
Li Telephone and data distribution
i l Reinforced concrete load distribution
i-1 Other: List as may apply
JULIO CUENCA
773 NW 136' Ave., Miami FL 33182
Cell. (786) 402-0601 Home (305) 227-8013
juliocuenca~ho tm ail. com
PROJECT MANAGER
CONSTRUCTION MANAGER/ FIELD SUPERVISOR
QUALIFICATIONS PROFILE
Multi cultural, dynamic and goal driven engineer with 20 years of combined experience in the General
Contracting, Construction Management and Supervision fields. Proven ability to complete projects
safely, within budget, and on time. Excellent leadership, supervisory, and Scheduling skills,
Dedicated, hard working professional. Projected to complete Florida General Contractor Construction
License
Including but not limited to the participation and Raising of National and International Highway,
Vertical, Commercial, Industrial and Transportation Infrastructure contracting within the
Construction and Civil Engineering Industry.
PROFESSIONAL EXPERIENCE
2006- Present SOLO CONSTRUCTION CORPORATION
Miramar ,Florida ,USA
Naranja Lakes Redevelopment Project
Project Manager
Site clearing, earth work, water, sewer, and drainage construction, new road
ways, and bridges, phase lA is completed and Phase 1B is on going .
2004 - 2006 SOLO CONSTRUCTION' CORPORATION
Miramaz, Florida ,USA
Miami International Airport Midfield Phase III C
Project Manager
Demolition and Removal of existing facilities including Incinerator, Wash
Rack, Electrical Vault ,Fire Station ,Luggage Miscellaneous Buildings.
Demolition and Removal of Existing utilities including: Pipe /culvert,
Drainage structures ,concrete encased ducts ,Taxiways and Shoulder
Pavement .
Construction of Approximate 2,500 feet new Taxiway "Y"; 2,300 feet new
Taxiway "W" , 750 Feet new Taxiway "Yl" and 780 fee Taxiway "Y2" .
Including Earth Work , 22" Stabilised Sub grade , 22" Lime-rock base course
5" Bituminous Pavement, paving marking, signage and Bi-directional
green-green Taxiway centerline and elevated base mounted Taxiway edge
Rght system .
Construction of new High Speed Runway exit on existing Runways 12-30
and 8R-26L including Spiral Uni-directional ,Center light system elevated
and flush Base mounted Runway edge light
JULIO CUENCA
773 NW 136a' Ave., Miami FL 33182
Cell. (786) 402-0601 Home (305) 227-8013
juliocuenca®hotmail.com
2002 - 2004 CONSOLIDATED CONTRACTORS COMPANY (KUWATTT) W.L.L.
Savannah Forest Station, Stann Creek, Belize, C.A
Belize Southern Highway
Construction Manager
Review and assess project plans and specifications to ensure regulatory
compliance, concerning earthwork ,concrete, pavement ,drainage system
and workforce safety issues.
Prepare progress reports for management review reflecting labor, material,
machinery ,and equipment requirements; track and control construction
costs to avoid budget overruns.
Interface on site and in weekly meetings whit contractors, engineers,
inspectors ,and environmental energy specialist to review project status.
Direct in excess of 50 crews members in areas of scheduling, delegation,
supervision, pay certifications ,and performance evaluation from project
inspection to completion.
2000 - 2002 CONSTRUMUNDO GENERAL CONTRACTORS
San Salvador, El Salvador, C.A
Project Coordinator
1989 - 2000 EDISAL GENERAL CONTRACTORS
San Salvador, El Salvador C.A.
Project Manager /Assistant Project Manager
1987-1988 FRED McGILVARY INC.
Miami, Florida
Estimator Engineer
EDUCATION AND PROFESSIONAL TRAINING
UCA UNIVERSITY
School of Civil Engineering
San Salvador, El Salvador
"Construction Cost"
Sponsored by Mexican Society of Engineers (SMIEL)
"Harvard Project Manager" - CPM Standards, Pert and Fast Track
"Highways and Bridge Construction Concepts".
Sponsored by World Highways Institute
"Construction High Productivity"
Sponsored by Japanese Intema*~onal Cooperation Agency (JICA)
~ur~ro cuEivcA
773 NW 136 Ave., Miami FL 33182
Cell. (786) 402-0601 Home (305) 227-8013
juliocuenca®hotmail.com
OTHER SKILLS
• Experience in export and import operations
• Knowledge and experience of heavy equipment maintenance
• Quality control Management
• Operation of crusher plants and the production of aggregates for concrete and hot mix
asphalt.
• Erection and setting up of metallic structure.
• Knowledge and operation of utility computer programs including Microsoft Excel, Lotus
Smart Suite, Microsoft Word, Quattro pro, Harvard Project Manager, Time Line, Auto Cad
• Fluent in written and spoken English and Spanish
• Computer Literate
ACHIEVMENTS:
- QC / QA experience in Hot Mix Asphalt.
- US ARMY CORPS OF ENGINEERS spec's management experience.
- BSN British Standards and ISO-9002 Contracting experience.
- MIA Airside Operation Area driving Certification
PERSONAL: Married, US Citizen, Bilingual English-Spanish
Bom 6/18/64
REFERENCES: Upon Request
RICKY PIERSON
3855 Commerce Pkwy
Miramar, FL 33025
Telephone: (305) 944-3922
EMPLOYMENT Solo Construction Corporation
Vice President
1994-Present.
• Responsible for field operations which includes
Managing project managers, supervisors and foremen.
• Ensure all personnel, equipment and scheduling needs are met on a
daily basis.
• Supervision of safety inspections and provision of guidance to
ensure safety codes and procedures are adhered to.
• Responsible for monitoring project construction to ensure quality
and compliance.
• Direct administration of company payroll operations
Proiect Manager
1990-1993
• Negotiated contracts with vendors and subcontractors.
• Conducted inspections at work sites to verity adherence to
governmental regulations, ensuring successful completion of
quality control inspections.
• Monitored vendors and subcontractors billing, as well as project
time lines ensuring conformance with schedule deadlines.
• Communicated with owners to resolve-to-resolve outstanding
issues related to projects.
RICKY PIERSON
EDUCATION
Florida International University
• Business Management
Miami Dade Community College
• Clearing Grubbing license Computer skills
SECTION
FIVE
• Acknowledgement of Addenda
• Addendums 1 & 2
• Subcontractors Listing Information
~ MIAMIBEACH
City of Miami Beach, 1700 Convention Center Drive, Miomi Beoch, Florida 33139, www.m~omibeachfl.gov
PROCUREMENT Division
Tel: 305-673-7490, fox: 305-673.7851
INVITATION TO BID (ITB) NO. 28-06/07
ADDENDUM NO. 2
April 11, 2007
FOR MULTIPURPOSE MUNICIPAL PARKING FACILITY BID PACKAGE 01 UNDERGROUND
UTILITIES is amended as follows:
THIS ADDENDUM tS A DUPLICATE OF ADDENDUM 1, only the weictht on the selection criteria
has been amended. No on-line bid submittals will be accepted. only hard copy paper bids to
be delivered to the Citv of Miami Beach Procurement Division.
I. The following are answers to questions from prospective bidders.
Q. Will any of the excavated materials be reusable?
A. Please refer to the Technical Specifications section 02315.
Q. Is builder's risk insurance necessary for this project considering there is no building
involved?
A. Yes, Builder's Risk Insurance is a requirement. There are adjacent structures that may
be affected and for this reason Builder's Risk Insurance is required.
Q. Does the City have a scheduled date for Interviews from bidders in reference to this bid?
A. The Technical Review Panel will meet during the week of April 16-20 and will invite
those bidders who are deemed responsive to the bid requirements. Bidders are
requested that they have their key personnel available for interviews on the week of
April 16-20. The key personnel include the following positions:
1) Construction Project Manager
2) Construction Superintendent
Q. Sheet 65 of the bid document states "This contract is by and between the City of Miami
Beach and Ebsary Foundation, Inc." Please provide corrected sheet.
A. Attached to this Addendum is corrected page 65 to be replaced in the bid document.
II. Attached are Amended pages 28 and added page 28-b to be replaced in the bid document.
Amendments are as follows:
The words that have been strikethrough are deleted, and the words underlined are being added
The TECHNICAL REVIEW PANEL• (the "Panel") will rank all responsive bidders and will provide
their recommended ranking to the City Manager. pf}ases'-~--'The
evaluation and scoring process to determine the rankin4 of bidders aft-t#~ey-afe will be as
follows:
1) Qualifications and Experience of Contractor's Team (~15 points)
.~1'i-./'f' ..t. ill. iitif .l ~. :l~J-: i.i Fes(.-~ .. ..:I7!•~ ...i i1 t1 ... 1.'ri~ (. l/.i ~.l-~(.! .:( lM1'(.~Ir , i.. ~~ ~ (
. ~. l..i ... _., i): i(1 (- -"1. .. i'1 (. :.+(.1: - 1, ;..
. I .` il.ii l.. 1'i/I:~i lily'.
2) Risk Assessments (10 points). A Preliminary Project Schedule should be attached to the
RAR-Risk Assessment Plan (RAP).
3) Past performance based on number and quality of the Performance Evaluation Surveys (5
points).
3) 4LPresentation and Interview of Key personnel (3(3- 20 points).
€-~
4~ 51Bid Price (~A 50 points).
Scoring and ranking procedure:
#er-R-base-t-At-t#~e
The T~~u""~'A' ~C\/IC1A/ ~A"ICI panel will. convene and will score and rank all responsive bidders
based on the above criteria The Panel's recommendation will be presented to the City Manager.
After considering the recommendation(s) of the Panel, the City Manager shall recommend to the
Manor and City Commission the bid(s) that the City Manager deems to be in the best interest of the
City unless only one bid response is received, and/or the lowest and best bid exceeds the budgeted
amount allocated towards the construction cost of the project. then the City Manager, without anv
action by the Manor and City Commission. has the authority, pursuant to Section 2-367 of the Miami
Beach Citv Code. to exercise anv of the following options:
(1) Reject the bid and. if he determines that same is in the best interest of the City. re-advertise the
item for bidding; or
(2) Request that the Manor and Citv Commission make additional funds available and proceed to
negotiate an agreement with the sole bidder; or
(3) Negotiate an agreement with the lowest and best bidder exceeding the budgeted amount of the
work. If the Citv Manager is unable to successfully negotiate an agreement with the lowest and best
bidder, the City Manager may terminate negotiations with such bidder and commence negotiations
with the second lowest and best bidder. If the Citv Manager is unable to successfully negotiate an
agreement with the second lowest and best bidder. the Citv Manager may terminate negotiations
with the second bidder and commence negotiations with the third lowest and best bidder.
The City Commission shall consider the City Manager's recommendation(s) and, may approve or
reiect the City Manager's recommendation(s). In any case. the Manor and City Commission shall
select and authorize negotiations with the bidder(s) which the Manor and Commission deem to be in
the best interest of the Citv. The City Commission may also reiect all bids received.
The selection or approval by the Citv Commission shall not constitute a binding contract between
the City and the selected or approved bidder(s). A binding contract will exist upon the completion of
successful negotiations as determined by the Administration, the City Attorney's Office form
approving the contract or contracts, and then the Mayor and Citv Clerk signing the contract(s) after
the selected or approved bidder(s) has (or have done so. Onl~the executed contracts wilt be
bindin4 on the contracting parties.
~'Ve i)If+ ,-(:•!1:!!111,-+., f-, 1.'~)r: 1111!) FY(:.~:1...1 ,.. 1)t!!' )E,"i•i'F !71 (7 ,;~1F!!'r• tU Ull :1'f!() i'Y('. .~'(•r.:' (7 .1 (7h:'y' :I ();il \'!~) .7111 1!!1~1:i !11 r..~...ll~'. '. ()!I.II'!i!11111
Bidders are advised to acknowledge this Addendum on ITB document Page 138, "Acknowledgement
of Addenda", or the bid may be considered non-responsive.
CITY OF MIAMI BEACH
Gus Lopez, CPPO
Procurement Director
rm
F:\PURC\aALl.lRoman\bids\07\1T8-28-06-071i1b-28-06-07A2.doc
tb`r..;:r. r.. r. ~,;r~;, r , l;..m ,ui, .::•c= :., . ~ ,.:.: i.' ....,,.. ,mgr sarrr,: ,u r,,; ~rnu r.o-r, r. or. ~ •,~ ~;n:~ u+ v{,r v.(. •~nr, nc:~.ut.ur, ,rslc?~ic c:omrnurriN.
00305. TECHNICAL REVIEW PANEL SELECTION CRITERIA /
SELECTION PROCESS
The Evaluation process to be used by the City for this bid will be one of "Best Value
Procurement", meaning that the City will, in addition to price, consider past performance
on previous contracts, Risk Assessment for this ITB, Qualifications of Personnel
proposed, and presentation and interview of Contractor's personnel. (See Section
00315)
The procedure to be used for bid evaluation and selection is as follows:
• Invitation to Bid issued.
• Pre-Bid Meeting.
• Receipt of bids.
• Opening and listing (except pricing) of all bids received.
• Review all bids for responsiveness.
• Distribution of all responsive bids to the Technical Review Panel.
The TECHNICAL REVIEW PANEL (the "Panel") will rank all responsive bidders and will
provide their recommended ranking to the City Manager. The evaluation and scoring
process to determine the ranking of bidders will be as follows
1) Qualifications and Experience of Contractor's Team (15 points)
2) Risk Assessments (10 points). A Preliminary Project Schedule should 6e
attached to the Risk Assessment Plan (RAP).
3) Past performance based on number and quality of the Performance Evaluation
Surveys (5 points).
4) Presentation and Interview of Key personnel (20 points).
5) Bid Price (50 points).
Scoring and ranking_procedure:
The Panel will convene and will score and rank all responsive bidders based on the
above criteria. The Panel's recommendation will be presented to the City Manager.
After considering the recommendation(s) of the Panel, the City Manager shall
recommend to the Mayor and City Commission the bid(s) that the City Manager deems
to be in the best interest of the City, unless only one bid response is received, and/or
the lowest and best bid exceeds the budgeted amount allocated towards the
construction cost of the project, then the City Manager, without any action by the Mayor
and City Commission, has the authority, pursuant to Section 2-367 of the Miami Beach
City Code, to exercise any of the following options:
(1) Reject the bid and, if he determines that same is in the best interest of the City, re-
advertise the item for bidding; or
(2) Request that the Mayor and City Commission make additional funds available and
proceed to negotiate an agreement with the sole bidder; or
~ITB-28-06/07
CITY OF N11AA41 BEACH Amended Page 28,
28 Addendum 2)
(3) Negotiate an agreement with the lowest and best bidder exceeding the budgeted
amount of the work. If the City Manager is unable to successfully negotiate an
agreement with the lowest and best bidder, the City Manager may terminate
negotiations with such bidder and commence negotiations with the second lowest and
best bidder. If the City Manager is unable to successfully negotiate an agreement with
the second lowest and best bidder, the City Manager may terminate negotiations with
the second bidder and commence negotiations with the third lowest and best bidder.
The City Commission shall consider the City Manager's recommendation(s) and, may
approve or reject the City Manager's recommendation(s). In any case, the Mayor and
City Commission shall select and authorize negotiations with the bidder(s) which the
Mayor and Commission deem to be in the best interest of the City. The City
Commission may also reject all bids received.
The selection or approval by the City Commission shall not constitute a binding
contract between the City and the selected or approved bidder(s). A binding
contract will exist upon the completion of successful negotiations as determined by the
Administration, the City Attorney's Office form approving the contract or contracts, and
then the Mayor and City Clerk signing the contract(s) after the selected or approved
bidder(s) has (or have) done so. Only the executed contract(s) will be binding on the
contracting parties.
(iTB-2R-06/07
CITY' OF M1AM1 BEACH Added Pale 2R-b,
2R-b .4ddcndum 2)
00600. CONTRACT
CONTRACT
THIS IS A CONTRACT, by and between the City of Miami Beach, a political
subdivision of the State of Florida, hereinafter referred to as CITY, and
hereinafter referred to as CONTRACTOR.
W I T N E S S E T H, that CONTRACTOR and CITY, for the considerations
hereinafter named, agree as follows:
ARTICLE 1
SCOPE OF WORK
CONTRACTOR hereby agrees to furnish all, unless specifically stated otherwise, labor,
materials, equipment, supervision, mobilization, demobilization, survey, services and
incidentals necessary to perform and complete the work to the full intent as shown or
indicated in/on the Contract Documents and related thereto for the Project.
ARTICLE 2
CONTRACT TIME
2.1 CONTRACTOR shall be instructed to commence the Work by written instructions
in the form of a Standing Order issued by the City's Procurement Director and a
Notice to Proceed issued by the Contract Administrator. Two (2) Notices to
Proceed will be issued for this Contract. CONTRACTOR shall commence
scheduling activities, permit applications and other preconstruction work within
five (5) calendar days after the Project Initiation Date, which shall be the same as
the date of the first Notice to Proceed. The first Notice to Proceed and Purchase
Order will not be issued until CONTRACTOR's submission to CITY of all required
documents (including but limited to: Payment and Performance Bonds, and
Insurance Certificate) and after execution of the Contract by both parties.
2.1.1. The receipt of all necessary permits by CONTRACTOR and acceptance
of the schedule duration as stated herein and acceptance and approval
of CONTRACTOR'S List of Deliverables, Project Schedule, Mobilization
Plan, Safety 8 Health Manual, Quality Control Manual, Risk
Management Plan, Schedule of Values, and attendance at the Pre-
Construction Conference to review general administrative requirements;
and to review in detail the Scope of Work and CONTRACTOR'S "Base
Line" Project Schedule is a condition precedent to the issuance of the
Second Notice to Proceed to mobilize on the Project Site and commence
with the physical construction of the Work.
~rrB-iB-ob/o~
BID NO: 18-06/07 CITY OF MIAMI BEACH Amended Page 65,
DA"1'E: U3/13/U7 65 Addendum 2j
m MIAMBEACH
City of Miami Beach, 1700 Convention Center Drive, Miomi Beach, Florida 33139, www.miomibeochFl.gov
PROCUREMENT Division
Tel: 305.673.7490, Faz: 305-673.7851
INVITATION TO BID (ITB) NO. 28-06/07
ADDENDUM NO. 1
April 10, 2007
FOR MULTIPURPOSE MUNICIPAL PARKING FACILITY BID PACKAGE 01 UNDERGROUND
UTILITIES is amended as follows:
I. The following are answers to questions from prospective bidders.
Q. Will any of the excavated materials be reusable?
A. Please refer to the Technical Specifications section 02315.
Q. Is builder's risk insurance necessary for this project considering there is no building
involved?
A. Yes, Builder's Risk Insurance is a requirement. There are adjacent structures that may
be affected and for this reason Builder's Risk Insurance is required.
Q. Does the City have a scheduled date for Interviews from bidders in reference to this bid?
A. The Technical Review Panel will meet during the week of April 16-20 and will invite
those bidders who are deemed responsive to the bid requirements. Bidders are
requested that they have their key personnel available for interviews on the week of
April 16-20. The key personnel include the following positions:
1) Construction Project Manager
2) Construction Superintendent
Q. Sheet 65 of the bid document states "This contract is by and between the City of Miami
Beach and Ebsary Foundation, Inc." Please provide corrected sheet.
A. Attached to this Addendum is corrected page 65 to be replaced in the bid document.
II. Attached are Amended pages 28 and added page 28-b to be replaced in the bid document.
Amendments are as follows:
The words that have been strikethrough are deleted, and the words underlined are being added
The TECHNICAL REVIEW PANEL (the "Panel")will rank all responsive bidders and will provide
their recommended ranking to the City Manager. The
evaluation and scoring process to determine the ranking of bidders aed-1#ey-ire will be as
follows:
R-~
1) Qualifications and Experience of Contractor's Team (>29-10~oints)
fi'r' ,7:E .. '...1 Ilrf.•=~I I.J •:li:•. 11 •, f'~(-•.~.1 .1 ,I.f, •:. l.!r li !' ill,l7 -i~1rr ~ (() 111 '.171(1 iiY .•. (.•I K, I.:il (l.l) I!I (/tli llE~ ). 1 1' ~ r I
2) Risk Assessments (10 points). A Preliminary Project Schedule should be attached to the
RARRisk Assessment Plan (RAP).
3) Past performance based on number and quality of the Performance Evaluation Surveys (10
points).
~) 41Presentation and Interview of Key personnel (~9- 20 points).
R#A'S€-Iff
4-) 51Bid Price (~A 50 points).
Scoring and ranking procedure:
The T~ru~~i~ei ~c~i~~~ni oe~ici panel will convene and will score and rank all responsive bidders
based on the above criteria. The Panel's recommendation will be presented to the City Manager.
