Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Change Orders A, B, C and D
EXI: The Widener Building, Mezzanine One South Penn Square Philadelphia, PA 19107-3502 T 215 636 9999 F 215 636 9989 HILLIER.COM July 2, 2007 iIBIT A Princeton New York Philadelphia Washington Dallas Mr. Fernando Vazquez City of Miami Beach 1700 Convention Center Drive Miami Beach, FL 33139 RE: GABLE REQUEST FOR CHANGE ORDERS A, B, C and D Dear Fernando, HillierA~cHITECTURE I have reviewed the final Change Order Requests submitted by Gable Signs in regards to the Citywide Wayfinding Program. Based on our previous correspondences and a review of the information provided to date, we recommend the City approve the following Change Orders and proceed with issuing the 2"d Approval to Proceed with the project. CO. A Engineering (Design /Quantity Changes ;64,153.02 CO. B Solar Power Supply ; 8,102.27 CO .C Sign Modifications (Sign TypeslReflectivity) ; 59,230.32 CO. D Project Delays ; 227,025.00 Time Extension 90 days (Revised tota1240 cal. days) Project Schedule: Based on an approval of these Change Orders on July 11, 2007, the following project schedule shall be met by the contractor; July 18, 2007 2nd Approval to Proceed issued to contractor by the City of Miami Beach (240 day time limit begins) March 14, 2008 Project Complete (240 days time limit ends) The contractor is responsible for providing, within 10 days of the 2"d Approval to proceed (est. July 28~'), a detailed construction schedule, including all sequencing of tasks. If you have any questions or require additional information, please do not hesitate to contact me. Sincerely, ~' 8"' John F. Bosio Associate Principal ARCHITECTURE INTERIOR ARCHITECTURE HISTORIC: PRESERVATION URBAN UESIGNIPIANNING GRAPHIC DESIGN =_= Document G701TM - 2001 Change Order PROJECT (Name and address): CHANGE ORDER NUMBER: A OWNER: City of Miami Beach -Own G703 DATE: July 23, 2007 ARCHITECT: City of Miami Beach - Wayfinding TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: CONTRACTOR: ^ Gable Signs & Graphics, Inc. CONTRACT DATE: August 23, 2005 FIELD: ^ 7440 Fort Smallwood Road Baltimore, MD 21226 CONTRACT FOR: General Construction OTHER: ^ THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Constnuction Change Directives) C/O #2 The original Contract Sum was $ 1,476,623.62 The net change by previously authorized Change Orders $ 0.00 The Contract Sum prior to this Change Order was $ 1,476,623.62 The Contract Sum will be increased by this Change Order in the amount of $ 64,153.02 The new Contract Sum including this Change Order will be $ 1,540,776.64 The Contract Time will be unchanged by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is NOTE: This Change Order does no[ include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Hillier Architecture Gable_Signs & Graphics, Inc. City of Miami Beach ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (Firm name) One South Penn Square, Philadelphia, PA 19107 RESS B ignature) J hn Bosio 7440 Fort Smallwood Road, Baltimore, MD 21226 1700 FL Dr, Miami (Typed name) g.?.v7 DATE ADDRESS s~~!.~d"'riw BY g zzre Jeffrey A. Davis (Typed name) ~s~~~c-~ DATE BY (Signa Fernando Vazquez (Typed name) DATE KATHRYN L. BERRY NOTARY PUBLIC ANNE ARUNDEL COUNTY MARYLAND M Comm~sion Expires Ju 17, 2008 AIA Documertt G701TM -2001. Copyright ©1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIAx Document, or any portion of ii, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 14:58:24 on 08/02/2007 under Order No.1000281649_1 which expires on 1/23/2008, and is not for resale. User Notes: (2105927929) Change Order Proposal A Original Sales Order #: 17614 Change Order Date: June 14, 2007 (rev) To: City of Miami Beach Fernando Vazquez 1700 Convention Ctr Drive Miami Beach, FL 33139 Site Store Reference: City of Miami Beach 1700 Convention Ctr Drive Miami Beach, FL 33139 EngineeringtDesigntCiuantlty Changes