After considering the recommendation(s) of the Panel. the City Manager shall recommend to the
Manor and Citv Commission the bid(s) that the Citv Manager deems to be in the best interest of the
City. unless only one bid response is received, and/or the lowest and best bid exceeds the budgeted
amount allocated towards the construction cost of the project, then the Citv Manager, without anv
action by the Manor and City Commission, has the authority. pursuant to Section 2-367 of the Miami
Beach City Code, to exercise anv of the following options:
(1) Reject the bid and, if he determines that same is in the best interest of the City, re-advertise the
item for bidding; or
(2) Request that the Manor and City Commission make additional funds available and proceed to
negotiate an agreement with the sole bidder: or
L3) Negotiate an agreement with the lowest and best bidder exceeding the budgeted amount of the
work. If the City Manager is unable to successfully negotiate an agreement with the lowest and best
bidder. the Citv Manager may terminate negotiations with such bidder and commence negotiations
with the second lowest and best bidder If the Citv Manager is unable to successfully negotiate an
agreement with the second lowest and best bidder the Citv Manager may terminate negotiations
with the second bidder and commence negotiations with the third lowest and best bidder.
The Citv Commission shall consider the City Manager's recommendation(s) and may approve or
reject the Citv Manager's recommendation(s). In anv case. the Manor and Citv Commission shall
select and authorize negotiations with the bidder(s) which the Manor and Commission deem to be in
the best interest of the City. The Citv Commission may also reLect all bids received.
The selection or approval by the City Commission shall not constitute a binding contract between
the City and the selected or approved bidder(s) A binding contract will exist upon the completion of
successful negotiations as determined by the Administration, the City Attorney's Office form
approving the contract or contracts. and then the Mayor and City Clerk signin the contract s after
the selected or approved bidder(sLhos ~ have --done sow Only the -executed cost; acts will be
binding on the contracting parties.
L'1~e i)!F r'pr n.'niriP,i r:. (1'•1o-i~fin) ~%tC 9! .II [,~..3r4' ci!Nl['r' rl. ,1 .iJ .t W,• !f) 07; »'h(.. 'rvP v: C•N• ilNrf 1=1;;y' ui f)Ur vrf)~'.- rr' !r ~: Di/r) ,;Sd:,nr ,-t; mlrlur"ry
Bidders are advised to acknowledge this Addendum on ITB document Page 138, "Acknowledgement
of Addenda", or the bid may be considered non-responsive.
CITY OF MIAMI BEACH
Gus Lopez, CPPO
Procurement Director
rm
F:\PURC\$ALL\Roma n\bids\07\ITB-28-06-07\itb-28-06-07A 1.doc
VVe cs:r ro~:uni7~~i I•) fr;;•.: lm ~ NcaL~i.. /. i.4c. ~!vicr ;iniY soieR• h~ oli .vnc', iive. ,+orr. onci F:a,y n, o„r viLrml 1rt:~/Jita:)i, h~ak.~ur. conununrry.
00305. TECHNICAL REVIEW PANEL SELECTION, CRITERIA /
SELECTION PROCESS
The Evaluation process to be used by the City for this bid will be one of "Best Value
Procurement", meaning that the City will, in addition to price, consider past performance
on previous contracts, Risk Assessment for this ITB, Qualifications of Personnel
proposed, and presentation and interview of Contractor's personnel. (See Section
00315)
The procedure to be used for bid evaluation and selection is as follows:
• Invitation to Bid issued.
• Pre-Bid Meeting.
• Receipt of bids.
• Opening and listing (except pricing) of all bids received.
• Review all bids for responsiveness.
• Distribution of all responsive bids to the Technical Review Panel.
The TECHNICAL REVIEW PANEL (the "Panel") will rank all responsive bidders and will
provide their recommended ranking to the City Manager. The evaluation and scoring
process to determine the ranking of bidders will be as follows
1) Qualifications and Experience of Contractor's Team (10 points)
2) Risk Assessments (10 points). A Preliminary Project Schedule should be
attached to the Risk Assessment Plan (RAP).
3) Past performance based on number and quality of the Performance Evaluation
Surveys (10 points).
4) Presentation and Interview of Key personnel (20 points).
5) Bid Price (50 points).
Scoring and ranking_procedure:
The Panel will convene and will score and rank all responsive bidders based on the
above criteria. The Panel's recommendation will be presented to the City Manager.
After considering the recommendation(s) of the Panel, the City Manager shall
recommend to the Mayor and City Commission the bid(s) that the City Manager deems
to be in the best interest of the City, unless only one bid response is received, and/or
the lowest and best bid exceeds the budgeted amount allocated towards the
construction cost of the project, then the City Manager, without any action by the Mayor
and City Commission, has the authority, pursuant to Section 2-367 of the Miami Beach
City Code, to exercise any of the following options:
(1) Reject the bid and, if he determines that same is in the best interest of the City, re-
advertise the item for bidding; or
(2) Request that the Mayor and City Commission make additional funds available and
proceed to negotiate an agreement with the sole bidder; or
(ITB-28-06/07
CITY OF MIAMI BEACH Amended Page 28,
IS Addendum 1)
(3) Negotiate an agreement with the lowest and best bidder exceeding the budgeted
amount of the work. If the City Manager is unable to successfully negotiate an
agreement with the lowest and best bidder, the City Manager may terminate
negotiations with such bidder and commence negotiations with the second lowest and
best bidder. If the City Manager is unable to successfully negotiate an agreement with
the second lowest and best bidder, the City Manager may terminate negotiations with
the second bidder and commence negotiations with the third lowest and best bidder.
The City Commission shall consider the City Manager's recommendation(s) and, may
approve or reject the City Manager's recommendation(s). In any case, the Mayor and
City Commission shall select and authorize negotiations with the bidder(s) which the
Mayor and Commission deem to be in the best interest of the City. The City
Commission may also reject all bids received.
The selection or approval by the City Commission shall not constitute a binding
contract between the City and the selected or approved bidder(s). A binding
contract will exist upon the completion of successful negotiations as determined by the
Administration, the City Attorney's Office form approving the contract or contracts, and
then the Mayor and City Clerk signing the contract(s) after the selected or approved
bidder(s) has (or have) done so. Only the executed contract(s) will be binding on the
contracting parties.
(ITB-28-06/07
Cl1'Y OF MIAMI BEACH Added Page 28-b,
28-b Addendum 1)
00530. SUPPLEMENT TO BID/TENDER FORM
DRUG FREE WORKPLACE CERTIFICATION
THIS FORM MUST BE SUBMITTED PRIOR TO AWARD FOR BIDDER TO
BE DEEMED RESPONSIBLE.
The undersigned Bidder hereby certifies that it will provide adrug-free workplace
program by:
(1) Advising all employees/prospective employees, including those of subcontractors,
that a prerequisite condition of employment on the Project will be passing a drug
screening test.
(2) Certifying that a drug screening test shall be carried out prior to any employee
starting work and the cost of all tests shall be the responsibility of the Contractor and be
included in the Lump Sum Bid Price.
(3) Publishing a statement notifying its employees that the unlawful manufacture,
distribution, dispensing, possession, or use of a controlled substance is prohibited in
the offeror's workplace, and specifying the actions that will be taken against
employees for violations of such prohibition;
(4) Establishing a continuing drug-free awareness program to inform its employees
about:
(i) The dangers of drug abuse in the workplace;
(ii) The Bidder's policy of maintaining adrug-free workplace;
(iii) Any available drug counseling, rehabilitation, and employee assistance
programs; and
(iv) The penalties that may be imposed upon employees for drug abuse violations
occurring in the workplace;
(5) Giving all employees engaged in performance of the Contract a copy of the
statement required by subparagraphs (1) & (3);
(6) Notifying all employees, in writing, of the statement required by subparagraphs (1) &
(3), that as a condition of employment on a covered Contract, the employee shall:
(i) Abide by the terms of the statement; and
(ii) Notify the employer in writing of the employee's conviction under a criminal
drug statute for a violation occurring in the workplace no later than five (5)
calendar days after such conviction;
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/].3/07 60
(7) Notifying the City in writing within ten (10) calendar days after receiving notice under
subdivision (4 & 6) (ii) above, from an employee or otherwise receiving actual notice
of such conviction. The notice shall include the position title of the employee;
(8) Any employee who tests positive on a drug test and or is convicted of drug abuse
shall not be allowed to work on the Project site.
(9) Within thirty (30) calendar days after receiving notice under subparagraph (4 ~ 6) of
a conviction, taking one of the following actions with respect to an employee who is
convicted of a drug abuse violation occurring in the workplace:
(i) Taking appropriate personnel action against such employee, up to and
including termination; or
(ii) Requiring such employee to participate satisfactorily in a drug abuse
assistance or rehabilitation program approved for such purposes by a federal,
state, or local health, law enforcement, or other appropriate agency; and
(10)Making a good faith effort to maintain a dfug-free wok lace, program through
implementation of subparagraphs(1)thvough (9). ~ `~ ~,
(Bi~fder~gnature)
f- i
~--• i (Print Vendor Name)
STATE OF I-- IC'-4 ~ 1 ~~ <~~
COUNTY OF ~=~»,~„ - !_`>c~ C..' e
The foregoing instrument was acknowledged_ before me this ~' day of
~~ix.0 , 20 t~"7 , by 1%.c, r-, C) ~E +~~ C ~' S, ~ as
-~ ,. (name of person whose signature is being notarized)
' 1~c~~~~ ~ i>E~:-,-{~ (title) of ~.I~ ~ c,,~r~c rlur, ~u; ;~ ,
_ _._ __ __ ...(name of corporation/company)
.......... ...............
,,known to me to be the person described herein; or who produced as
identification, and who did/did riot take an-oath.
NOT Y PUBLIC:
~'~.~ - ,
nature)
(Print Name)
My commission expires:
BID NO: 28-06/07
DATE: 03/13/07
~o J~~N C... ~kiF ~~;, .
wo~'~et 16, 9F
:~2~ l~iAN ~*~.
*. ~..®
y'. #DD 491492
'+,'~~AUg~~D~~Si pt~a~~.
CITY OF MIAMI BEACH
61
00540. SUPPLEMENT TO BID/TENDER FORM
TRENCH SAFETY ACT
IF APPLICABLE, THIS FORM MUST BE SUBMITTED WITH BID FOR BID
TO BE DEEMED RESPONSIVE. (SEE SECTION 00407)
On October 1, 1990 House Bill 3181, known as the Trench Safety Act became law. This
incorporates the Occupational Safety & Health Administration (OSHA) revised excavation safety
standards, citation 29 CFR.S.1926.650, as Florida's own standards.
The Bidder, by virtue of the signature below, affirms that the Bidder is aware of this Act, and will
comply with all applicable trench safety standards. Such assurance shall be legally binding on
all persons employed by the Bidder and subcontractors.
The Bidder is also obligated to identify the anticipated method and cost of compliance with the
applicable trench safety standards.
BIDDER ACKNOWLEDGES THAT INCLUDED IN THE VARIOUS ITEMS OF THE PROPOSAL
AND IN THE TOTAL BID PRICE ARE COSTS FOR COMPLYING WITH THE FLORIDA
TRENCH SAFETY ACT. THESE ITEMS ARE A BREAKOUT OF THE RESPECTIVE ITEMS
INVOLVING TRENCHING AND WILL NOT BE PAID SEPARATELY. THEY ARE NOT TO BE
CONFUSED WITH BID ITEMS IN THE SCHEDULE OF PRICES, NOR BE CONSIDERED
ADDITIONAL WORK.
The Bidder further identified the costs and methods summarized below:
Quantity Unit
cription Unit Price Price Extended
~ ,`
~ ,
r. ~ JC
~J, ~- z
Total $ ~~~ ~-'~'~`-
~, ~~~c~>
::t
Method
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: U3/13/U7 62
IN ~ ORDER TO BE CONSIDERED RESPONSIVE, THE BIDDER MUST COMPLETE*
THIS FORM. SIGN AND SUBMIT IT WITH ITS BID DOCUMENT.
ature of Bidder
*COMPLETION REQUIRES FILLING IN THE APPROPRIATE DETAILS UNDER THE
HEADINGS, i.e., DESCRIPTION, UNIT, QUANTITY PRICE, UNIT PRI__CE
EXTENDED. AND METHOD.
BID NU: 28-06/0? CITY OF MIAMI BEACH
DATE: 03/13/07 63
00550. RECYCLED CONTENT INFORMATION
In support of the Florida Waste Management Law, Bidders are encouraged to supply
with their bid, any information available regarding recycled material content in the
products bid. The City is particularly interested in the type of recycled material used
(such as paper, plastic, glass, metal, etc.); and the percentage of recycled material
contained in the product. The City also requests information regarding any known or
potential material content in the product that may be extracted and recycled after the
product has served its intended purpose.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/I3/07 64
00600. CONTRACT
CONTRACT
THIS IS A CONTRACT, by and between the City of Miami Beach, a political
subdivision of the State of Florida, hereinafter referred to as CITY, and Solo
Construction Corporation, hereinafter referred to as CONTRACTOR.
W I T N E S S E T H, that CONTRACTOR and CITY, for the considerations
hereinafter named, agree as follows:
ARTICLE 1
SCOPE OF WORK
CONTRACTOR hereby agrees to furnish all, unless specifically stated otherwise, labor,
materials, equipment, supervision, mobilization, demobilization, survey, services and
incidentals necessary to perform and complete the work to the full intent as shown or
indicated in/on the Contract Documents and related thereto for the Project.
ARTICLE 2
CONTRACT TIME
2.1 CONTRACTOR shall be instructed to commence the Work by written instructions
in the form of a Standing Order issued by the City's Procurement Director and a
Notice to Proceed issued by the Contract Administrator. Two (2) Notices to
Proceed will be issued for this Contract. CONTRACTOR shall commence
scheduling activities, permit applications and other preconstruction work within
five (5) calendar days after the Project Initiation Date, which shall be the same as
the date of the first Notice to Proceed. The first Notice to Proceed and Purchase
Order will not be issued until CONTRACTOR's submission to CITY of all required
documents (including but limited to: Payment and Performance Bonds, and
Insurance Certificate) and after execution of the Contract by both parties.
2.1.1. The receipt of all necessary permits by CONTRACTOR and acceptance
of the schedule duration as stated herein and acceptance and approval
of CONTRACTOR'S List of Deliverables, Project Schedule, Mobilization
Plan, Safety & Health Manual, Quality Control Manual, Risk
Management Plan, Schedule of Values, and attendance at the Pre-
Construction Conference to review general administrative requirements;
and to review in detail the Scope of Work and CONTRACTOR'S "Base
Line" Project Schedule is a condition precedent to the issuance of the
Second Notice to Proceed to mobilize on the Project Site and commence
with the physical construction of the Work.
(ITB-28-06/07
BID NO: 28-06/07 CITY OF MIAMI BEACH Amended Page 65,
DATE: 03/13/07 65 Addendum 2)
The CONTRACTOR shall submit and have approved by the PROGRAM
MANAGER all necessary documents required by this provision prior to
the issuance of the second Notice to Proceed as set forth below:
Submittal Description To be Submitted by
Contractor along
with the Executed
Contract Documents "Contract
Award"
1`~. NTP 2nd.NTP
(Contract
Award Plus
30-days)
~~~
Bid Bond Witlh Bid
Pre-Gonstrucfion Conference + 30-da s X
List of Deliverables X
Pertormance Bond X
Pa ent Bond X
Certificates of Insurance X
Contractor's License X
Risk Mana ement Plan -Final X
Mobilizaton Plan -Draft X
Pro'ect Schedule -Draft X
Qualit Control Manual -Draft X
Safet & Health Manual -Draft X
Schedule of Values -Draft + 21-da s
Mobilizaton Plan -Final + 21-da s
Pro'ect Schedule -Base Line + 21-da s
Qualit Control Manual -Final + 21-da s
Safet & Health Manual -Final + 21-da s
Schedule of Values -Final +21- da s
Construction NTP X
Notes:
* For the purposes of this schedule, the term "Contract Award" shall be the last date of
execution of the Contract by both parties.
** For the purposes of this schedule, the reference to "Day" or "Days" shall refer to
calendar days.
2.2 Time is of the essence throughout this Contract. This Project shall be
substantially completed within One Hundred Fifty Three (153) calendar days
from the issuance of the second Notice to Proceed, and completed and ready for
final payment in accordance with Article 5 within Thirty (30) calendar days from
the date certified by CONSULTANT as the date of Substantial Completion.
2.3 Upon failure of CONTRACTOR to substantially complete the Contract within the
specified period of time, plus approved time extensions, CONTRACTOR shall
pay to CITY the sum of TWO THOUSAND DOLLARS ($2,000.00) for each
calendar day after the time specified in Section 2.2 above, plus any approved
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 66
time extensions, for Substantial Completion. After Substantial Completion should
CONTRACTOR fail to complete the remaining work within the time specified in
section 2.2 above, plus approved time extensions thereof, for completion and
readiness for final payment, CONTRACTOR shall pay to CITY the sum of TWO
THOUSAND DOLLARS ($2,000.00) for each calendar day after the time
specified in Section 2.2 above, plus any approved extensions, for completion and
readiness for final payment. These amounts are not penalties but are liquidated
damages to CITY for its inability to obtain full beneficial occupancy and/or use of
the Project. Liquidated damages are hereby fixed and agreed upon between the
parties, recognizing the impossibility of precisely ascertaining the amount of
damages that will be sustained by CITY as a consequence of such delay, and
both parties desiring to obviate any question of dispute concerning the amount of
said damages and the cost and effect of the failure of CONTRACTOR to
complete the Contract on time.
2.4 CITY is authorized to deduct liquidated damages from monies due to
CONTRACTOR for the Work under this Contract or as much thereof as CITY
may, in its sole discretion, deem just and reasonable.
2.5 CONTRACTOR shall be responsible for reimbursing CITY, in addition to
liquidated damages, for all costs incurred by CONSULTANT in administering the
construction of the Project beyond the completion date specified above, plus
approved time extensions. CONSULTANT construction administration costs
shall be pursuant to the contract between CITY and CONSULTANT, a copy of
which is available upon request of the Contract Administrator. All such costs
shall be deducted from the monies due CONTRACTOR for performance of Work
under this Contract by means of unilateral credit change orders issued by CITY
as costs are incurred by CONSULTANT and agreed to by CITY.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 67
ARTICLE 3
THE CONTRACT SUM
[ ] This is a Unit Price Contract:*
3.1 CITY shall pay to CONTRACTOR the amounts determined for the total number
of each of the units of work completed at the unit price stated in the schedule of
prices bid. The number of units contained in this schedule is an estimate only,
and final payment shall be made for the actual number of units incorporated in or
made necessary by the Work covered by the Contract Documents.
3.2 Payment shall be made at the unit prices applicable to each integral part of the
Work. These prices shall be full compensation for all costs, including overhead
and profit, associated with completion of all the Work in full conformity with the
requirements as stated or shown, or both, in the Contract Documents. The cost
of any item of work not covered by a definite Contract unit price shall be included
in the Contract unit price or lump sum price to which the item is most applicable.
[X] This is a Lump Sum Contract:*
3.1 CITY shall pay to CONTRACTOR for the performance of the Work described in
the Contract Documents, the total price stated as awarded.
3.2 Payment shall be at the lump sum price stated in the Contract. This price shall
be full compensation for all costs, including overhead and profit, associated with
completion of all the work in full conformity with the requirements as stated or
shown, or both, in the Contract Documents. The cost of any item of work not
covered by a definite Contract lump sum should be included in the lump sum
price to which the item is most applicable.
BID NO: 28-06107 CITY OF MIAMI BEACH
DATE: 03/13/07 68
ARTICLE 4
PROGRESS PAYMENTS
4.1
CONTRACTOR shall submit at the end of each and every month an Application
for Payment for work completed during the current month.
4.1.1 CONTRACTOR shall submit to the PROGRAM MANAGER a draft pay
application for his review. The PROGRAM MANAGER and
CONSULTANT shall review the draft application with CONTRACTOR
and resolve any differences prior to submitting the months formal pay
application.
4.1.2 PROGRAM MANAGER and CONSULTANT shall make every effort to
ensure that each pay application is reviewed and a recommendation to
OWNER is completed within five (5) working days from receiving a
complete, correct pay application that is properly executed.
4.1.3 OWNER shall upon receipt of a written recommendation for payment
from PROGRAM MANAGER ensure payment to CONTRACTOR within
sixty (60) days.
CONTRACTOR'S application shall be in the format approved prior to the Second
Notice to Proceed. Each application shall provide supporting evidence as may be
required by CONSULTANT. CONTRACTOR shall include, but same shall be
limited to, at Consultant's discretion, with each Application for Payment, an
updated progress schedule, with a copy of a current "Errors Report" identifying
no errors, acceptable to CONSULTANT, as required by the Contract Documents
and a release of liens and consent of surety relative to the work which is the
subject of the Application. Each Application for Payment shall be submitted in
triplicate to CONSULTANT for approval. CITY shall make payment to
CONTRACTOR within thirty (60) days after approval by CONSULTANT of
CONTRACTOR'S Application for Payment and submission of an acceptable
updated progress schedule.
4.2 Ten percent (10%) of all monies earned by CONTRACTOR shall be retained by
CITY until Final Completion and acceptance by CITY in accordance with Article 5
hereof, except that after ninety percent (90%) of the Work has been completed,
the Contract Administrator may reduce the retainage to five percent (5%) of all
monies previously earned and all monies earned thereafter. Any reduction in
retainage shall be in the sole discretion of the Contract Administrator, shall be
recommended by CONSULTANT and CONTRACTOR shall have no entitlement
to a reduction. Any interest earned on retainage shall accrue to the benefit of
CITY. All requests for retainage reduction shall be in writing in a separate stand
alone document.
4.3 CITY may withhold, in whole or in part, payment to such extent as may be
necessary to protect itself from loss on account of:
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 69
4.3.1 Defective work not remedied.
4.3.2 Claims filed or reasonable evidence indicating probable filing of claims
by other parties against CONTRACTOR or CITY because of
CONTRACTOR'S performance.
4.3.3 Failure of CONTRACTOR to make payments properly to Subcontractors
or for material or labor.
4.3.4 Damage to another contractor not remedied.
4.3.5 Liquidated damages and costs incurred by CONSULTANT for extended
construction administration.
4.3.6 Failure of CONTRACTOR to provide any and all documents required by
the Contract Documents.
When the above grounds are removed or resolved satisfactory to the Contract
Administrator, payment shall be made in whole or in part.
ARTICLE 5
ACCEPTANCE AND FINAL PAYMENT
5.1 Upon receipt of written notice from CONTRACTOR that the Work is ready for
final inspection and acceptance, CONSULTANT shall, within ten (10) calendar
days, make an inspection thereof. If CONSULTANT and Contract Administrator
find the Work acceptable, the requisite documents have been submitted and the
requirements of the Contract Documents fully satisfied, and all conditions of the
permits and regulatory agencies have been met, a Final Certificate of Payment
(Form 00926) shall be issued by CONSULTANT, over its signature, stating that
the requirements of the Contract Documents have been performed and the Work
is ready for acceptance under the terms and conditions thereof.
5.2 Before issuance of the Final Certificate for Payment, CONTRACTOR shall
deliver to CONSULTANT a complete release of all liens arising out of this
Contract, receipts in full in lieu thereof; an affidavit certifying that all suppliers and
subcontractors have been paid in full and that all other indebtedness connected
with the Work has been paid, and a consent of the surety to final payment; the
final corrected as-built drawings; and the final bill of materials, if required, and
invoice.
5.3 If, after the Work has been substantially completed, full completion thereof is
materially delayed through no fault of CONTRACTOR, and CONSULTANT so
certifies, CITY shall, upon certificate of CONSULTANT, and without terminating
the Contract, make payment of the balance due for that portion of the Work fully
completed and accepted. Such payment shall be made under the terms and
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 70
conditions governing final payment, except that it shall not constitute a waiver of
claims.
5.4 Final payment shall be made only after the City Manager or his designee has
reviewed a written evaluation of the performance of CONTRACTOR prepared by
the Contract Administrator, and approved the final payment. The acceptance of
final payment shall constitute a waiver of all claims by CONTRACTOR, except
those previously made in strict accordance with the provisions of the General
Conditions and identified by CONTRACTOR as unsettled at the time of the
application for final payment.
ARTICLE 6
MISCELLANEOUS
6.1 This Contract is part of, and incorporated in, the Contract Documents as defined
herein. Accordingly, all of the documents incorporated by the Contract
Documents shall govern this Project.
6.2 Where there is a conflict between any provision set forth within the Contract
Documents and a more stringent state or federal provision which is applicable to
this Project, the more stringent state or federal provision shall prevail.
6.3 Public Entity Crimes
In accordance with the Public Crimes Act, Section 287.133, Florida Statutes, a
person or affiliate who is a contractor, consultant or other provider, who has been
placed on the convicted vendor list following a conviction for a public entity crime
may not submit a bid on a contract to provide any goods or services to the CITY,
may not submit a bid on a contract with the CITY for the construction or repair of
a public building or public work, may not submit bids on leases of real property to
the CITY, may not be awarded or perform work as a contractor, supplier,
subcontractor, or consultant under a contract with the CITY, and may not
transact any business with the CITY in excess of the threshold amount provided
in Section 287.017, Florida Statutes, for category two purchases for a period of
36 months from the date of being placed on the convicted vendor list. Violation
of this section by Contractor shall result in cancellation of the CITY purchase and
may result in Contractor debarment.
6.4 Independent Contractor
CONTRACTOR acknowledges that it is an independent contractor under this
Contract. Services provided by CONTRACTOR pursuant to this Contract shall
be subject to the supervision of CONTRACTOR. In providing such services,
neither CONTRACTOR nor its agents shall act as officers, employees, or agents
of the CITY. This Contract shall not constitute or make the parties a partnership
or joint venture.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 71
6.5
6.6
6.7
Third Partv Beneficiaries
Neither CONTRACTOR nor CITY intend to directly or substantially benefit a third
party by this Contract. Therefore, the parties agree that there are no third party
beneficiaries to this Contract and that no third party shall be entitled to assert a
claim against either of them based upon this Contract. The parties expressly
acknowledge that it is not their intent to create any rights or obligations in any
third person or entity under this Contract.
Notices
Whenever either party desires to give notice to the other, such notice must be in
writing, sent by certified United States Mail, postage prepaid, return receipt
requested, or by hand-delivery with a request for a written receipt of
acknowledgment of delivery, addressed to the party for whom it is intended at the
place last specified.
The place for giving notice shall remain the same as set forth herein until
changed in writing in the manner provided in this section. For the present, the
parties designate the following:
For CITY:
CIP Deaartment
77717 Street, Suite 201
Miami Beach, Florida 33139
Attn: Jorge Chartrand, CIP Director
With copies to:
City Attorney
City of Miami Beach
1700 Convention Center Drive
Miami Beach. Florida 33139
Steahen Baumal
Pros~ram Manager
URS Corporation
7650 Coraorate Center Drive,
Suite 401
Miami. Florida 33126-2665
For Contractor:
Mr. Randv Pierson, President
Solo Construction Corporation
3855 Commerce Parkway
Miramar, Florida 33025
Assignment and Performance
Neither this Contract nor any interest herein shall be assigned, transferred, or
encumbered by either party. In addition, CONTRACTOR shall not subcontract
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 72
any portion of the work required by this Contract except as authorized by Section
27 of the General Conditions. CONTRACTOR represents that all persons
delivering the services required by this Contract have the knowledge and skills,
either by training, experience, education, or a combination thereof, to adequately
and competently perform the duties, obligations, and services set forth in the
Scope of Work and to provide and perform such services to CITY's satisfaction
for the agreed compensation.
CONTRACTOR shall perform its duties, obligations, and services under this
Contract in a skillful and respectable manner. The quality of CONTRACTOR's
performance and all interim and final product(s) provided to or on behalf of CITY
shall be comparable to the best local and national standards.
6.8 Materiality and Waiver of Breach
CITY and CONTRACTOR agree that each requirement, duty, and obligation set
forth in these Contract Documents is substantial and important to the formation of
this Contract and, therefore, is a material term hereof.
CITY's failure to enforce any provision of this Contract shall not be deemed a
waiver of such provision or modification of this Contract. A waiver of any breach
of a provision of this Contract shall not be deemed a waiver of any subsequent
breach and shall not be construed to be a modification of the terms of this
Contract.
6.9 Severance
In the event a portion of this Contract is found by a court of competent jurisdiction
to be invalid, the remaining provisions shall continue to be effective unless CITY
or CONTRACTOR elects to terminate this Contract. An election to terminate this
Contract based upon this provision shall be made within seven (7) days after the
finding by the court becomes final.
6.10 Applicable Law and Venue
This Contract shall be enforceable in Miami-Dade County, Florida, and if legal
action is necessary by either party with respect to the enforcement of any or all of
the terms or conditions herein exclusive venue for the enforcement of same shall
lie in Miami-Dade County, Florida. By entering into this Contract,
CONTRACTOR and CITY hereby expressly waive any rights either party
may have to a trial by jury of any civil litigation related to, or arising out of
the Project. CONTRACTOR, shall specifically bind all subcontractors to the
provisions of this Contract.
6.11 Amendments
No modification, amendment, or alteration in the terms or conditions contained
herein shall be effective unless contained in a written document prepared with
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 73
the same or similar formality as this Contract and executed by the Board and
CONTRACTOR.
6.12 Prior Agreements
This document incorporates and includes all prior negotiations, correspondence,
conversations, agreements, and understandings applicable to the matters
contained herein and the parties agree that there are no commitments,
agreements or understandings concerning the subject matter of this Contract that
are not contained in this document. Accordingly, the parties agree that no
deviation from the terms hereof shall be predicated upon any prior
representations or agreements, whether oral or written. It is further agreed that
no modification, amendment or alteration in the terms or conditions contained
herein shall be effective unless set forth in writing in accordance with Section
6.11 above.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 74
IN WITNESS WHEREOF, the parties have set eir hands and seals the day and
year first above written.
ATT ST: ,~'" TH C
V A/l (~
City Clerk Robert Parcher M Y
CONTRACTOR MUST EXECUTE THIS CONTRACT AS INDICATED BELOW. USE
CORPORATION OR NONCORPORATION FORMAT, AS APPLICABLE.
[If incorporated sign below.]
ATTEST:
~ _ ~-~
(Secre ary)
(Corporate Seal)
[If not incorporated sign below.]
WITNESSES:
CONTRACTOR
~ ~R ~
me of Corporation)
By: ~ -
(i re)
r'.,._
I~.c9 ~:1.) - ~`5t
(Print Name and Title)
~~ day of~ ~ ~ , 20
BEACH
David Dermer
CONTRACTOR
(Name of Firm)
By:
(Signature)
(Print Name and Title)
day of , 20
CITY REQUIRES FOUR (4) FULLY-EXECUTED CONTRACTS, FOR DISTRIBUTION.
APPROVED AS TO
FORM & LANGUAGE
~ FOR EXECUTION
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 75 (,,,
V~ ate
00708. FORM CERTIFICATE OF INSURANCE
A form Certificate of Insurance will be attached here.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 76
ACORDM CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YYY1~
04/02/2007
PRODUCER (305) 558-1101 FAX (305) 822-4722
XBM Construction Insurance Inc.
7850 Northwest 146 Street THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
Miami Lakes, FL 33016
INSURERS AFFORDING COVERAGE
NAIL #
INSURED Solo Construction Corp INSURERA: TranBCOntinental Insurance Co 20486
3855 Commerce Parkway INSURERe: Continental Casualty Co 20443
Miramar, FL 33025 INSURERC: American Guarantee rt Liab Ins
INSURER D: Vall@y FOrge Inauzaaae CO 20$08
INSURER E:
CAVFRA2RS
THE POLICIES OF INSURANCE. LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR D TYpE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION LIMBS
GENERAL LIABILITY 2077253623 09/18/2006 09/18/2007 EACH OCCURRENCE $ 1,000,000
X COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED S 100,000
CLAIMS MADE Q OCCUR MED EXP (Any one person) a 5 , 00 0
A PERSONAL B,ADVINJURY S 1,000,00
GENERAL AGGREGATE $ 2, 000, 000
GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS -COMP/OP AGG S 2 , 00 0 , 000
POLICY g PRO LOC
JECT
AUT OMOBILELUIBIL-TY BUA2072710048 09/18/2006 09/18/2007 COMBINED SINGLE LIMIT
X ANY AUTO (Ee accident) $
1,000,000
ALL OWNED AUTOS BODILY INJURY
SCHEDULED AUTOS (Per person) S
B
X
HIRED AUTOS
BODILY INJURY
X
NON-OWNED AUTOS
~ ~/~y-'Jf
~// II
(Peraeddent) S
G PROPERTY DAMAGE
(Per accident) $
GARAOE LUUlILITY AUTO ONLY - EA ACCIDENT $
ANY AUTO EA ACC
OTHER THAN S
AUTO ONLY: AGG $
EXCESSIUMBRELLALIABILITY AIIC591615101 09/18/2006 09/18/2007 EACH OCCURRENCE S 10, 000, 00
X OCCUR ~ CLAIMSMADE AGGREGATE S 10, 000, 00
C g
DEDUCTIBLE S
X RETENTION S $
WORKERSCOMPENSATKfNAND
' WC2072709837 09/18/2006 09/18/2007 X WCSTATU- OTH-
D EMPLOYERS
LIABILITY
ANY PROPRIETOR/PARTNER/EXECUTIVE
E.L. EACH ACCIDENT
S 1,000,000
OFFICERlMEMBEREXCLUDEDT
H
d
ib
d E.L. DISEASE-EA EMPLOYE S 1,000,000
es,
escr
e un
er
SPECIAL PROVISIONS below
E.L. DISEASE-POLICY LIMIT
S 1,000,00
OTHER
DESCRIP710N OF OPERATKINS I LOCATKNiS / VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT /SPECIAL PROVISIONS
ertificate holder is listed ae additional insured with respect to General Liability.
8xcept for 10 days notice for nos-payment of premium.
CERTIFICATE 4111 I1FR nwuner r wT~~u
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE
EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL
3 0 * DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,
City of Miami HeaCh BUT FAILURE TO MAIL SUCH NOTICE SHALL BAPOSE NO OBLIGATKfN OR LIABILITY
17 00 Convention Center Drive OF ANY KIND UPON THE INSURER, ITS AGENT'S OR REPRESENTATIVES.
Miami Beach, FL 33139 AUTHORI2EDREPRESENTATNE N,,yr-~-1. ~-..
Alex Perez/LIIISA --
ACORD 25 (2001/08) ®ACORD CORPORATION 1988
IMPORTANT
If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement
on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may
require an endorsement. A statement on this certificate does not confer rights to the certificate
holder in lieu of such endorsement(s).
DISCLAIMER
The Certificate of Insurance on the reverse side of this form does not constitute a contract between
the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it
affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon.
ACORD 25 (2001/08)
BOND NO. K06810408
00710. FORM OF PERFORMANCE BOND
SOLO CONSTRUCTION CORPORATION- 3855 COMMERCE
BY THIS BOND, We PARKWAY: MIRAMAR, FL 33025 -(3051944-3922 aS
Principal, hereinafter called CONTRACTOR, and
WESTCHESTER FIRE INSURANCE COMPANY- 500 COLONIAL
INTR. PKwv ~TF zno ~g~5o u~~wFLI. ~a ~nm~ ~~~s~795.4~e,_, as Surety, are bound to the City of Miami
Beach, Florida, as Obligee, hereinafter called CITY, in the amount of
ONE MILLION, TWO HUNDRED THOUSAND
AND Nonoo------------------------------------------------- Dollars ($1,200,000.00--) for the payment whereof
CONTRACTOR and Surety bind themselves, their heirs, executors, administrators,
successors and assigns, jointly and severally.
WHEREAS, CONTRACTOR has by written agreement entered into a Contract,
Bid/Contract No.: 2s-o6io~ awarded the day of
20 ,with CITY which Contract Documents are by reference
incorporated herein and made a part hereof, and specifically include provision for
liquidated damages, and other damages identified, and for the purposes of this Bond
are hereafter referred to as the "Contract' ;
THE CONDITION OF THIS BOND is that if CONTRACTOR:
1. Performs the Contract between CONTRACTOR and CITY for construction of
MULTIPURPOSE MUNICIPAL PARKING FACILITY -BID PACKAGE Ol-UNDERGROUND UTILITIES, the Contract being
made a part of this Bond by reference, at the times and in the manner prescribed
in the Contract; and
2. Pays CITY all losses, liquidated damages, expenses, costs and attorney's fees
including appellate proceedings, that CITY sustains as a result of default by
CONTRACTOR under the Contract; an
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 77
FORM OF PERFORMANCE BOND
(Continued)
3. Performs the guarantee of all work and materials furnished under the Contract for
the time specified in the Contract; then THIS BOND IS VOID, OTHERWISE IT
REMAINS IN FULL FORCE AND EFFECT.
Whenever CONTRACTOR shall be, and declared by CITY to be, in default under
the Contract, CITY having performed CITY obligations thereunder, the Surety
may promptly remedy the default,, or shall promptly:
3.1. Complete the Project in accordance with the terms and conditions of the
Contract Documents;. or
3.2. Obtain a bid or bids for completing the Project in accordance with the
terms and conditions of the Contract Documents, and upon
determination by Surety of the lowest responsible Bidder, or, if CITY
elects, upon determination by CITY and Surety jointly of the lowest
responsible Bidder, arrange for a contract between such Bidder and
CITY, and make available as work progresses (even though there
should be a default or a succession of defaults under the Contract or
Contracts of completion arranged under this paragraph) sufficient funds
to pay the cost of completion less the balance of the Contract Price; but
not exceeding, including other costs and damages for which the Surety
may be liable hereunder, the amount set .forth in the first paragraph
hereof. The term "balance 'of the Contract Price," as used in this
paragraph, shall mean the total amount payable by CITY to
CONTRACTOR under the Contract and any amendments thereto, less
the amount properly paid by CITY to CONTRACTOR.
No right of action -shall accrue on this bond to or for the use of any person or
corporation other than CITY named herein.
The Surety hereby waives notice of and agrees that any changes in or under the
Contract Documents and compliance or noncompliance with any formalities
connected with the Contract or the changes does not affect Surety's obligation
under this Bond.
Signed and sealed this 19th ,day of .TUrrE , 200
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 78
FORM OF PERFORMANCE BOND
_S
Secref~ry
(CORPORATE SEAL)
IN THE PRESENCE OF:
o.,CE~C.2.
~ -
(Continued)
By:.
'TION CORPORATION
of Corporation)
~o~r~~ 1Y~s~
(Print Name and Title)
INSURANCE COMPANY:
WESTCHESTER FIRE INSURANCE COMPANY
..~-
By:
A and Attorney-in-Fact-~.~~ ~ITSCNIrr
770 SOUTH DIXIE HIGHWAY,
Address: sUITE loi _
(Street)
CORAL GABLES, FL 33146.
(City/State/Zip Code)
Telephone No.: 305-662-3852
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 79
BOND NO. K06810408
00720. FORM OF PAYMENT BOND
SOLO CONSTRUCTION CORPORATION- 3855 COMMERCE
BY THIS BOND, We PARKWAY; MIRAMAR, FL 33025 -(305) 944-3922 aS
Principal, hereinafter called CONTRACTOR, and
WESTCHESTER FIRE INSURANCE COMPANY- 500 COLONIAL
CNTR. PKWY.. STE 200 #9250: ROSWELL. GA 30076 (678) 795-4397-, aS Surety, are bound to the Clty of Miami
Beach, Florida, as Obligee, hereinafter called CITY, in the amount of
ONE MILLION, TWO HUNDRED THOUSAND AND NO/100 Dollars ($1,200,000.00------) fOr the payment
whereof CONTRACTOR and Surety bind themselves, their heirs, executors,
administrators, successors and assigns, jointly and severally.
WHEREAS, CONTRACTOR has by written agreement entered into a Contract,
Bid/Contract No.: 2s-o6io7 awarded the day of
20 ,with CITY which Contract Documents are by reference
incorporated herein and made a part hereof, and specifically include provision for
liquidated damages, and other damages identified, and for the purposes of this Bond
are hereafter referred to as the "Contract' ;
THE CONDITION OF THIS BOND is that if CONTRACTOR:
1. Pays CITY all losses, liquidated damages, expenses, costs and attorney's fees
including appellate proceedings, that CITY sustains because of default by
CONTRACTOR under the Contract; and
2. Promptly makes payments to all claimants as defined by Florida Statute
255.05(1) for all labor, materials and supplies used directly or indirectly by
CONTRACTOR in the performance of the Contract;
THEN CONTRACTOR'S OBLIGATION SHALL BE VOID; OTHERWISE, IT
SHALL REMAIN IN FULL FORCE AND EFFECT SUBJECT, HOWEVER, TO
THE FOLLOWING CONDITIONS:
2.1. A claimant, except a laborer, who is not in privity with CONTRACTOR
and who has not received payment for its labor, materials, or supplies
shall, within forty-five (45) days after beginning to furnish labor,
materials, or supplies for the prosecution of the work, furnish to
CONTRACTOR a notice that he intends to look to the bond for
.protection.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 80
FORM OF PAYMENT BOND
(Continued)
2.2. A claimant who is not in .privity with CONTRACTOR and who has not
received payment for its labor, materials, or supplies shall, within ninety
(90) days after performance of the labor or after complete. delivery of the
materials or supplies, deliver to CONTRACTOR and to the Surety,
written notice of the performance of the labor or delivery of the materials
or supplies and of the nonpayment.
2.3. No action for the labor, materials, or supplies may be .instituted against
CONTRACTOR or the Surety unless the notices .stated under the
preceding conditions (2.1) and (2.2) have been given.
2.4. Any. action under this Bond must be instituted in accordance with the
Notice and Time Limitations provisions prescribed in Section 255.05(2),
Florida Statutes.
The Surety. hereby waives notice of and agrees that any changes in or under the
Contract Documents and compliance or noncompliance with any formalities
connected with the Contract or the changes does not affect the Surety's
obligation under this Bond.
Signed and sealed this I9th day of JUNE
ATTEST:
/~
,.. -
~.
(Secr ark)
(Corporate Seal)
BID NO: 28-06/07
DATE: 03/13/07
CONTRACTOR
.._
20 07
UCTION CORPORATION
of Corporation)
By:
(Pnrint Name and Title)
' `- ~ day of c~~v , 20,~.
CITY OF MIAMI BEACH
81
IN TH PRESENCE OF:
---~.
INSURANCE COMPANY:
WESTCHESTER FIRE INSURANCE COMPANY
By:
gent and Attorney-in-Fact-D. w. nti~~s~Nrrl
770 SOUTH DIXIE HIGHWAY,
Address: SUITE lol _
(Street)
CORAL GABLES, FL 33146.
(City/State/Zip Code)
Telephone No.: 305-662-3852
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 82
00721. CERTIFICATE AS TO CORPORATE PRINCIPAL
I, ~ ~-t-I ~~~~ certify that I am the
Secretary of the corporation named as Principal in the foregoing Performance and
P ment jB~ond (Performance Bond and Payment Bond); that
b~C7-1 'CC~~S~.1
,who' signed the Bond(s) on behalf of the Principal, was
then ~~~~1 of said corporation; that I know his/her signature; and his/her
signature thereto ~is genuine; and that said Bond(s) was (were) duly signed, sealed and
atteste to on behalf of saidcorporation by authority of its governing body.
(SEAL)
Secretary on behalf of)
SOLO C~?taSTRI:}CTION CORPORATION
Corporation
STATE OF FLORIDA )
SS
COUNTY OF MIAMI-DADS )
Before me, a Notary Public duly commissioned, qualified and acting personally,
appeared D.W. MATSON III
to me well known, who
being by me first duly sworn upon oath says that helshe has been authorized to execute
the foregoing Performance and Payment Bond (Performance Bond and Payment Bond)
on behalf of CONTRACTOR named therein in favor of CITY.
Subscribed and Sworn to before me this 19th day of
JUNE , 20 07
My commission expires:
DINIACAVALIERE- NO a Public, Stat of FLORIDA
JUNE 19, 2008
Bonded
by TROY FAIN INSURANCE INC.
y gs~~:dv~~ Dinia Lavaliere
:~ ;Commission # DD327966
.~~~,~ Expires June 19, 2008
~,r,~,irBonded Tmy Fein • Inwrenca, Inc. 800.7857019
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 83
~~'ower ~f WESTCHI/STER FIRE INSURANCE COMPANY ~` 1 ~ 75275 ~\'4
Attorney I
244767
- f
KriOW ail Inert by tilCSe pI'e$entS: That WESTCHESTER FIRE IIVSURAN£E CQMPANY , a corporation of tale State of New York ,having its
principal office in the City ofAtlanta ,Georgia , put5uant to the following Resolution, adopted bythe Board of Directors of the said Company on NovBmber 8;,1999, to
I wit:
"RHSOLV'ED, ffiat the following Rubs shall govern rho execution for tht Cowpa^y ofbopds, undertakings, recognizances,conVacts apd other wnungs in the pature tbcrwf~ '
(3) That ifie Ptesidtdtt, any.Seatior Vice Preside^t, any Vree President, apd Assistant Vtce Praidrnt, or anyAttorney~ia-Fact, may executa'fora^d on behalf of ttu Company any,and ell bonds; undestakings,recoguizancd,
contracts and othrn writings m the natyre kYareof,.tho same [olio attested when pexessary by [hc Corporate Saretary, or any kssistant Corporate Secretary, and the seal of the Company affixed:theteto;ani3 that the
President, any Sanwr Vice President, any Vice President or any Assistant Vita Prestdenrtnay eppotnt and wthoiie any other Offroer (elfeted or apporiuad) of the Company, az Anoracys-In-Fan to so execute or attest to
the execution of all such writings on behalf of We Company at,d to affix the seal of the Company Iheretp :: :
I (2) Any such writing executed m accordance wrth these Rules shall be as binding upon the Cgmpany to any case as though signed by the President and attested to by the Corporate Secretary
I , (3) T'.he wgnature at tht President, nr o Senior Vreo President, or a Vice President, or an Assistant Yice Presadetrt and the seal ofhh Compenq: may be affuedby facsimile oa anypower of etiomey granted pursuant to this '
Resoluhop, and the signature of a etn-tify ing Officer and the seal: of the Company may be afYuted by facsimile to any cam ficate of azry such power, and apy such power Or tern ficata hewing such faesrmlla signature eptl seal
' shall be validand bind[^g on the Company : ,
(4) Such other Officers of the Compapy,.and Attorneys-In Fact shall have euthonry to certify or verify copies of this Reso[tuton, ahe By-Laws of the Company, aqd any afftdas tt or t~cord of the Gompa^} necessary to the
dischargeof their duhesi -
(5) :The passage of this Resglupon does riot rex oka any carper auttionty granttd by Resohttions of the Hoard of Drrritors °
Does hereby ntnlinate, constitute and appoititD:W. MASON, III and JOHN W. CHARI:TON both of the''City of Coral Gables, State of k'lorida ..iii'
each. individual ly zf there be more than one named; its true and lawful attorney:-m-fact;- to,make, exccUte, seal and deliver on its baba[€, and as its act and
~ deed any andall bonds, undertakings, reCognizanccs, contracts and other wntings in the nature thereof rn penalties not exceeding Twenty Million Dollars
($20«000,{}00) and the. execution of such writings in pursuance ofthese presents shall bear binding upon said Company, as fully and amply as if they had
been duly executed and ackowledged by the regularly elected officers of the Company at its principal office
IN WITNESS WHEREOF, the said Stephen M. Haney ,Vice-Prestdeiit, has hereunto subscribed hxs name and affixed the'cotliorate seal of the
sBidWESTCHESTER FIRIINSURANCE CUMPANY this 29th day ofSeptembor2006'.
~ ~ 'tl'Ygr`~ WESTCHESTER F1RE INSURANCE COINPANY
Stephen M.'Haney ,Vice President ~
COMMONWEALTH OF PENNSYLVANIA
COUNTY OF PHILADELPHIA ss. j
~ On thisZ4th dayof September , A.D. 2flD6 ,'before me, a ~lotary Fubhc of the Commonwealth of Pennsylvani3in andfor the County of Philadelphia I
I eame Stephen M; Harney ,Vice-President of the WLwSTCHEST~R FIRS INSURANCE COMPANY>to me personally krmwn to be the individual and
~ officer who executedthe preceding instrument, and he acknowledged that he executed the same, and that the seal affixed to the preceding instrument is the
corporate seat of said Company; hat the said corporate seal and his signature were duly affixed by the authority and direction of the said corporation, and
~ that Resolution, adopted. by the Board ofIyirectors of said.Companyseferred to rn the preceding instrument, is now in force. '
iN TESTIMONY WHEREOF, 1 have hereunto set my hand and affixed my official seal atrhe City of Philadelphia the day and year first above written.
~: ~~it~1H nira,rtr rr,.
I r ~~N i%. ~~~ ti
I ~ ~~., ~,d. ',~ "_ NOT.9.RIAL SEAL ~. _
~ ~i~~, 7r, ~' 3 ; Kathieen 1`iai, Notary Pzrblic ~ ~'~
,4 ~ , . C) ~ t ~- ~ i'hiiadelphia, Phitadelpirla County - _: ~__ ~ _~ . _ .: ~._-- - 1
9 ~ Note Pubtic
y-~~i ti ~ \ 2 ~': ~4ystoRtatissiaAtx{rites5eptert^.er<"~,2Cni? rY I
~ ~ -~
~ -~' ~ .~ C ,,~
~ ,,,., „t,,tx'`
I, the undersigned Secretary of WESTCtI)~STER FIRE INSURANCE CdMPANY , do hereby certify that the original. POWER OF
I ATTORNEY, of which the foregoing isa substantially tine and correct copy, is in full force and effect.
I In witness whereof, I have hereunto subscribed my name as Secretary, and affixed the corporate seal of the Corporation, this 19th day. of
JUNE ,2007:
~ .#, rp
~at ~^
~~
.` ~-~ >~
ti~, ~~~~~~~~~ George D. Mulligan,Secretary
TH"tS POWER GF ATTORNEYMAY NOT BE USED TO EXECUTE ANY BOND WITH AN INCEPTIQN DATE AF-fERSeptember 2~, 2008:.
~'
THE BACK OF THIS DOCUMENT LISTS VARIOUS SECURITY FEATURES ~ THAT WILL PROTECT AGAINST COPY COUNTERFEIT AND ALTERATION.
97 (~~ '~ti°--rnrc r I'l ri~io 'n 1 In'Ferl C4 i --~-
~~ ~ ~~h 'tee ..~~ ~ +nZIT'Q7fe„
/Q.+nL Ic. c~~~er n.~me\
e
~ ~
~--tC~C~e~:7~' ":7t1Y~-e~t~ ~.'` "'n' li--eTrnir~-t~~t~StP'S~7~d~ttd"~,~{ R~QYfRdYe
e
i r
~ ~
~rat2T
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 84
L1r~f4c• m~ ~~• he~r ~e• 1111r~.un ~ ~ r I e4~er n rerJi} In
~i'LiR'J~77Li".7T-s7riRT e' ~ ~e! ~ __~. ,-ccrc-P
(~~\ of / Q ~r-FFB~a~~e~
T
h
~
ce~eF
A~
fe~~~
S~~
C FeRe
~e iAfE~
~ AFSk~6 @fFAc ~ of
F1~e
62St nne /~ \ •in.~ r o.~i.h
i-r
ir
r
-
-
-s
-
-- -- - .~
-~
e
i
in c.4rumon4 nr ran reemen4 re
fe rre~•1 4n f
hnrni
n r.r •n
uihinh ~hir• I o+~e~r of
(~rorl i~ in refe f
rre rJ ~.r
44~~ }~ r
~~e
eF~
"
fe
e~a
~R~~R
F~t16~
f~eFe
R 'III nn+ ho rlee
mei•) 4n innn
rr,~r'++e
tF1
tt
F
C
dttt
CC~~
herein by refe renne env rlnn j
..men~ i
t nn#n. menf n
. r ~r.re e~me~n4
r .
S. ~.n~nr fhie~ I
'
'
e ~e,
" ~ ri
#'l
ve /'1 \ •i
Teti~ed e~i+r i+~er 4h e C•n.,l
r
y
t?fFQ~1~F.
[CC
+
~
~{~f~
'
e-
~'
eE
'~ t
eT
+~
h~ ~MC a~
- ~'~
f r
~iCt
~it
ttt
f
F~
rr *
n ~ ~
~~
.
r
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 85
00800. GENERAL CONDITIONS:
CONTRACT DOCUMENTS:
1.1. All Work shall be done in strict accordance with the Contract Documents
1.2. CONTRACTOR shall not proceed when in doubt as to any dimension or
measurement, but shall seek clarification from CONSULTANT.
1.5. CONTRACTOR shall be furnished three (3) copies, free of charge, of the
Contract Documents; one of which shall be preserved without alteration,
labeled "Record Copy," and always kept accessible, in the
CONTRACTOR'S site office, to the PROGRAM MANAGER and
CONSULTANT. In addition one copy of the l~ejest Contract Documents
shall be used strictly as a "Red Line" set, identified accordingly, and kept
in a safe location in the CONTRACTOR'S site office. Additional copies of
the Contract Documents may be obtained from CITY at the cost of
reproduction.
2. Intention of CITY:
It is the intent of CITY to describe in the Contract Documents a functionally
complete Project (or part thereof) to be constructed in accordance with the
Contract Documents and in accordance with all codes and regulations governing
construction of the Project. Any work, materials or equipment that may
reasonably be inferred from the Contract Documents as being required to
produce the intended result shall be supplied by CONTRACTOR whether or not
specifically called for. When words which have awell-known technical or trade
meaning are used to describe work, materials or equipment, such words shall be
interpreted. in accordance with that meaning. Reference to standard
specifications, manuals, or codes of any technical society, organization or
association, or to the laws or regulations of any governmental authority, whether
such reference be specific or by implication, shall mean the latest standard
specification, manual, code or laws or regulations in effect at the time of opening
of bids and CONTRACTOR shall comply therewith. CITY shall have no duties
other than those duties and obligations expressly set forth within the Contract
Documents.
3. Preliminary Matters:
3.1. Within five (5) calendar days prior to the pre-construction meeting
described in Section 3.2, CONTRACTOR shall submit to CONSULTANT
for CONSULTANT'S review and acceptance:
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 86
3.1.1. A Project "Draft" schedule, one (1) copy on a CD and One (1) hard
copy, in the indicated form:
[ X] Bar Chart
(]Modified CPM
[ ]CPM
[ ] Computerized CPM er~^^ +he ~~+e~+ o.r~+;,,., ~r:mnvern D~
e
(CPM shall be interpreted to be generally as outlined in the
Association of General Contractors (AGC) publication, "The Use of
CPM in Construction.")
CONTRACTOR shall provide a preliminary man loaded, logic
based "Base Line" Project schedule using The progress schedule
shall indicate the "Early Sstart" and "Early Finish" dates for each
activity. The Contractor shall include, in addition to normal work
activity input, input that encompasses all submittal approvals,
delivery durations for important materials and/or equipment. Logic
relationships of activities including physical and site restraints. This
input shall be submitted using precedence based CPM schedule
using the, most recent version of Primavera P3 software.
CONTRACTOR shall provide PROGRAM MANAGER with a copy
of the software.
The preliminary project schedule when submitted shall include an
error report that states no errors and be acceptable to
CONSULTANT.
Monthly, CONTRACTOR shall submit with each progress
application an update of the Project Schedule with an error report
stating no errors (that does not revise the base line ss#~e~le},
showing the progress for the month. CONTRACTOR shall submit
one hard copy and one electronic copy. In addition to the Progress
Schedule CONTRACTOR shall include a narrative report of the
months' progress, an explanation of any delays and or
additions/deletions to activities.
It is strongly recommended that CONTRACTOR hire a seasoned
professional, in the use of Primavera P3 to develop and update the
Primavera P3 project schedule.
CONTRACTOR agrees to attend weekly meetings to maintain a
three (3) week look-ahead schedule and monthly be prepared to
discuss any:
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 87
1. Changes of schedule logic to reflect progress of the Work;
2. Explain and provide a narrative for reasons why logic changes
were made;
3. Update to individual subcontractor activities; and
4. Integrate changed work into the schedule.
The Project Schedule shall be the basis of the CONTRACTOR'S
Work and shall be complied with in all respects.
If CONTRACTOR'S Work becomes more than thirty (30) days
behind schedule CONTRACTOR shall be required to submit a
"Make-Up" schedule to PROGRAM MANAGER for review and
acceptance that demonstrates "Catch Up" within thirty (30) days.
CONTRACTOR shall provide, at CONTRACTOR'S cost, the
necessary additional labor and or equipment necessary to make-up
the lost time. Failure to provide a "Make-Up" schedule or vigorously
follow the "Make-Up" schedule shall be reason to default
CONTRACTOR.
Completion dates of the various stages of the Work and shall show
an activity network for the planning and execution of the Work.
Included with the progress schedule shall be a narrative description
of the progress schedule. The progress schedule must be updated
monthly by CONTRACTOR, submitted as part of each Application
for Payment and shall be acceptable to CONSULTANT.
3.1.2. A preliminary schedule of Shop Drawing submissions,; and
3.1.3. A preliminary schedule of values for all of the Work which will
include quantities and prices of items aggregating the Contract
Price and will subdivide the Work into component parts in sufficient
detail, but in no case be greater than two percent (2%) of the Bid
price, to serve as the basis for progress payments during
construction. Such prices will include an appropriate amount of
overhead and profit applicable to each item of work which will be
confirmed in writing by CONTRACTOR at the time of submission.
[X] Such prices shall be broken down to show labor, equipment,
materials and include a proportional amount of overhead and profit.
3.1.4. After award but prior to the submission of the final progress
schedule, CONSULTANT, Contract Administrator and
CONTRACTOR shall meet with all utility owners and secure from
them a schedule of utility relocation, provided, however, neither
CONSULTANT nor CITY shall be responsible for the
nonperformance by the utility owners.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 88
3.2. At a time specified by PROGRAM MANAGER but before CONTRACTOR
starts the work at the Project site, apre-construction conference attended
by CONTRACTOR, CONSULTANT and others as deemed appropriate by
Contract Administrator, will be held to discuss the schedules referred to in
Section 3.1, to discuss procedures for handling Shop Drawings and other
submittals and for processing Applications for Payment, and to establish a
working understanding among the parties as to the Work.
3.3. The finalized progress schedule will be accepted by CONSULTANT only
as providing an orderly progression of the Work to completion within the
Contract Time, but such acceptance shall not constitute acceptance by
"CITY or CONSULTANT of the means or methods of construction or of the
sequencing or scheduling of the Work, and such acceptance will neither
impose on CONSULTANT or CITY responsibility for the progress or
scheduling of the Work nor relieve CONTRACTOR from full responsibility
therefore. The finalized schedule of values pursuant to Section 3.1.3
above must be acceptable to CONSULTANT as to form and substance.
4. Performance Bond and Payment Bond:
Within fifteen (15) calendar days of being notified of the award, CONTRACTOR
shall furnish a Performance Bond and a Payment Bond containing all the
provisions of the Performance Bond and Payment Bond attached hereto as
forms 00710 and 00720.
4.1. Each Bond shall be in the amount of one hundred percent (100%) of the
Contract Price guaranteeing to CITY the completion and performance of
the work covered in such Contract as well as full payment of all suppliers,
laborers, or subcontractors employed pursuant to this Project. Each Bond
shall be with a surety company which is qualified pursuant to Article 5.
4.2. Each Bond shall continue in effect for one year after Final Completion and
acceptance of the work with liability equal to one hundred percent (100%)
of the Contract sum, or an additional bond shall be conditioned that
CONTRACTOR will, upon notification by CITY, correct any defective or
faulty work or materials which appear within one year after Final
Completion of the Contract.
4.3. Pursuant to the requirements of Section 255.05(1)(a), Florida Statutes, as
may be amended from time to time, CONTRACTOR shall ensure that the
bond(s) referenced above shall be recorded in the public records of
Miami-Dade County and provide CITY with evidence of such recording.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 89
5
Qualification of Surety:
5.1. Bid Bonds, Performance Bonds and Payment Bonds over Five Hundred
Thousand Dollars ($500,000.00):
5.1.1. Each bond must be executed by a surety company of recognized
standing, authorized to do business in the State of Florida as
surety, having a resident agent in the State of Florida and having
been in business with a record of successful continuous operation
for at least five (5) years.
5.1.2. The surety company shall hold a current certificate of authority as
acceptable surety on federal bonds in accordance with United
States Department of Treasury Circular 570, Current Revisions. If
the amount of the Bond exceeds the underwriting limitation set forth
in the circular, in order to qualify, the net retention of the surety
company shall not exceed the underwriting limitation in the circular,
and the excess risks must be protected by coinsurance,
reinsurance, or other methods in accordance with Treasury Circular
297, revised September 1, 1978 (31 DFR Section 223.10, Section
223.111). Further, the surety company shall provide CITY with
evidence satisfactory to CITY, that such excess risk has been
protected in an acceptable manner.
5.1.3. The CITY will accept a surety bond from a company with a rating of
B+ or better for bonds up to $2 million, provided, however, that if
any surety company appears on the watch list that is published
quarterly by Intercom of the Office of the Florida Insurance
Commissioner, the CITY shall review and either accept or reject the
surety company based on the financial information available to the
CITY. A surety company that is rejected by the CITY may be
substituted by the Bidder or proposer with a surety company
acceptable to the CITY, only if the bid amount does not increase.
The following sets forth, in general, the acceptable parameters for
bonds:
Policy- Financial
holder's Size
Amount of Bond Ratings Category
500,001 to 1,000,000 B+ Class
1,000,001 to 2,000,000 B+ Class II
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 90
2,000,001 to 5,000,000 A Class III
5,000,001 to 10,000,000 A Class IV
10,000,001 to 25,000,000 A Class V
25,000,001 to 50,000,000 A Class VI
50,000,001 or more A Class VII
6
5.2. For projects of $500,000.00 or less, CITY may accept a Bid Bond,
Performance Bond and Payment Bond from a surety company which has
twice the minimum surplus and capital required by the Florida Insurance
Code at the time the invitation to bid is issued, if the surety company is
otherwise in compliance with the provisions of the Florida Insurance Code,
and if the surety company holds a currently valid certificate of authority
issued by the United States Department of the Treasury under Section
9304 to 9308 of Title 31 of the United States Code, as may be amended
from time to time. The Certificate and Affidavit so certifying (Form 00722)
should be submitted with the Bid Bond and also with the Performance
Bond and Payment Bond.
5.3. More stringent requirements of any grantor agency are set forth within the
Supplemental Conditions. If there are no more stringent requirements, the
provisions of this section shall apply.
Indemnification:
6.1 CONTRACTOR shall indemnify and hold harmless CITY, its officers,
agents, directors, and employees, from liabilities, damages, losses, and
costs, including, but not limited to reasonable attorney's fees, to the extent
caused by the negligence, recklessness or intentional wrongful
misconduct of CONTRACTOR and persons employed or utilized by
CONTRACTOR in the performance of this Agreement. Except as
specifically provided herein, this Agreement does not require
CONTRACTOR to indemnify CITY, its employees, officers, directors, or
agents from any liability, damage, loss, claim, action, or proceeding.
These indemnifications shall survive the term of this Agreement. In the
event that any action or proceeding is brought against CITY by reason of
any such claim or demand, CONTRACTOR shall, upon written notice from
CITY, resist and defend such action or proceeding by counsel satisfactory
to CITY.
6.2 The indemnification provided above shall obligate CONTRACTOR to
defend at its own expense to and through appellate, supplemental or
bankruptcy proceeding, or to provide for such defense, at CITY's option,
any and all claims of liability and all suits and actions of every name and
description covered by Section 6.1 above which may be brought against
CITY whether performed by CONTRACTOR, or persons employed or
utilized by CONTRACTOR.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 91
7. Insurance Requirements:
7.1. Without limiting any of the other obligations or liabilities of
CONTRACTOR, CONTRACTOR shall provide, pay for, and maintain in
force until all of its work to be performed under this Contract has been
completed and accepted by CITY (or for such duration as is otherwise
specified hereinafter), Project specific insurance, provided by
companies satisfactory to the City, covering the CITY, Program Manager
and Consultant and any of their respective employees and agents (the
"Additional Insureds") and the general public, coverages set forth herein.
The obligation of the CONTRACTOR is to provide such adequate
insurance to protect the Additional Insureds from all risks and or
occurrences that may arise or result, directly or indirectly, from the
CONTRACTOR'S work or presence on the jobsite and all risks of injury to
CONTRACTOR'S employees and agents.
This obligation shall not be avoided by allegations of contributory or sole
acts, failure to act, omissions, negligence or fault of the Additional
Insureds.
Each policy of insurance shall waive subrogation against the Additional
Insureds.
7.1.1. Workers' Compensation insurance to apply for all employees in
compliance with the "Workers' Compensation Law" of the State of
Florida and all applicable federal laws. In addition, the policy(ies)
must include:
7.1.1.1. Employers' Liability with a limit of One Million Dollars
($1,000,000.00) Dollars each accident.
7.1.2. Comprehensive General Liability with minimum limits of Two
Million Dollars ($2,000,000.00) per occurrence, combined single
limit for Bodily Injury Liability and Property Damage Liability with a
General aggregate of Two Million Dollars ($2,000,000).
Coverage must be afforded on a form no more restrictive than the
latest edition of the Comprehensive General Liability policy, without
restrictive endorsements, as filed by the Insurance Services Office,
and must include:
[ X ] 7.1.2.1. Premises and/or Operations.
[ X) 7.1.2.2. Independent Contractors.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/I3/07 92
[ X ] 7.1.2.3. Products and/or Completed Operations for contracts
over Fifty Thousand Dollars ($50,000.00)
CONTRACTOR shall maintain in force until at least
three years after completion of all work required under
the Contract, coverage for Products and Completed
Operations, including Broad Form Property Damage.
[ X ] 7.1.2.4. Explosion, Collapse and Underground Coverages.
[ X ] 7.1.2.5. Broad Form Property Damage.
[ X ] 7.1.2.6. Broad Form Contractual Coverage applicable to this
specific Contract, including any hold harmless and/or
indemnification agreement.
[ ] 7.1.2.7. Personal Injury Coverage with Employee and
Contractual Exclusions removed, with minimum limits of
coverage equal to those required for Bodily Injury
Liability and Property Damage Liability.
[ X ] 7.1.2.8. CITY is to be expressly included as an Additional
Insured with respect to liability arising out of operations
performed for CITY by or on behalf of CONTRACTOR
or acts or omissions of CONTRACTOR in connection
with general supervision of such operation.
7.1.3. Business Automobile Liability with minimum limits of Two Million
Dollars ($2,000,000.00) per occurrence, combined single limit for
Bodily Injury Liability and Property Damage Liability. Coverage
must be afforded on a form no more restrictive than the latest
edition of the Business Automobile Liability policy, without
restrictive endorsements, as filed by the Insurance Services Office,
and must include:
7.1.3.1. Owned Vehicles.
7.1.3.2. Hired and Non-Owned Vehicles.
7.1.3.3. Employers' Non-Ownership. (Not Applicable to this bid)
[ X ] 7.1.4. Builder's Risk insurance for the construction of and/or addition to
aboveground buildings or structures is/is not required. The
coverage shall be "All Risk" coverage for 100 percent of the
completed value, covering CITY as a named insured, with a
deductible of not more than Five Thousand Dollars ($5,000.00)
each claim.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 93
7.1.4.1. Waiver of Occupancy Clause or Warranty--Policy must
be specifically endorsed to eliminate any "Occupancy
Clause" or similar warranty or representation that the
building(s), addition(s) or structure(s) in the course of
construction shall not be occupied without specific
endorsement of the policy. The Policy must be
endorsed to provide that the Builder's Risk coverage
will continue to apply until final acceptance of the
building(s), addition(s) or structure(s) by CITY.
[ X ] 7.1.4.2. Flood Insurance--When the buildings or structures are
located within an identified special flood hazard area,
flood insurance must be afforded for the lesser of the
total insurable value of such buildings or structures, or,
the maximum amount of flood insurance coverage
available under the National Flood Program.
[ ] 7.1.5. Installation Floater for the installation of machinery and/or
equipment into an existing structure is/is not required. The
coverage shall be "All Risk" coverage including installation and
transit for 100 percent of the "installed replacement cost value,"
covering CITY as a named insured, with a deductible of not more
than Five Thousand Dollars ($5,000.00) each claim.
7.1.5.1. Cessation of Insurance--Coverage is not to cease and
is to remain in force (subject to cancellation notice) until
final acceptance by CITY.
7.1.5.2. Flood Insurance--When the machinery or equipment is
located within an identified special flood hazard area,
flood insurance must be afforded for the lesser of the
total insurable value of such buildings or structure, or,
the maximum amount of flood insurance coverage
available under the National Flood Program.
7.1.6 Umbrella Liability Policy and shall be written at a limit of two Million
Dollars ($2,000,000) and apply excess over the Employer's Liability,
General Liability, and Automobile Liability primary policies. This policy
shall be written to provide policy limits on a per project aggregate basis.
7.2. If the initial insurance expires prior to the completion of the work, renewal
copies of policies shall be furnished at least thirty (30) days prior to the
date of their expiration.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 94
7.3. Notice of Cancellation and/or
endorsed to provide CITY with at
of cancellation and/or restriction.
8
9
10
Restriction--The policy(ies) must be
least thirty (30) days prior written notice
7.4. CONTRACTOR shall furnish to the City's Risk Manager Certificates of
Insurance or endorsements evidencing the insurance coverage specified
above within fifteen (15) calendar days after notification of award of the
Contract. The required Certificates of Insurance shall name the types of
policies provided, refer specifically to this Contract, and state that such
insurance is as required by this Contract. The Certificate of Insurance
shall be in form similar to and contain the information set forth in Form
00708.
7.5. The official title of the Owner is the City of Miami Beach, Florida. This
official title shall be used in all insurance documentation.
Labor and Materials:
8.1. Unless otherwise provided herein, CONTRACTOR shall provide and pay
for all materials, labor, water, tools, equipment, light, power, transportation
and other facilities and services necessary for the proper execution and
completion of the Work, whether temporary or permanent and whether or
not incorporated or to be incorporated in the Work.
8.2. CONTRACTOR shall at all times enforce strict discipline and good order
among its employees and subcontractors at the Project site and shall not
employ on the Project any unfit person or anyone not skilled in the work to
which they are assigned.
Royalties and Patents:
appurtenances, are hereby included in the prices stipulated in this Contract for
said work.
All fees, royalties, and claims for any invention, or pretended inventions, or
patent of any article, material, arrangement, appliance, or method that may be
used upon or in any manner be connected with the construction of the Work or
Weather:
Extensions to the Contract Time for delays caused by the effects of inclement
weather shall be submitted as a request for a change in the Contract Time
pursuant to Article 40. These time extensions are justified only when rains or
other inclement weather conditions or related adverse soil conditions prevent
CONTRACTOR from productively performing controlling items of work identified
on the accepted schedule or updates resulting in:
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 95
(1) CONTRACTOR being unable to work at least fifty percent (50%) of the
normal workday on controlling items of work identified on the accepted
schedule or updates due to adverse weather conditions; or
(2) CONTRACTOR must make major repairs to the Work damaged by
weather. Providing the damage was not attributable to a failure to perform or
neglect by CONTRACTOR, and providing that CONTRACTOR was unable to
work at least fifty percent (50%) of the normal workday on controlling items of
work identified on the accepted schedule or updates.
(3) CONTRACTOR requests for time extension/s due to weather conditions shall
be submitted to PROGRAM MANAGER no later than twenty four (24) hours
after the occurrence.
11. Permits. Licenses and Impact Fees:
11.1. Except as otherwise provided within the Supplemental Conditions, all
permits and licenses required by federal, state or local laws, rules and
regulations necessary for the prosecution of the Work undertaken by
CONTRACTOR pursuant to this Contract shall be secured and paid for by
CONTRACTOR. It is CONTRACTOR's responsibility to have and maintain
appropriate Certificate(s) of Competency, valid for the Work to be
performed and valid for the jurisdiction in which the Work is to be
performed for all persons working on the Project for whom a Certificate of
Competency is required.
11.2. Impact fees levied by the City and/or Miami-Dade County shall be paid by
CONTRACTOR. CONTRACTOR shall be reimbursed only for the actual
amount of the impact fee levied by the municipality as evidenced by an
invoice or other acceptable documentation issued by the municipality.
Reimbursement to CONTRACTOR in no event shall include profit or
overhead of CONTRACTOR.
12. Resolution of Disputes:
12.1 To prevent all disputes and litigation, it is agreed by the parties hereto that
CONSULTANT shall decide all questions, claims, difficulties and disputes
of whatever nature which may arise relative to the technical interpretation
of the Contract Documents and fulfillment of this Contract as to the
character, quality, amount and value of any work done and materials
furnished, or proposed to be done or furnished under or, by reason of, the
Contract Documents and CONSULTANT's estimates and decisions upon
all claims, questions, difficulties and disputes shall be final and binding to
the extent provided in Section 12.2. Any claim, question, difficulty or
dispute which cannot be resolved by mutual agreement of CITY and
CONTRACTOR shall be submitted to CONSULTANT in writing within
twenty-one (21) calendar days. Unless a different period of time is set
BID NO: 28-06/07 CTTY OF MIAMI BEACH
DATE: 03/13/07 96
forth herein, CONSULTANT shall notify CITY and CONTRACTOR in
writing of CONSULTANT's decision within twenty-one (21) calendar days
from the date of the submission of the claim, question, difficulty or dispute,
unless CONSULTANT requires additional time to gather information or
allow the parties to provide additional information. All nontechnical
administrative disputes shall be determined by the Contract Administrator
pursuant to the time periods provided herein. During the pendency of any
dispute and after a determination thereof, CONTRACTOR, CONSULTANT
and CITY shall act in good faith to mitigate any potential damages
including utilization of construction schedule changes and alternate means
of construction.
12.2.1 In the event the determination of a dispute under this Article is
unacceptable to either party hereto, the party objecting to the
determination must notify the other party in writing within ten (10) days of
receipt of the written determination. The notice must state the basis of the
objection and must be accompanied by a statement that any Contract
Price adjustment claimed is the entire adjustment to which the objecting
party has reason to believe it is entitled to as a result of the determination.
Within sixty (60) days after Final Completion of the Work, the parties shall
participate in mediation to address all objections to any determinations
hereunder and to attempt to prevent litigation. The mediator shall be
mutually agreed upon by the parties. Should any objection not be
resolved in mediation, the parties retain all their legal rights and remedies
provided under State law. A party objecting to a determination specifically
waives all of its rights provided hereunder, including its rights and
remedies under State law, if said party fails to comply in strict accordance
with the requirements of this Article.
13. Inspection of Work:
13.1. CONSULTANT and CITY shall at all times have access to the Work, and
CONTRACTOR shall provide proper facilities for such access and for
inspecting, measuring and testing.
13.1.1. Should the Contract Documents, CONSULTANT's instructions,
any laws, ordinances, or any public authority require any of the
Work to be specially tested or approved, CONTRACTOR shall
give CONSULTANT timely notice of readiness of the Work for
testing. If the testing or approval is to be made by an authority
other than CITY, timely notice shall be given of the date fixed
for such testing. Testing shall be made promptly, and, where
practicable, at the source of supply. If any of the Work should
be covered up without approval or consent of CONSULTANT, it
must, if required by CONSULTANT, be uncovered for
examination and properly restored at CONTRACTOR's
expense.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/1.3/07 97
13.1.2. Reexamination of any of the Work may be ordered by
CONSULTANT with prior written approval by the Contract
Administrator, and if so ordered, the Work must be uncovered
by CONTRACTOR. If such Work is found to be in accordance
with the Contract Documents, CITY shall pay the cost of
reexamination and replacement by means of a Change Order.
If such Work is not in accordance with the Contract Documents,
CONTRACTOR shall pay such cost.
13.2. Inspectors shall have no authority to permit deviations from, nor to relax
any of the provisions of, the Contract Documents nor to delay the Contract
by failure to inspect the materials and work with reasonable promptness
without the written permission or instruction of CONSULTANT.
13.3. The payment of any compensation, whatever may be its character or form,
or the giving of any gratuity or the granting of any favor by CONTRACTOR
to any inspector, directly or indirectly, is strictly prohibited, and any such
act on the part of CONTRACTOR will constitute a breach of this Contract.
14. Superintendence and Supervision:
14.1. The orders of CITY are to be given through PROGRAM MANAGER, which
instructions are to be strictly and promptly followed in every case.
CONTRACTOR shall keep on the Project during its progress, afull-time
competent English speaking superintendent and any necessary
assistants,. all satisfactory to PROGRAM MANAGER. The superintendent
shall not be changed except with the prior written consent of PROGRAM
MANAGER. The superintendent shall not be absent from the site for more
than one (1) day without prior written approval from the PROGRAM
MANAGER. The superintendent shall represent CONTRACTOR and all
directions given to the superintendent shall be as binding as if given to
CONTRACTOR and will be confirmed in writing by CONSULTANT upon
the written request of CONTRACTOR. CONTRACTOR shall give efficient
supervision to the Work, using its best skill and attention.
14.2. Daily, CONTRACTOR's superintendent shall record, at a minimum, the
following information on a Daily Report Form, format to be approved by
PROGRAM MANAGER: the day; date; weather conditions and how any
weather condition affected progress of the Work; time of commencement
of work for the day; the work being performed; materials, labor, personnel,
equipment and subcontractors at the Project site; visitors to the Project
site, including representatives of, CONSULTANT, regulatory
representatives; all safety incidents; any special or unusual conditions or
occurrences encountered; and the time of termination of work for the day.
All information shall be recorded in ink.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 98
Daily reports shall be provided to the PROGRAM MANAGER daily by
noon the following day. Non-compliance with this procedure will result in
delay of payment of the applicable progress application.
A copy of all daily reports shall be kept on the Project site and shall be
available at all times for inspection and copying by CITY and
CONSULTANT.
14.3. The PROGRAM MANAGER, CONTRACTOR and CONSULTANT shall
meet at least weekly or as determined by the PROGRAM MANAGER,
during the course of the Work to review and agree upon the work
performed the prior week and to establish the controlling items of work for
the next three twe weeks. In addition, other issues related to the Work
shall be discussed. The agenda and format for the weekly progress
meeting shall be established by the PROGRAM MANAGER.
CONTRACTOR shall prepare and distribute the weekly Project Meeting
agenda, chair the meetings and distribute minutes and any comments
thereto of each such meeting for review and acknowledgement of their
accuracy by all attendee. Minutes shall be distributed within forty eight
(48) of the weekly meeting and any comments shall be required to be
received back within forty eight (48) hours.
14.4. If CONTRACTOR, in the course of prosecuting the Work, finds any
discrepancy between the Contract Documents and the physical conditions
of the locality, or any errors, omissions, or discrepancies in the
CONTRACT Documents, it shall be CONTRACTOR's duty to immediately
inform PROGRAM MANAGER, in writing using an RFI (format of form to
be provided by PROGRAM MANAGER). PROGRAM MANAGER will
promptly review the same and forward to CONSULTANT if the issue can
not be clarified by PROGRAM MANAGER after reviewing the Project
Documents. It will be the objective under this Contract to respond to RFI's
within 48-hours when ever possible. Any work done after such discovery,
until authorized, will be done at CONTRACTOR's sole risk.
14.5. CONTRACTOR shall supervise and direct the Work competently and
efficiently, devoting such attention thereto and applying such skills and
expertise as may be necessary to perform the Work in accordance with
the Contract Documents. CONTRACTOR shall be solely responsible for
the means, methods, techniques, sequences and procedures of
construction.
15. CITY's Right to Terminate Contract:
15.1. If CONTRACTOR fails to begin the Work within fifteen (15) calendar days
after the Project Initiation Date, or fails to perform the Work with sufficient
workers and equipment or with sufficient materials to insure the prompt
completion of the Work, or shall perform the Work unsuitably, or cause it
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 99
to be rejected as defective and unsuitable, or shall discontinue the
prosecution of the Work pursuant to the accepted schedule or if
CONTRACTOR shall fail to perform any material term set forth in the
Contract Documents or if CONTRACTOR shall become insolvent or be
declared bankrupt, or commit any act of bankruptcy or insolvency, or shall
make an assignment for the benefit of creditors, or from any other cause
whatsoever shall not carry on the Work in an acceptable manner, Contract
Administrator may give notice in writing to CONTRACTOR and its Surety
of such delay, neglect or default, specifying the same. If CONTRACTOR,
within a period of five (5) calendar days after such notice, shall not
proceed in accordance therewith, then CITY may upon written certificate
from CONSULTANT of the fact of such delay, neglect or default and
CONTRACTOR's failure to comply with such notice, terminate the
services of CONTRACTOR, exclude CONTRACTOR from the Project site
and take the prosecution of the Work out of the hands of CONTRACTOR,
and appropriate or use any or all materials and equipment on the Project
site as may be suitable and acceptable. In such case, CONTRACTOR
shall not be entitled to receive any further payment until the Project is
completed. In addition CITY may enter into an agreement for the
completion of the Project according to the terms and provisions of the
Contract Documents, or use such other methods as in CITY's sole opinion
shall be required for the completion of the Project according to the terms
and provisions of the Contract Documents, or use such other methods as
in CITY's sole opinion shall be required for the completion of the Project in
an acceptable manner. All damages, costs and charges incurred by CITY,
together with the costs of completing the Project, shall be deducted from
any monies due or which may become due to CONTRACTOR. In case
the damages and expenses so incurred by CITY shall exceed the unpaid
balance, then CONTRACTOR shall be liable and shall pay to CITY the
amount of said excess.
15.2. If after notice of termination of CONTRACTOR's right to proceed, it is
determined for any reason that CONTRACTOR was not in default, the
rights and obligations of CITY and CONTRACTOR shall be the same as if
the notice of termination had been issued pursuant to the Termination for
Convenience clause as set forth in Section 15.3 below.
15.3. This Contract may be terminated for convenience in writing by CITY upon
ten (10) days written notice to CONTRACTOR (delivered by certified mail,
return receipt requested) of intent to terminate and the date on which such
termination becomes effective. In such case, CONTRACTOR shall be
paid for all work executed and expenses incurred prior to termination in
addition to termination settlement costs reasonably incurred by
CONTRACTOR relating to commitments which had become firm prior to
the termination. Payment shall include reasonable profit for work/services
satisfactorily performed. No payment shall be made for profit for
work/services which have not been performed.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 100
15.4. Upon receipt of Notice of Termination pursuant to Sections 15.1 or 15.3
above, CONTRACTOR shall promptly discontinue all affected work unless
the Notice of Termination directs otherwise and deliver or otherwise make
available to CITY all data, drawings, specifications, reports, estimates,
summaries and such other information as may have been required by the
Contract Documents whether completed or in process.
16. CONTRACTOR's Riaht to Stop Work or Terminate Contract:
Should CONSULTANT fail to review and approve or state in writing reasons for
non-approval of any Application for Payment within twenty (20) days after it is
presented, or if CITY fails either to pay CONTRACTOR within thirty (30) days
after presentation by CONSULTANT of any sum certified by CONSULTANT, or
to notify CONTRACTOR and CONSULTANT in writing of any objection to the
Application for Payment, then CONTRACTOR may, give written notice to CITY
and CONSULTANT of such delay, neglect or default, specifying the same. If
CITY or CONSULTANT (where applicable), within a period of ten (10) calendar
days after such notice shall not remedy the delay, neglect, or default upon which
the notice is based, then CONTRACTOR may stop work or terminate this
Contract and recover from CITY payment for all work executed and reasonable
expenses sustained therein plus reasonable termination expenses. Any
objection made by CITY to an Application for Payment shall be submitted to
CONSULTANT in accordance with the provisions of Article 12 hereof.
17. Assignment:
Neither party hereto shall assign the Contract or any subcontract in whole or in
part without the written consent of the other, nor shall CONTRACTOR assign any
monies due or to become due to it hereunder, without the previous written
consent of the Mayor and City Commission.
18. Rights of Various Interests:
Whenever work being done by CITY's forces or by other contractors is
contiguous to or within the limits of work covered by this Contract, the respective
rights of the various interests involved shall be established by the Contract
Administrator to secure the completion of the various portions of the work in
general harmony.
19. Differing Site Conditions:
In the event that during the course of the Work CONTRACTOR encounters
subsurface or concealed conditions at the Project site which differ materially from
those shown on the Contract Documents and from those ordinarily encountered
and generally recognized as inherent in work of the character called for in the
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 101
Contract Documents; or unknown physical conditions of the Project site, of an
unusual nature, which differ materially from that ordinarily encountered and
generally recognized as inherent in work of the character called for in the
Contract Documents, CONTRACTOR, without disturbing the conditions and
before performing any work affected by such conditions, shall, within twenty-four
(24) hours of their discovery, notify PROGRAM MANAGER and CONSULTANT
in writing of the existence of the aforesaid conditions. CONSULTANT and CITY
shall, within two (2) business days after receipt of CONTRACTOR's written
notice, investigate the site conditions identified by CONTRACTOR. If, in the sole
opinion of CONSULTANT, the conditions do materially so differ and cause an
increase or decrease in CONTRACTOR's cost of, or the time required for, the
performance of any part of the Work, whether or not charged as a result of the
conditions, CONSULTANT shall recommend an equitable adjustment to the
Contract Price, or the Contract Time, or both. If CITY and CONTRACTOR
cannot agree ort an adjustment in the Contract Price or Contract Time, the
adjustment shall be referred to CONSULTANT for determination in accordance
with the provisions of Article 12. Should CONSULTANT determine that the
conditions of the Project site are not so materially different to justify a change in
the terms of the Contract, CONSULTANT shall so notify CITY and
CONTRACTOR in writing, stating the reasons, and such determination shall be
final and binding upon the parties hereto.
No request by CONTRACTOR for an equitable adjustment to the Contract under
this provision shall be allowed unless CONTRACTOR has given written notice in
strict accordance with the provisions of this Article. No request for an equitable
adjustment or change to the Contract Price or Contract Time for differing site
conditions shall be allowed if made after the date certified by CONSULTANT as
the date of substantial completion.
20. Plans and Working Drawings:
CITY, through CONSULTANT, shall have the right to modify the details of the
plans and specifications, to supplement the plans and specifications with
additional plans, drawings or additional information as the Work proceeds, all of
which shall be considered as part of the Contract Documents. In case of
disagreement between the written and graphic portions of the Contract
Documents, the CONTRACTOR shall bring the inconsistency to the attention of
the PROGRAM MANAGER who shall provide the final interpretation after
consulting with the CONSULTANT.
21. CONTRACTOR to Check Plans. Specifications and Data:
CONTRACTOR shall verify all dimensions, quantities and details shown on the
plans, specifications or other data received from CONSULTANT, and shall notify
CONSULTANT of all errors, omissions and discrepancies found therein within
three (3) calendar days of discovery. CONTRACTOR will not be allowed to take
advantage of any error, omission or discrepancy, as full instructions will be
furnished by CONSULTANT. CONTRACTOR shall not be liable for damages
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 1.02
resulting from errors, omissions or discrepancies in the Contract Documents
unless CONTRACTOR recognized such error, omission or discrepancy and
knowingly failed to report it to CONSULTANT.
22. CONTRACTOR's Responsibility for Damages and Accidents:
22.1. CONTRACTOR shall accept full responsibility for the Work against all loss
or damage of whatsoever nature sustained until final acceptance by CITY,
and shall promptly repair any damage done from any cause whatsoever,
except as provided in Article 29.
22.2. CONTRACTOR shall be responsible for all materials, equipment and
supplies pertaining to the Project. In the event any such materials,
equipment and supplies are lost, stolen, damaged or destroyed prior to
final acceptance by CITY, CONTRACTOR shall replace same without cost
to CITY, except as provided in Article 29.
23. Warranty:
CONTRACTOR warrants to CITY that all materials and equipment furnished
under this Contract will be new and that all of the Work will be of good quality,
free from faults and defects and in conformance with the Contract Documents.
All work not conforming to these requirements, including substitutions not
properly approved and authorized, may be considered defective. If required by
CONSULTANT, CONTRACTOR shall furnish satisfactory evidence as to the kind
and quality of materials and equipment. This warranty is not limited by the
provisions of Article 25 herein.
24. Supplementary Drawings:
24.1. When, in the opinion of CONSULTANT, it becomes necessary to explain
the Work to be done more fully, or to illustrate the Work further, or to show
any changes which may be required, supplementary drawings, with
specifications pertaining thereto, will be prepared by CONSULTANT.
24.2. The supplementary drawings shall be binding upon CONTRACTOR with
the same force as the Contract Documents. Where such supplementary
drawings require either less or more than the original quantities of work,
appropriate adjustments shall be made by Change Order.
25. Defective Work:
25.1. CONSULTANT shall have the authority to reject or disapprove work which
CONSULTANT finds to be defective. If required by CONSULTANT,
CONTRACTOR shall promptly either correct all defective work or remove
such defective work and, replace it with non-defective work.
CONTRACTOR shall bear all direct, indirect and consequential costs of
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/1.3/07 l03
such removal or corrections including cost of testing laboratories and
personnel.
25.2. Should CONTRACTOR fail or refuse to remove or correct any defective
work or to make any necessary repairs in accordance with the
requirements of the Contract Documents within the time indicated in
writing by CONSULTANT, CITY shall have the authority to cause the
defective work to be removed or corrected, or make such repairs as may
be necessary at CONTRACTOR's expense. Any expense incurred by
CITY in making such removals, corrections or repairs, shall be paid for out
of any monies due or which may become due to CONTRACTOR, or may
be charged against the Performance Bond. In the event of failure of
CONTRACTOR to make all necessary repairs promptly and fully, CITY
may declare CONTRACTOR in default.
25.3. If, within one (1) year after the date of substantial completion or such
longer period of time as may be prescribed by the terms of any applicable
special warranty required by the Contract Documents, or by any specific
provision of the Contract Documents, any of the Work is found to be
defective or not in accordance with the Contract Documents,
CONTRACTOR, after receipt of written notice from CITY, shall promptly
correct such defective or nonconforming Work within the time specified by
CITY without cost to CITY, to do so. Nothing contained herein shall be
construed to establish a period of limitation with respect to any other
obligation which CONTRACTOR might have under the Contract
Documents including but not limited to, Article 23 hereof and any claim
regarding latent defects.
25.4. Failure to reject any defective work or material shall not in any way
prevent later rejection when such defect is discovered, or obligate CITY to
final acceptance.
26. Taxes:
CONTRACTOR shall pay all applicable sales, consumer, use and other taxes
required by law. CONTRACTOR is responsible for reviewing the pertinent state
statutes involving state taxes and complying with all requirements.
27. Subcontracts:
27.1. CONTRACTOR shall not employ any subcontractor against whom CITY or
CONSULTANT may have a reasonable objection. CONTRACTOR shall
submit in writing a request for approval of any and all Subcontractors prior
to signing a formal Subcontract agreement. CONTRACTOR shall not be
required to employ any subcontractor against whom CONTRACTOR has
a reasonable objection.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 104
27.2. CONTRACTOR shall be fully responsible for all acts and omissions of its
subcontractors and of persons directly or indirectly employed by its
subcontractors and of persons for whose acts any of them may be liable to
the same extent that CONTRACTOR is responsible for the acts and
omissions of persons directly employed by it. Nothing in the Contract
Documents shall create any contractual relationship between any
subcontractor and CITY or any obligation on the part of CITY to pay or to
see the payment of any monies due any subcontractor. CITY or
CONSULTANT may furnish to any subcontractor evidence of amounts
paid to CONTRACTOR on account of specific work performed.
27.3. CONTRACTOR agrees to bind specifically every subcontractor to the
applicable terms and conditions of the Contract Documents for the benefit
of CITY.
[ X ] 27.4. CONTRACTOR shall perform the Work with its own organization,
amounting to not less than Seventy Five (75%) percent of the Contract
Price.
28. Separate Contracts:
28.1. CITY reserves the right to let other contracts in connection with this
Project. CONTRACTOR shall afford other persons reasonable opportunity
for the introduction and storage of their materials and the execution of
their work and shall properly connect and coordinate this Work with theirs.
28.2. If any part of CONTRACTOR's Work depends for proper execution or
results upon the work of any other persons, CONTRACTOR shall inspect
and promptly report to CONSULTANT any defects in such work that
render it unsuitable for such proper execution and results.
CONTRACTOR's failure to so inspect and report shall constitute an
acceptance of the other person's work as fit and proper for the reception of
CONTRACTOR's Work, except as to defects which may develop in other
contractor's work after the execution of CONTRACTOR's.
28.3. CONTRACTOR shall conduct its operations and take all reasonable steps
to coordinate the prosecution of the Work so as to create no interference
or impact on any other contractor on the site. Should such interference or
impact occur, CONTRACTOR shall be liable to the affected contractor for
the cost of such interference or impact.
28.4. To insure the proper execution of subsequent work, CONTRACTOR shall
inspect the work already in place and shall at once report to
CONSULTANT any discrepancy between the executed work and the
requirements of the Contract Documents.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 105
29. Use of Completed Portions:
29.1. CITY shall have the right at its sole option to take possession of and use
any completed or partially completed portions of the Project. Such
possession and use shall not be deemed an acceptance of any of the
Work not completed in accordance with the Contract Documents. If such
possession and use increases the cost of or delays the Work,
CONTRACTOR shall be entitled to reasonable extra compensation, or
reasonable extension of time or both, as recommended by CONSULTANT
and approved by CITY.
29.2. In the event CITY takes possession of any completed or partially
completed portions of the Project, the following shall occur:
29.2.1. CITY shall give notice to CONTRACTOR in writing at least
thirty (30) calendar days prior to CITY's intended occupancy of
a designated area.
29.2.2. CONTRACTOR shall complete to the point of Substantial
Completion the designated area and request inspection and
issuance of a Certificate of Substantial Completion in the form
attached hereto as 00925 from CONSULTANT.
29.2.3. Upon CONSULTANT's issuance of a Certificate of Substantial
Completion, CITY will assume full responsibility for
maintenance, utilities, subsequent damages of CITY and
public, adjustment of insurance coverages and start of warranty
for the occupied area.
29.2.4. CONTRACTOR shall complete all items noted on the
Certificate of Substantial Completion within the time specified
by CONSULTANT on the Certificate of Substantial Completion,
as soon as possible and request final inspection and final
acceptance of the portion of the Work occupied. Upon
completion of final inspection and receipt of an application for
final payment, CONSULTANT shall issue a Final Certificate of
Payment relative to the occupied area.
29.2.5. If CITY finds it necessary to occupy or use a portion or portions
of the Work prior to Substantial Completion thereof, such
occupancy or use shall not commence prior to a time mutually
agreed upon by CITY and CONTRACTOR and to which the
insurance company or companies providing the property
insurance have consented by endorsement to the policy or
policies. Insurance on the unoccupied or unused portion or
portions shall not be canceled or lapsed on account of such
partial occupancy or use. Consent of CONTRACTOR and of
BID NO: 28-06/0'7 CITY OF MIAMI BEACH
DATE: 03/13/07 l 06
the insurance company or companies to such occupancy or
use shall not be unreasonably withheld.
30. Lands for Work:
30.1. CITY shall provide, as may be indicated in the Contract Documents, the
lands upon which the Work is to be performed, rights-of-way and
easements for access thereto and such other lands as are designated by
CITY or the use of CONTRACTOR.
30.2. CONTRACTOR shall provide, at CONTRACTOR's own expense and
without liability to CITY, any additional land and access thereto that may
be required for temporary construction facilities, or for storage of
materials. CONTRACTOR shall furnish to CITY copies of written
permission obtained by CONTRACTOR from the owners of such facilities.
31. Legal Restrictions and Traffic Provisions:
CONTRACTOR shall conform to and obey all applicable laws, regulations, or
ordinances with regard to labor employed, hours of work and CONTRACTOR's
general operations. CONTRACTOR shall conduct its operations so as not to
close any thoroughfare, nor interfere in any way with traffic on railway, highways,
or water, without the prior written consent of the proper authorities.
32. Location and Damage to Existing Facilities, Equipment or Utilities:
32.1. As far as possible, all existing utility lines in the Project area have been
shown on the plans. However, CITY does not guarantee that all lines are
shown, or that the ones indicated are in their true location. It shall be the
CONTRACTORS responsibility to identify and locate all underground
and overhead utility lines or equipment affecting or affected by the Project.
No additional payment will be made to the CONTRACTOR because of
discrepancies in actual and plan location of utilities, and damages suffered
as a result thereof.
32.2. The CONTRACTOR shall notify each utility company involved at least ten
(10) days prior to the start of construction to arrange for positive
underground location, relocation or support of its utility where that utility
may be in conflict with or endangered by the proposed construction.
Relocation of water mains or other utilities for the convenience of the
CONTRACTOR shall be paid by the CONTRACTOR. All charges by utility
companies for temporary support of its utilities shall be paid for by the
CONTRACTOR. All costs of permanent utility relocation to avoid conflict
shall be the responsibility of the utility company involved. No additional
payment will be made to the CONTRACTOR for utility relocations,
whether or not said relocation is necessary to avoid conflict with other
lines.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 107
32.3. The CONTRACTOR shall schedule the work in such a manner that the
work is not delayed by the utility providers relocating or supporting their
utilities. The CONTRACTOR shall coordinate its activities with any and all
public and private utility providers occupying the right-of--way. No
compensation will be paid to the CONTRACTOR for any loss of time or
delay.
33
34
32.4. All overhead, surface or underground structures and utilities encountered
are to be carefully protected from injury or displacement. All damage to
such structures is to be completely repaired within a reasonable time;
needless delay will not be tolerated. The CITY reserves the right to
remedy such damage by ordering outside parties to make such repairs at
the expense of the CONTRACTOR. All such repairs made by the
CONTRACTOR are to be made to the satisfaction of the utility owner. All
damaged utilities must be replaced or fully repaired. All repairs are to be
inspected by the utility owner prior to backfilling.
Value Engineering:
CONTRACTOR may request substitution of materials, articles, pieces of
equipment or any changes that reduce the Contract Price by making such
request to CONSULTANT in writing. CONSULTANT will be the sole judge of
acceptability, and no substitute will be ordered, installed, used or initiated without
CONSULTANT's prior written acceptance which will be evidenced by either a
Change Order or an approved Shop Drawing. However, any substitution
accepted by CONSULTANT shall not result in any increase in the Contract Price
or Contract Time. By making a request for substitution, CONTRACTOR agrees
to pay directly to CONSULTANT all CONSULTANT's fees and charges related to
CONSULTANT's review of the request for substitution, whether or not the
request for substitution is accepted by CONSULTANT. Any substitution
submitted by CONTRACTOR must meet the form, fit, function and life cycle
criteria of the item proposed to be replaced and there must be a net dollar
savings including CONSULTANT review fees and charges. If a substitution is
approved, the net dollar savings shall be shared equally between
CONTRACTOR and CITY and shall be processed as a deductive Change Order.
CITY may require CONTRACTOR to furnish at CONTRACTOR's expense a
special performance guarantee or other surety with respect to any substitute
approved after award of the Contract.
Continuing the Work:
CONTRACTOR shall carry on the Work and adhere to the progress schedule
during all disputes or disagreements with CITY, including disputes or
disagreements concerning a request for a Change Order, a request for a change
in the Contract Price or Contract Time. The Work shall not be delayed or
postponed pending resolution of any disputes or disagreements.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 1.08
35
36
37
Chances in the Work or Terms of Contract Documents:
35.1. Without invalidating the Contract and without notice to any surety CITY
reserves and shall have the right, from time to time to make such
increases, decreases or other changes in the character or quantity of the
Work as may be considered necessary or desirable to complete fully and
acceptably the proposed construction in a satisfactory manner. Any extra
or additional work within the scope of this Project must be accomplished
by means of appropriate Field Orders and Supplemental Instructions or
Change Orders.
35.2. Any changes to the terms of the Contract Documents must be contained
in a written document, executed by the parties hereto, with the same
formality and of equal dignity prior to the initiation of any work reflecting
such change. This section shall not prohibit the issuance of Change
Orders executed only by CITY as hereinafter provided.
Field Orders and Supplemental Instructions:
36.1. The CONSULTANT, through, Contract Administrator shall have the right
to approve and issue Field Orders setting forth written interpretations of
the intent of the Contract Documents and ordering minor changes in Work
execution, providing the Field Order involves no change in the Contract
Price or the Contract Time.
36.2. CONSULTANT shall have
Instructions setting forth
concerning the Contract
Supplemental Instructions
Contract Time.
Change Orders:
the right to approve and issue Supplemental
written orders, instructions, or interpretations
Documents or its performance, provided such
involve no change in the Contract Price or the
37.1. Changes in the quantity or character of the Work within the scope of the
Project which are not properly the subject of Field Orders or Supplemental
Instructions, including all changes resulting in changes in the Contract
Price, or the Contract Time, shall be authorized only by Change Orders
approved in advance and issued in accordance with the provisions of the
CITY.
37.2. All changes to construction contracts must be approved in advance in
accordance with the value of the Change Order or the calculated value of
the time extension. All Change Orders with a value of $25,000 or more
shall be approved in advance by the Mayor and City Commission. All
Change Orders with a value of less than $25,000 shall be approved in
advance by the City Manager or his designee.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 109
37.3. In the event satisfactory adjustment cannot be reached for any item
requiring a change in the Contract Price or Contract Time, and a Change
Order has not been issued, CITY reserves the right at its sole option to
either terminate the Contract as it applies to the items in question and
make such arrangements as may be deemed necessary to complete the
disputed work; or submit the matter in dispute to CONSULTANT as set
forth in Article 12 hereof. During the pendency of the dispute, and upon
receipt of a Change Order approved by CITY, CONTRACTOR shall
promptly proceed with the change in the Work involved and advise the
CONSULTANT and Contract Administrator in writing within seven (7)
calendar days of CONTRACTOR's agreement or disagreement with the
method, if any, provided in the Change Order for determining the
proposed adjustment in the Contract Price or Contract Time.
37.4. On approval of any Contract change increasing the Contract Price,
CONTRACTOR shall ensure that the performance bond and payment
bond are increased so that each reflects the total Contract Price as
increased.
37.5. Under circumstances determined necessary by CITY, Change Orders may
be issued unilaterally by CITY.
38. Value of Change Order Work:
38.1. The value of any work covered by a Change Order or of any claim for an
increase or decrease in the Contract Price shall be determined in one of
the following ways:
~:
38.1.2. By mutual acceptance of a lump sum which CONTRACTOR
and CITY acknowledge contains a component for overhead and
profit.
38.1.3. On the basis of the "cost of work," determined as provided in
Sections 38.2 and 38.3, plus a CONTRACTOR's fee for
overhead and profit which is determined as provided in Section
38.4.
38.2. The term "cost of work" means the sum of all direct costs necessarily
incurred and paid by CONTRACTOR in the proper performance of the
Work described in the Change Order. Except as otherwise may be
agreed to in writing by CITY, such costs shall be in amounts no higher
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 11.0
than those prevailing in the locality of the Project, shall include only the
following items and shall not include any of the costs itemized in Section
38.3.
38.2.1. Payroll costs for employees in the direct employ of
CONTRACTOR in the performance of the work described in the
Change Order under schedules of job classifications agreed
upon by CITY and CONTRACTOR. Payroll costs for employees
not employed full time on the work covered by the Change
Order shall be apportioned on the basis of their time spent on
the work. Payroll costs shall include, but not be limited to,
salaries and wages plus the cost of fringe benefits which shall
include social security contributions, unemployment, excise and
payroll taxes, workers' or workmen's compensation, health and
retirement benefits, bonuses, sick leave, vacation and holiday
pay application thereto. Such employees shall include
superintendents and foremen at the site. The expenses of
performing the work after regular working hours, on Sunday or
legal holidays, shall be included in the above to the extent
authorized by CITY.
38.2.2. Cost of all materials and equipment furnished and incorporated
in the work, including costs of transportation and storage
thereof, and manufacturers' field services required in connection
therewith. All cash discounts shall accrue to CONTRACTOR
unless CITY deposits funds with CONTRACTOR with which to
make payments, in which case the cash discounts shall accrue
to CITY. All trade discounts, rebates and refunds, and all
returns from sale of surplus materials and equipment shall
accrue to CITY and CONTRACTOR shall make provisions so
that they may be obtained. Rentals of all construction
equipment and machinery and the parts thereof whether rented
from CONTRACTOR or others in accordance with rental
agreements approved by CITY with the advice of
CONSULTANT and the costs of transportation, loading,
unloading, installation, dismantling and removal thereof, all in
accordance with the terms of said agreements. The rental of
any such equipment, machinery or parts shall cease when the
use thereof is no longer necessary for the work.
38.2.3. Payments made by CONTRACTOR to Subcontractors for work
performed by Subcontractors. If required by CITY,
CONTRACTOR shall obtain competitive bids from
Subcontractors acceptable to CONTRACTOR and shall deliver
such bids to CITY who will then determine, with the advice of
CONSULTANT, which bids will be accepted. If the Subcontract
provides that the Subcontractor is to be paid on the basis of cost
BID NO: 28-06/07 CITY OF MIAMI BEACH.
DATE: 03/13/07 111
of the work plus a fee, the Subcontractor's cost of the work shall
be determined in the same manner as CONTRACTOR'S cost of
the work. All Subcontractors shall be subject to the other
provisions of the Contract Documents insofar as applicable.
38.2.4. Cost of special consultants, including, but not limited to,
engineers, architects, testing laboratories, and surveyors
employed for services specifically related to the performance of
the work described in the Change Order.
38.2.5. Supplemental costs including the following:
38.2.5.1. The proportion of necessary transportation, travel
and subsistence expenses of CONTRACTOR's
employees incurred in discharge of duties connected
with the work except for local travel to and from the
site of the work.
38.2.5.2. Cost, including transportation and maintenance, of all
materials, supplies, equipment, machinery, applian-
ces, office and temporary facilities at the site and
hand tools not owned by the workmen, which are
consumed in the performance of the work, and cost
less market value of such items used but not
consumed which remains the property of
CONTRACTOR.
38.2.5.3. Sales, use, or similar taxes related to the work, and
for which CONTRACTOR is liable, imposed by any
governmental authority.
38.2.5.4. Deposits lost for causes other than CONTRACTOR's
negligence; royalty payments and fees for permits
and licenses.
38.2.5.5. The cost of utilities, fuel and sanitary facilities at the
site.
38.2.5.6. Receipted minor expenses such as telegrams, long
distance telephone calls, telephone service at the
site, expressage and similar petty cash items in
connection with the work.
38.2.5.7. Cost of premiums for additional bonds and insurance
required because of changes in the work.
38.3. The term "cost of the work" shall not include any of the following:
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 112
38.3.1. Payroll costs and other compensation of CONTRACTOR's
officers, executives, principals (of partnership and sole
proprietorships), general managers, engineers, architects,
estimators, lawyers, auditors, accountants, purchasing and
contracting agents, expediters, timekeepers, clerks and other
personnel employed by CONTRACTOR whether at the site or in
its principal or a branch office for general administration of the
work and not specifically included in the agreed-upon schedule
of job classifications referred to in Section 38.2.1., all of which
are to be considered administrative costs covered by
CONTRACTOR's fee.
38.3.2. Expenses of CONTRACTOR's principal and branch offices
other than CONTRACTOR's office at the site.
38.3.3. Any part of CONTRACTOR's capital expenses, including
interest on CONTRACTOR's capital employed for the work and
charges against CONTRACTOR for delinquent payments.
38.3.4. Cost of premiums for all Bonds and for all insurance whether or
not CONTRACTOR is required by the Contract Documents to
purchase and maintain the same, except for additional bonds
and insurance required because of changes in the work.
38.3.5. Costs due to the negligence or neglect of CONTRACTOR, any
Subcontractors, or anyone directly or indirectly employed by any
of them or for whose acts any of them may be liable, including
but not limited to, the correction of defective work, disposal of
materials or equipment wrongly supplied and making good any
damage to property.
38.3.6. Other overhead or general expense costs of any kind and the
cost of any item not specifically and expressly included in
Section 38.2.
38.4. CONTRACTOR's .fee allowed to CONTRACTOR for overhead and profit
shall be determined as follows:
38.4.1. A mutually acceptable fixed fee or if none can be agreed upon,
38.4.2. A fee based on the following percentages of the various portions
of the cost of the work:
38.4.2.1. For costs incurred under Sections 38.2.1 and
38.2.2, CONTRACTOR's fee shall not exceed ten
percent (10%).
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 1.13
38.4.2.2. For costs incurred under Section 38.2.3,
CONTRACTOR's fee shall not exceed seven and
one half percent (7.5%); and if a subcontract is on
the basis of cost of the work plus a fee, the
maximum allowable to the Subcontractor as a fee
for overhead and profit shall not exceed ten
percent (10%); and
38.4.2.3. No fee shall be payable on the basis of costs
itemized under Sections 38.2.4 and 38.2.5,
(except Section 38.2.5.3), and Section 38.3.
38.5. The amount of credit to be allowed by CONTRACTOR to CITY for any
such change which results in a net decrease in cost, will be the amount of
the actual net decrease. When both additions and credits are involved in
any one change, the combined overhead and profit shall be figured on the
basis of the net increase, if any, however, CONTRACTOR shall not be
entitled to claim lost profits for any Work not performed.
38.6. Whenever the cost of any work is to be determined pursuant to Sections
38.2 and 38.3, CONTRACTOR will submit in a form acceptable to
CONSULTANT an itemized cost breakdown together with the supporting
data.
38.7. Where the quantity of any item of the Work that is covered by a unit price
is increased or decreased by more than twenty percent (20%) from the
quantity of such work indicated in the Contract Documents, an appropriate
Change Order shall be issued to adjust the unit price, if warranted.
38.8. Whenever a change in the Work is to be based on mutual acceptance of a
lump sum, whether the amount is an .addition, credit or no change-in-cost,
CONTRACTOR shall submit an initial cost estimate acceptable to
CONSULTANT and Contract Administrator.
38.8.1. Breakdown shall list the quantities and unit prices for materials,
labor, equipment and other items of cost.
38.8.2. Whenever a change involves CONTRACTOR and one or more
Subcontractors and the change is an increase in the Contract
Price, overhead and profit percentage for CONTRACTOR and
each Subcontractor shall be itemized separately.
38.9. Each Change Order must state within the body of the Change Order
whether it is based upon uni# price, negotiated lump sum, or "cost of the
work."
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 114
39. Notification and Claim for Change of Contract Time or Contract Price:
39.1. Any claim for a change in the Contract Time or Contract Price shall be
made by written notice by CONTRACTOR to the Contract Administrator
and to CONSULTANT within five (5) calendar days of the commencement
of the event giving rise to the claim and stating the general nature and
cause of the claim. Thereafter, within twenty (20) calendar days of the
termination of the event giving rise to the claim, written notice of the extent
of the claim with supporting information and documentation shall be
provided unless CONSULTANT allows an additional period of time to
ascertain more accurate data in support of the claim and such notice shall
be accompanied by CONTRACTOR's written notarized statement that the
adjustment claimed is the entire adjustment to which the CONTRACTOR
has reason to believe it is entitled as a result of the occurrence of said
event. All claims for changes in the Contract Time or Contract Price shall
be determined by CONSULTANT in accordance with Article 12 hereof, if
CITY and CONTRACTOR cannot otherwise agree. IT IS EXPRESSLY
AND SPECIFICALLY AGREED THAT ANY AND ALL CLAIMS FOR
CHANGES TO THE CONTRACT TIME OR CONTRACT PRICE SHALL
BE WAIVED IF NOT SUBMITTED IN STRICT ACCORDANCE WITH
THE REQUIREMENTS OF THIS SECTION.
39.2. The Contract Time will be extended in an amount equal to time lost on
critical Work items due to delays beyond the control of and through no
fault or negligence of CONTRACTOR if a claim is made therefor as
provided in Section 39.1. Such delays shall include, but not be limited to,
acts or neglect by any separate contractor employed by CITY, fires,
floods, labor disputes, epidemics, abnormal weather conditions or acts of
God.
40. No Damages for Delay:
No claim for damages or any claim, other than for an extension of time, shall be
made or asserted against CITY by reason of any delays except as provided
herein. CONTRACTOR shall not be entitled to an increase in the Contract Price
or payment or compensation of any kind from CITY for direct, .indirect,
consequential, impact or other costs, expenses or damages, including but not
limited to costs of acceleration or inefficiency, arising because of delay,
disruption, interference or hindrance from any cause whatsoever, whether such
delay, disruption, interference or hindrance be reasonable or unreasonable,
foreseeable or unforeseeable, or avoidable or unavoidable; provided, however,
that this provision shall not preclude recovery of damages by CONTRACTOR for
actual delays due solely to fraud, bad faith or active interference on the part of
CITY or its CONSULTANT. Otherwise, CONTRACTOR shall be entitled only to
extensions of the Contract Time as the sole and exclusive remedy for such
resulting delay, in accordance with and to the extent specifically provided above.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 11.5
41. Excusable Delay; Compensable; Non-Compensable:
41.1 Excusable Delay. Delay which extends the completion of the Work and
which is caused by circumstances beyond the control of CONTRACTOR
or its subcontractors, suppliers or vendors is Excusable Delay.
CONTRACTOR is entitled to a time extension of the Contract Time for
each day the Work is delayed due to Excusable Delay. CONTRACTOR
shall document its claim for any time extension as provided in Article 39
hereof.
Failure of CONTRACTOR to comply with Article 39 hereof as to any
particular event of delay shall be deemed conclusively to constitute a
waiver, abandonment or relinquishment of any and all claims resulting
from that particular event of delay.
Excusable Delay may be compensable or non-compensable:
(a) Compensable Excusable Delay. Excusable Delay is compensable
when (i) the delay extends the Contract Time, (ii) is caused by
circumstances beyond the control of the CONTRACTOR or its
subcontractors, suppliers or vendors, and (iii) is caused solely by
fraud, bad faith or active interference on the part of CITY or its
agents. In no event shall CONTRACTOR be compensated for
interim delays which do not extend the Contract Time.
CONTRACTOR shall be entitled
Compensable Excusable Delay
CONTRACTOR shall be limited to
pursuant to Article 38 hereof.
to direct and indirect costs for
Direct costs recoverable by
the actual additional costs allowed
CITY and CONTRACTOR recognize and agree that the amount of
CONTRACTOR's precise actual indirect costs for delay in the
performance and completion of the Work is impossible to determine as of
the date of execution of the Contract Documents, and that proof of the
precise amount will be difficult. Therefore, indirect costs recoverable by
the CONTRACTOR shall be liquidated on a daily basis for each day the
Contract Time is delayed due to a Compensable Excusable Delay. These
liquidated indirect costs shall be paid to compensate CONTRACTOR for
all indirect costs caused by a Compensable Excusable Delay and shall
include, but not be limited to, all profit on indirect costs, home office
overhead, acceleration, loss of earnings, loss of productivity, loss of
bonding capacity, loss of opportunity and all other indirect costs incurred
by CONTRACTOR. The amount of liquidated indirect costs recoverable
shall be N/A per day for each calendar day the Contract is delayed
due to a Compensable Excusable Delay.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 l 16
(b) Non-Compensable Excusable Delay. When Excusable Delay is
(i) caused by circumstances beyond the control of CONTRACTOR,
its subcontractors, suppliers and vendors, and is also caused by
circumstances beyond the control of the CITY or CONSULTANT, or
(ii) is caused jointly or concurrently by CONTRACTOR or its
subcontractors, suppliers or vendors and by the CITY or
CONSULTANT, then CONTRACTOR shall be entitled only to a time
extension and no further compensation for the delay.
42. Substantial Completion:
When CONTRACTOR considers that the Work, or a portion thereof designated
by CITY pursuant to Article 29 hereof, has reached Substantial Completion,
CONTRACTOR shall so notify CITY and CONSULTANT in writing.
CONSULTANT and CITY shall then promptly inspect the Work. When
CONSULTANT, on the basis of such an inspection, determines that the Work or
designated portion thereof is substantially complete, it will then prepare a
Certificate of Substantial Completion in the form attached hereto as Form 00925
which shall establish the Date of Substantial Completion; shall state the
responsibilities of CITY and CONTRACTOR for security, maintenance, heat,
utilities, damage to the Work, and insurance; and shall list all Work yet to be
completed to satisfy the requirements of the Contract Documents for Final
Completion. The failure to include any items of corrective work on such list does
not alter the responsibility of CONTRACTOR to complete all of the Work in
accordance with the Contract Documents. Warranties required by the Contract
Documents shall commence on the date of Substantial Completion of the Work
or designated portion thereof unless otherwise provided in the Certificate of
Substantial Completion. The Certificate of Substantial Completion shall be
submitted to CITY through the Contract Administrator and CONTRACTOR for
their written acceptance of the responsibilities assigned to them in such
Certificate.
43. No Interest:
Any monies not paid by CITY when claimed to be due to CONTRACTOR under
this Agreement, including, but not limited to, any and all claims for contract
damages of any type, shall not be subject to interest including, but not limited to
prejudgment interest. However, the provisions of CITY's prompt payment
ordinance, as such relates to timeliness of payment, and the provisions of
Section 218.74(4), Florida Statutes (1989) as such relates to the payment of
interest, shall apply to valid and proper invoices.
44. Shop Drawings:
44.1. CONTRACTOR shall submit Shop Drawings as required by the Technical
Specifications. The purpose of the Shop Drawings is to show the
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 117
suitability, efficiency, technique of manufacture, installation requirements,
details of the item and evidence of its compliance or noncompliance with
the Contract Documents.
44.2. CONTRACTOR shall submit, in his construction schedule, and to
CONSULTANT, a complete list of preliminary data on items for which
Shop Drawings are to be submitted and shall identify the critical items.
Approval of this list by CONSULTANT shall in no way relieve
CONTRACTOR from submitting complete Shop Drawings and providing
materials, equipment, etc., fully in accordance with the Contract
Documents. This procedure is required in order to expedite final approval
of Shop Drawings.
44.3. After the approval of the list of items required in Section 44.2 above,
CONTRACTOR shall promptly request Shop Drawings from the various
manufacturers, fabricators, and suppliers. CONTRACTOR shall include
all shop drawings and other submittals in its certification.
44.4. CONTRACTOR shall thoroughly review and check the Shop Drawings
and each and every copy shall show this approval thereon. In addition,
CONTRACTOR shall highlight the specific item submitted for approval
when submittal ("cut sheet") shows more than one item.
44.5. If the Shop Drawings show or indicate departures from the Contract
requirements, CONTRACTOR shall make specific mention thereof in its
letter of transmittal. Failure to point out such departures shall not relieve
CONTRACTOR from its responsibility to comply with the Contract
Documents.
44.6. CONSULTANT shall review and approve Shop Drawings within fifteen
(15) calendar days from the date received, unless said Drawings are
rejected by CONSULTANT for material reasons. CONSULTANT's
approval of Shop Drawings will be general and shall not relieve
CONTRACTOR of responsibility for the accuracy of such Drawings, nor
for the proper fitting and construction of the work, nor for the furnishing of
materials or work required by the Contract Documents and not indicated
on the Drawings. No work called for by Shop Drawings shall be
performed until the said Drawings have been approved by
CONSULTANT. Approval shall not relieve CONTRACTOR from
responsibility for errors or omissions of any sort on the Shop Drawings.
44.7. No approval will be given to partial submittals of Shop Drawings for items
which interconnect and/or are interdependent where necessary to
properly evaluate the design. It is CONTRACTOR's responsibility to
assemble the Shop Drawings for all such interconnecting and/or
interdependent items, check them and then make one submittal to
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 118
CONSULTANT along with its comments as to compliance,
noncompliance, or features requiring special attention.
44.8. If catalog sheets or prints of manufacturers' standard drawings are
submitted as Shop .Drawings, any additional information or changes on
such drawings shall be typewritten or lettered in ink.
44.9. CONTRACTOR shall submit the number of copies required by
CONSULTANT. Resubmissions of Shop Drawings shall be made in the
same quantity until final approval is obtained.
44.10. CONTRACTOR shall keep one set of Shop Drawings marked with
CONSULTANT's approval at the job site at all times.
44.11 CONTRACTOR will develop and maintain a Submittal Log providing
status of all submittals. An updated copy of the Submittal Log will be
available for discussion at the weekly progress meeting.
45. "As-Built" Documents:
45.1. CONTRACTOR shall maintain an accurate and precise record, on a daily
basis, of the "As-Built" condition of the Work on a specially designated set
of contract documents used solely for the specific purpose. PROGRAM
MANAGER and the CONSULTANT will have the right to inspect the "As-
Built" documents as required. The As-Built documents, shall be signed
and sealed by the CONSULTANT at the end of the Project, shall be
made on reproducible paper and shall be delivered to the PROGRAM
MANAGER prior to, and as a condition of, final payment. In addition to
the paper copy an electronic copy of the "As-Built" Documents shall be
delivered to the CONSULTANT.
45.2. CONTRACTOR shall maintain in a safe place at the Project site one
record copy of all Drawings, Plans, Specifications, Addenda, written
amendments, Change Orders, Field Orders and written interpretations
and clarifications in good order during construction. These record
documents together with all approved samples and a counterpart of all
approved Shop Drawings shall be available at all times to CONSULTANT
for reference.
45.3. Prior to, and as a condition precedent to Final Payment, CONTRACTOR
shall submit to CITY, CONTRACTOR's record drawings or as-built
drawings acceptable to CONSULTANT.
46. Safety and Protection:
46.1. CONTRACTOR shall be solely responsible for initiating, maintaining and
supervising all safety precautions and programs in connection with the
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 119
Project. CONTRACTOR shall take all necessary precautions for the
safety of, and shall provide the necessary protection to prevent damage,
injury or loss to:
CONTRACTOR will be required to provide a Draft copy of its Safety and
Health Manual to the Program Manager, for review and acceptance,
within the fifteen (15) days after award of contract by the City
Commission and the Manual will be part of the submittal required upon
contract execution by the CONTRACTOR and the City. Receipt by the
PROGRAM MANAGER of a satisfactory Safety and Health Manual will be
precedent to issuance of the Second Notice to Proceed.
46.1.1. All employees on the work site and other persons who may be
affected thereby;
46.1.2. All the work and all materials or equipment to be incorporated
therein, whether in storage on or off the Project site; and
46.1.3. Other property at the Project site or adjacent thereto, including
trees, shrubs, lawns, walks, pavements, roadways, structures
and utilities not designated for removal, relocation or
replacement in the course of construction.
46.2. CONTRACTOR shall comply with all applicable laws, ordinances, rules,
regulations and orders of any public body having jurisdiction for the safety
of persons or property or to protect them from damage, injury or loss; and
shall erect and maintain all necessary safeguards for such safety and
protection. CONTRACTOR shall notify owners of adjacent property and
utilities when prosecution of the work may affect them. All damage, injury
or loss to any property referred to in Sections 46.1.2 and 46.1.3 above,
caused directly or indirectly, in whole or in part, by CONTRACTOR, any
Subcontractor or anyone directly or indirectly employed by any of them or
anyone for whose acts any of them may be liable, shall be remedied by
CONTRACTOR. CONTRACTOR's duties and responsibilities for the
safety and protection of the work shall continue until such time as all the
Work is completed and CONSULTANT has issued a notice to CITY and
CONTRACTOR that the Work is acceptable except as otherwise provided
in Article 29 hereof.
46.3. CONTRACTOR shall designate a responsible member of its organization
at the Work site whose duty shall be the prevention of accidents. This
person shall be CONTRACTOR'S superintendent unless otherwise
designated in writing by CONTRACTOR to CITY.
46.4 CONTRACTOR shall be required, and include in its Safety Manual, a set
of "Emergency Procedures" for accidents. Procedure shall be submitted
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 120
to and approved by the PROGRAM MANAGER prior to issue of the 2"d
Notice to Proceed.
[ ] 47. Final Bill of Materials:
CONTRACTOR shall be required to submit to CITY and CONSULTANT a final
bill of materials with unit costs for each bid item for supply of materials in place.
This shall be an itemized list of all materials with a unit cost for each material and
the total shall agree with unit costs established for each Contract item. A Final
Certificate for Payment cannot be issued by CONSULTANT until CONTRACTOR
submits the final bill of materials and CONSULTANT verifies the accuracy of the
units of Work.
48. Payment by CITY for Tests:
Except when otherwise specified in the Contract Documents, the expense of all
tests requested by CONSULTANT shall be borne by CONTRACTOR and
performed by a testing firm chosen by CONSULTANT. For road construction
projects the procedure for making tests required by CONSULTANT will be in
conformance with the most recent edition of the State of Florida, Department of
Transportation Standard Specifications for Road and Bridge Construction. The
cost of any required test which CONTRACTOR fails shall be paid for by
CONTRACTOR.
The City shall hire and pay for the services of a Special Inspector who shall
inspect and test:
• Piling
• Forming, & Reinforcing Materials
• Concrete Material
• Grout Material
• Excavation and Backfill Materials
• Soils, Backfill and Compaction
49. Project Sign:
Any requirements for a project sign shall be as set forth within the Technical
Specifications section.
50. Hurricane Precautions:
50.1. During such periods of time as are designated by the United States
Weather Bureau as being a hurricane warning or alert, the
CONTRACTOR, at no cost to the CITY, shall take all precautions
necessary to secure the Project site in response to all threatened storm
events, regardless of whether the CITY or CONSULTANT has given
notice of same.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 121
50.2. Compliance with any specific hurricane warning or alert precautions will
not constitute additional work.
50.3. Additional work relating to hurricane warning or alert at the Project site
will be addressed by a Change Order in accordance with Section 37,
General Conditions.
50.4. Suspension of the Work caused by a threatened or actual storm event,
regardless of whether the CITY has directed such suspension, will entitle
the CONTRACTOR to additional Contract Time as noncompensable,
excusable delay, and shall not give rise to a claim for compensable delay.
51. Cleaning Up; City's Right to Clean U~
CONTRACTOR shall at all times keep the premises free from accumulation of
waste materials or rubbish caused by its operations. At the completion of the
Project, CONTRACTOR shall remove all its waste materials and rubbish from
and about the Project as well as its tools, construction equipment, machinery and
surplus materials. If CONTRACTOR fails to clean up during the prosecution of
the Work or at the completion of the Work, CITY may do so and the cost thereof
shall be charged to CONTRACTOR. If a dispute arises between CONTRACTOR
and separate contractors as to their responsibility for cleaning up, CITY may
clean up and charge the cost thereof to the contractors responsible therefor as
CONSULTANT shall determine to be just.
52. Removal of Equipment:
In case of termination of this Contract before completion for any cause whatever,
CONTRACTOR, if notified to do so by CITY, shall promptly remove any part or
all of CONTRACTOR's equipment and supplies from the property of CITY, failing
which CITY shall have the right to remove such equipment and supplies at the
expense of CONTRACTOR.
53. Nondiscrimination. Eaual Employment Opportunity, and Americans with
Disabilities Act:
CONTRACTOR shall not unlawfully discriminate against any person in its
operations and activities or in its use or expenditure of funds in fulfilling its
obligations under this Agreement. CONTRACTOR shall affirmatively comply with
all applicable provisions of the Americans with Disabilities Act (ADA) in the
course of providing any services funded by CITY, including Titles I and II of the
ADA (regarding nondiscrimination on the basis of disability), and all applicable
regulations, guidelines, and standards. In addition, CONTRACTOR shall take
affirmative steps to ensure nondiscrimination in employment against disabled
persons.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 122
CONTRACTOR's decisions regarding the delivery of services under this
Agreement shall be made without regard to or consideration of race, age,
religion, color, gender, sexual orientation, national origin, marital status, physical
or mental disability, political affiliation, or any other factor which cannot be
lawfully used as a basis for service delivery.
CONTRACTOR shall not engage in or commit any discriminatory practice in
violation of City of Miami Beach Ordinance No 92.2824 in performing any
services pursuant to this Agreement.
54. Project Records:
CITY shall have the right to inspect and copy, at CITY's expense, the books and
records and accounts of CONTRACTOR which relate in any way to the Project,
and to any claim for additional compensation made by CONTRACTOR, and to
conduct an audit of the financial and accounting records of CONTRACTOR
which relate to the Project and to any claim for additional compensation made by
CONTRACTOR. CONTRACTOR shall retain and make available to CITY all
such books and records and accounts, financial or otherwise, which relate to the
Project and to any claim for a period of three (3) years following Final Completion
of the Project. During the Project and the three (3) year period following Final
Completion of the Project, CONTRACTOR shall provide CITY access to its
books and records upon seventy-two (72) hours written notice.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/l3/07 123
900. SUPPLEMENTARY CONDITIONS:
The following supplementary conditions shall apply to all Work unless specifically
excluded in writing:
900.01 Working Hours:
Contractor, his employees and subcontractors shall Work the standard hours
established for the Project. CONTRACTOR shall notify PROGRAM MANAGER
twenty fours (24) in advance for any day when an exception is required.
900.02 Site Utilization:
i. Contractor shall provide with his Bid a copy of his proposed site
phasing/utilization plan including traffic control. A sample of a Phasing Plan is
shown on drawing No.: A-031 & P2. It should be noted that the construction
fence is the limit of the space that will be made available.
ii. CONTRACTOR shall limit his construction activities, restricting materials
delivery, during the following events at the Miami Beach Convention Center:
a. Miami International Boat Show
2007 - 02/08 through 02/24
2008 -
b. South Florida Auto Show
2007 - 09/28 through 10/15
2008 -
c. Jeweler's International Showcase
2007 -10/20 through 10/23
2008 -
d. National Minority Supplier Development
2007 -10/29
2008 -
e. I.N.S. New Citizens Swearing In
2007 -
2008 -
CONTRACTOR is reminded that he will be required to work around Convention
Center activities and not all dates can be provided at this time.
CONTRACTOR shall include the impact for the above in the Base Line
schedule. No additional comaensation for cost or time will be arovided.
900.03 Photographs
i. CONTRACTOR shall provide, with each monthly pay application 4-sets of 8" x
10" photos, including an aerial, depicting the progress of the work. The photos
shall be for the strict use of the OWNER.
ii. PROGRAM MANAGER shall provide CONTRACTOR direction on a standard
orientation to be used for progress photos
iii. CONTRACTOR shall under no circumstances take or use any photographs of
the Work without the prior written authority of the OWNER.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 124
900.04 Notifcation
i. CONTRACTOR shall set up a notification procedure, to be approved by the
PROGRAM MANAGER, for all concrete pours, testing, grouting and special
inspections that provides Forty Eight (48) hours advance notice.
900.05 Official Correspondence:
i. All official correspondence shall be addressed to: Stephen Baumal -Program
Manager with copies to: CONSULTANT
900.06 Protection of the Work
i. CONTRACTOR shall be responsible to protect the Work until officially accepted
by the CITY.
ii. CONTRACTOR shall be responsible to provide any and all security for the
project, The City's temporary facilities, his employees, equipment, materials and
temporary facilities at the job site. In addition the CONTRACTOR shall provide
insurance for the City's temporary facilities.
900.07 Employee Identification
CONTRACTOR shall develop and implement a procedure, subject to review and
approval by the PROGRAM MANAGER, that requires all employees wear photo
identification badges,
900.08 Project Quality Control
i. CONTRACTOR shall designate one of his staff as the Project Quality Control
(QC) Manager. The QC Manager shall be on site at all times.
ii. CONTRACTOR shall provide a copy of his QC Manual for review and approval
within thirty (30) days from execution of the Contract by both parties hereto.
iii. The Q.C. manual must include formal periodic inspection of all work that
entails completing Observation Reports; Non-Compliance Reports (when
applicable); Receiving, Damage & Shortage Reports. A complete file of all
reports complete with Logs shall be maintained at the site
iv. CONTRACTOR shall require, being part of the Subcontract Agreements
conditions, his Subcontractors to comply with CONTRACTOR'S QC Manual and
procedures.
900.09 List of Deliverables
i. CONTRACTOR shall provide, within fifteen (15) days from Contract Award a
complete list of "Deliverables" required under the Contract.
900.10 Visitors Log
i. CONTRACTOR shall maintain a "Visitors Log" and require all visitors to the
project site to sign the log. This shall include all City inspectors or otherwise.
900.11 Demobilization
i. CONTRACTOR shall request and receive, in ,writing, approval from the
PROGRAM MANAGER prior to de-mobilizing.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/1.3/07 125
900.12 CONTRACTOR to provide at all times an emergency access route, in
compliance with A.D.A. requirements, from the rear emergency exit door (west side) of
City Hall to a point one-hundred (100) feet from the building.
These supplementary conditions shall take precedence over conditions in
Division 1 of the Technical Specifications
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/I3/07 126
00920. ADDITIONAL ARTICLES:
[ ] 1. Prevailing Wage Rate Ordinance. (N/A)
This Project is not federally funded. City of Miami Beach Ordinance No,
94-2960 provides that in all non-federally funded construction contracts in
excess of one million dollars to which the City of Miami Beach is a party,
the rate of wages and fringe benefits, or cash equivalent, for all laborers,
mechanics and apprentices employed by any contractor or subcontractor
on the work covered by the contract, shall not be less than the prevailing
rate of wages and fringe benefit payments or cash equivalence for similar
skills or classifications of work, as established by the Federal Register, in
the City of Miami Beach, Florida. The provisions of this Ordinance shall
not apply to the following projects:
a. water, except water treatment facilities and lift stations;
b. .sewer, except sewage treatment facilities and lift stations;
c. storm drainage;
d. road construction, except bridges or structures requiring
pilings; and
e. beautification projects, which may include resurfacing new
curbs, gutters, pavers, sidewalks, landscaping, new lighting,
bus shelters, bus benches and signage.
[*NOTE: INSERT IF APPLICABLE]
[ ] 2. Federal Grant Projects: (N/A)
2.1. By virtue of the fact that the funding of this Project will be delivered
in full or in part from the United States government through
federal assurances must
follow the grant application in addition to any and all supervening
assurances set forth in Rules and Regulations published in Federal
Register or CFR.
2.2. Clauses, terms or conditions required by federal grantor agency are
hereby attached and made a part of these Contract Documents.
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 127
00922. STATEMENT OF COMPLIANCE
(PREVAILING WAGE RATE ORDINANCE NO. 94-2(9/60) ~1
.~ No. ~:~, Tj r ~ ~a l r~
Contract No. a..~-~ - ~6~~~ Project Title (`-'1v~~,c ~~k%,1 ?., k_,~,~., r~.,~ .art-v
The undersigned CONTRACTOR hereby swears under penalty of perjury that, during
the period covered by the application for payment to which this statement is attached,
all mechanics, laborers, and apprentices, employed or working on the site of the
Project, have been paid at wage rates, and that the wage rates of payments,
contributions, or costs for fringe benefits have not been less than those required by City
of Miami Beach Ordinance No. 94-2960 and the applicable conditi s of the Contract.
Dated Co ~~r'] , 20G'
STATE OF )
SS
COUNTY OF )
---___ ~
~~~ ~r~~ ~s~5~
By: --~ I a.,
~,c llu,, ~C3r~~;rt~i-c,,r,
77 I (Signature) ..~ ~
By: ~`~..C1~\(jJ .r1E~~iCitl ~'~E~~rGe'a'\~
(Print ame and Title)
The foregoing instrument was acknowledged before me this tc~ }~' day of
,~ ~, ~ _ , 20~ , by 11 <., ~ t} ~ 1~ r ~~ r^~Q ,~ who is
,,ersonally known ~ f me' or who has produced as
identification and who did/did not take an oath.
WITN~,~~tt~i~)j~nd and official seal, thi ~~441 day of ~~ 1~`~ ~ f , 20r`/.
~\~,~ ~PpNE C. tij0 ri,~~, „~
=o°e"~e s`~9~ i ature of person taking acknowledgment)
... . * ~ ;
Z ' NDD 491492 : Q . "r • <, ,
. ~~~ ~•
~0'9~~'""" '~Q ~ (N me of -officer taking acknowledgment)
~'f'~~'••.....••'~ ~
'''%Bi~C,~ ~! ~~! ~`~~~~~ (typed, printed or stamped)
(Title or rank)
My commission expires:
BID NO: 25-06/07
DATE: 03/13!07
(Serial number, if any)
CITY OF MIANfI BEACH
1zs
00923. STATEMENT OF COMPLIANCE
(DAVIS BACON ACT)
t'
Contract No. ~ ~' ~-'~/ ~~~
ProjectTitle ~"~~; ~.i ~,~~,~t~ ~;~: F~~",7~c,,~,, C
The undersigned CONTRACTOR hereby swears under penalty of perjury that, during
the period covered by the application for payment to which this statement is attached,
all mechanics, laborers, and apprentices, employed or working on the site of the
Project, have been paid at wage rates, and that the wage rates of payments,
contributions, or costs for fringe benefits have not been less than those required by the
Davis Bacon Act and the applicable conditions of the Contra.
a-------.._ t ; ~I ~
i !, ~^
Dated ~c~,~ , 20 (. rf ~~, ~ , -~, ;-t.~ ~~.:~ 1, c; r'~ ~ i:: ~")C{ t..1 ~ c• ,~~
Co actgr
By: ~ a• ~
~ature) l
(Print Name and Title)
STATE OF )
SS
COUNTY OF )
The foregoing instrument wa;i_~cknowle~ged before me this ~(~ ~, day of
/~ r,~ 20d~, by {`s.~r,~y ~'~C?s'Sa ; ~ who is
;'peso a~fTy"~c~n`~n'1 to me or who has produced as
identification an`d who did/did not take an oath. A
WITNESS my hand and official seal, thi (~ ~_~` day of ~~~ ~ ~ , 20i"~.
~~0~,ys~ ~B '•.: 'y ~(i ature of person taking'acknowledgment)
~~ ~ NDD 491492 ~ '~= ~' A' C.. ~ Xt C
°~ (N me of officer taking acknowledgment)
'~,;9~A~:;;p;:~~~ (typed, printed or stamped)
~l~,A~~e~ ~ IIS! i! N~~l,~
(Title or rank)
(Serial number, if any)
My commission expires:
BID NO: 28-06/0, CITY OF MIAMI BEACI~
DATE: 03/13!0^ 129
00925. CERTIFICATE OF SUBSTANTIAL COMPLETION:
PROJECT:
(name, address)
CONSULTANT:
BID/CONTRACT NUMBER:
TO (CITY):
CONTRACTOR:
CONTRACT FOR:
NOTICE TO PROCEED DATE:
DATE OF ISSUANCE:
PROJECT OR DESIGNATED PORTION SHALL INCLUDE:
The Work performed under this Contract has been reviewed and found to be
substantially complete and all documents required to be submitted by CONTRACTOR
under the Contract Documents have been received and accepted. The Date of
Substantial Completion of the Project or portion thereof designated above is hereby
established as
which is also the date of commencement of applicable warranties required by the
Contract Documents, except as stated below.
DEFINITION OF DATE OF SUBSTANTIAL COMPLETION
The Date of Substantial Completion of the Work or portion
thereof designated by CITY is the date certified by
CONSULTANT when all conditions and requirements of
permits and regulatory agencies have been satisfied and the
Work, is sufficiently complete in accordance with the
Contract Documents, so the Project is available for beneficial
occupancy by CITY. A Certificate of Occupancy must be
issued for Substantial Completion to be achieved, however,
the issuance of a Certificate of Occupancy or the date
thereof are not to be determinative of the achievement or
date of Substantial Completion.
BID NO: 28-06/07 CITY OF MIAMI BEACN
DATE: 03/13/07 130
A list of items to be completed or corrected, prepared by CONSULTANT and approved
by CITY, is attached hereto. The failure to include any items on such list does not alter
the responsibility of CONTRACTOR to complete all work in accordance with the
Contract Documents. The date of commencement of warranties for items on the
attached list will be the date of final payment unless otherwise agreed in writing.
CONSULTANT BY DATE
In accordance with Section 2.2 of the Contract, CONTRACTOR will complete or correct
the work on the list of items attached hereto within from the
above Date of Substantial Completion.
CONSULTANT BY DATE
CITY, through the Contract Administrator, accepts the Work or portion thereof
designated by CITY as substantially complete and will assume full possession thereof at
(time) on (date).
City of Miami Beach, Florida
By Contract Administrator Date
The responsibilities of CITY and CONTRACTOR for security, maintenance, heat,
utilities, damage to the work and insurance shall be as follows:
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 131
00926. FINAL CERTIFICATE OF PAYMENT:
PROJECT:
(name, address)
CONSULTANT:
BID/CONTRACT NUMBER:
TO (CITY):
CONTRACTOR:
CONTRACT FOR:
NOTICE TO PROCEED DATE:
DATE OF ISSUANCE:
All conditions or requirements of any permits or regulatory agencies have been
satisfied. The documents .required by Section 5.2 of the Contract, and the final bill of
materials, if required, have been received and accepted. The Work required by the
Contract Documents has been reviewed and the undersigned certifies that the Work,
including minor corrective work, has been completed in accordance with the provision of
the Contract Documents and is accepted under the terms and conditions thereof.
CONSULTANT
BY
DATE
CITY, through the Contract Administrator, accepts the work as fully complete and will
assume full possession thereof at
(date).
City of Miami Beach, Florida
(time)
By Contract Administrator
Date
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 132
00930. FORM OF FINAL RECEIPT:
(The following form will be used to show receipt of final payment for this Contract.]
FINAL RECEIPT FOR CONTRACT NO.
Received this day of
of Miami Beach, Florida, the sum of
20 ,from City
Dollars
($ ) as full and final payment to CONTRACTOR for all work and materials
for the Project described as:
This sum includes full and final payment for all extra work and material and all
incidentals.
CONTRACTOR hereby indemnifies and releases CITY from all liens and claims
whatsoever arising out of the Contract and Project.
CONTRACTOR hereby certifies that all persons doing work upon or furnishing
materials or supplies for the Project have been paid in full. In lieu of this certification
regarding payment for work, materials and supplies, CONTRACTOR may submit a
consent of surety to final payment in a form satisfactory to CITY.
CONTRACTOR further certifies that all taxes imposed by Chapter 212, Florida
Statutes (Sales and Use Tax Act), as amended, have been paid and discharged.
[If incorporated sign below.]
CONTRACTOR
ATTEST:
(Secretary)
(Corporate Seal)
F:\PU RC1$ALL\Roman\boilerplate\blank
(Name of Corporation)
By:
(Signature)
(Print Name and Title)
day of , 20
constructionbid Bid.doc
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 133
[If not incorporated sign below.]
WITNESSES:
CONTRACTOR
(Name of Firm)
By:
(Signature)
(Print Name and Title)
day of , 20
F:\PURC\$ALL\Roman\boilerplate\blank constructionbidBid.doc
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 03/13/07 134
[ X ] 00950. DRAWINGS INDEX:
I. Specifications/Drawings for the MULTIPURPOSE MUNICIPAL PARKING
FACILITY haves been prepared by:
PERKINS + WILL ARCHITECTS, INC.
999 Ponce De Leon Boulevard, Suite 915
Coral Gables, Florida 33134
Tel.: 305.569.1333
Fax.:305.569.1334
Plans and Specifications for this project are available in digital format. Please call
the City of Miami Beach Procurement Division at 305-673-7490 to secure a CD
copy of the Plans and Specifications. The cost for the plans and specifications
CD is $10.00, company checks and cash accepted no credit cards please.
A list of drawings is identified on drawing No.: G-001 Drawing Index.
Drawings:
Cover Sheet SSI-001 Ref. Only
G-001 A-031-P2 Ref. Only
G-002 A100 -Ref. Only
C-100 A101 -Ref. Only
C-101 E-101
C-102 Survey Sheet 1 Of 3
C-103 Survey Sheet 2 of 3
C-104 Survey Sheet 3 of 3
C-105
C-106
C-107
C-108
C-109
C-110
C-111
C-112
C-113
C-114
C-115
C-116
C-117
C-118
C-119
c-120
C-121
C-122
C-123
C-124
C-125
C-126
BID NO: 289-06/07 CITY OF MIAMI BEACH
DATE: 03/1.3/06 135
01000. ADDENDA AND MODIFICATIONS:
All addenda and other modifications made prior to the
opening shall be issued as separate documents identified
Contract Documents. (Please see page 138)
time and date of bid
as Addendums to the
BID NO: 289-06/07 CITY OF MIAMI BEACH
DATE: 03/13/06 1.36
02000. TECHNICAL SPECIFICATIONS:
Plans and Specifications for this project are available in digital format. Please call the
City of Miami Beach Procurement Division at 305-673-7490 to secure a CD copy of the
Plans and Specifications. The cost for the plans and specifications CD is $10.00,
company checks and cash accepted no credit cards please.
Specification Divisions:
Division 1
01 330
01 400
01 420
01 500
01 524
01 600
01 700
01 731
Division 2
02 080
02 201
02 221
02 230
02 240
02 260
02 300
02 315
02 510
02 530-
02 584
02 630
02 630-S 1
02 741
02 751
02 764
BID NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 02/14/07 137
04000. ACKNOWLEDGEMENT OF ADDENDA
INVITATION FOR BID NO. 28-06/07
FOR MULTIPURPOSE MUNICIPAL PARKING FACILITY
BID PACKAGE 01 -UNDERGROUND UTILITIES
Directions: Complete Part I or Part II, whichever applies.
Part I: Listed below are the dates of issue for each Addendum received in connection
with this Bid: °-~
/~ - ~~ i
Addendum No. 1, Dated 1 ~ r
Addendum No. 2, Dated r~~~ ~ /~r~
Addendum No. 3, Dated
Addendum No. 4, Dated
Addendum No. 5, Dated
Part II: No addendum was received in connection with this Bid.
Verified with Procurement staff
Name of Staff
Bidders- Name
Signature
Date
Date
BID NO: 28-06/07 CITY OF MIAMI BEACH
DA TF.: 02/l 4/07 l 38
06000. SUB-CONTRACTOR LISTING INFORMATION
INVITATION FOR BID NO. 28-06/07
FOR MULTIPURPOSE MUNICIPAL PARKING FACILITY
BID PACKAGE 01 -UNDERGROUND UTILITIES
PROPOSED SUB-CONTRACTORS PROVIDING SERVICES TO THIS PROJECT
performed
(Telephone and fax no.)
Name:
Tel:
Fax:
Name:
Tel:
Fax:
Name:
Tel:
Fax:
Name:
Tel:
Fax:
Name:
Tel:
Fax:
Name:
Tel:
Fax:
(Attach additional forms if necessary)
B[D NO: 28-06/07 CITY OF MIAMI BEACH
DATE: 02/14/07 139