r - -. GO#2 1 Break-Away Design >break-away design changed due to regulations for complying with AASHTO and 72,Q42.00 72,042.00 FDOT guidelines. CO#2 1 Add/Credit to Quantities >original qty's modified from original contract (75,670.53) (75,670.53) CO#2 1 Add'I Poles >Some pole mounted signs required new poles as location did not provide a mounting 9,159.24 9,159.24 surface Cb#2 1 Engineer Changes >modificetions to original design specs to allow for wlndload calculations 53,050.08 53,050.08 >increasing pole diameters and increasing waN thickness CO#2 1 Add'I Field Engineering >Add'I field engineering for existing light poles {per request of City) 5,000.00 5,000.00 Subtotal: $ 63,580.79 Add'I Performance Bond $ 572.23 Total: $ 64,153.02 Notes & Qualiflcatlons 1. Additional Engineering for light poles is for City's request to calculate load conditions on pole after sign is installed. Actual engineering of sign and attachment method was inGuded in original coniract. This request is above and beyond typical engineering requirements for signage as it is an existing structure and was not outlined in bid contract City of Miami Beach By F V z Signature Date ~~~~~~ Gable Signs and Graphics, Inc. By: Jeffre rLA. Davis, Sr. Project Manager Signature R Date ~ ~ i ~G~? >~ ~ ® TM =_ Document G101 - 2001 Change Order PROJECT (Name and address): CHANGE ORDER NUMBER: B City of Miami Beach -Own G703 City of Miami Beach - Wayfinding TO CONTRACTOR (Name and address): Gable Signs & Graphics, [nc. 7440 Fort Smallwood Road Baltimore, MD 21226 DATE:JuIy 23,2007 ARCHITECT'S PROJECT NUMBER: CONTRACT DATE: August 23, 2005 CONTRACT FOR: General Construction OWNER: ARCHITECT: CONTRACTOR: ^ FIELD: ^ OTHER: ^ THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any amdisputed amount attributable to previously executed Construction Change Directives) C/O #3 The original Contract Sum was $ 1,476,623.62 The net change by previously authorized Change Orders $ 64,153.02 The Contract Sum prior to this Change Order was $ 1,540,776.64 The Contract Sum will be increased by this Change Order in the amount of $ 8,102.27 The new Contract Sum including this Change Order will be $ 1,548,878.91 The Contract Time will be unchanged by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Hillier Architecture Gable Signs & Graphics, Inc. City of Miami Beach ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (Firm name) One South Penn Square, Philadelphia, PA ADDRESS 7440 Fort Smallwood Road, Baltimore, 1700 Convention~~f Dr, Miami MD 21226 Beach, FL 3~.k3~ / g ttre BY Jeffrey A. Davis Fernando Vazquez (Typed name) (Typed name) 8 ~ ~'' o-t ~~ ~a~ DATE DATE KATHRYN L. BERRY NOTARY PUBLIC ANNE ARUNDEL COU~JTY MARYLAND My Commission Expires J~no 1 ~7, 2008 r ~ ~ ~% ~,,~!~,"i/I/'~ l~' ~'~~')~ ' AIA Document G701TM - 2001. Copyright ©1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIAg Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:03:26 on 08/02/2007 under Order No.1000281649_i which expires on 1 /23/2008, and is not for resale. User Notes: (706578960) ~. ~ ~ 1 DATE Change Order Proposal B Original Sales Order #: 17614 Change Order Date: April 6, 2007 To: City of Miami Beach Fernando Vazquez 1700 Convention Ctr Drive Miami Beach, FL 33139 Site Store Reference: City of Miami Beach 1700 Convention Ctr Drive Miami Beach, FL 33139 Solar Power Supply i 1 • . Gate.4 Location . -• >Supply (1) freestanding solar panel unit w/ dusk activated timer5480 features: (1) 82• x ae• photocell 5,480.00 5,4so.0o (1) DC to 115v AC inverter unit provkies 120v power to {t) spolNght fixture for 7 hours 2 1 Installation >suppiy 3" gaWanized steel pole and install into typical footer with concrete beckfill. >installation of solar unit to pole 1,600.00 1,600.00 >elecirical connections to service box 3 1 On-Site Supervision/Training >SEPCO representative on-site to ensure accurate installation and trouble shooting 600.00 6D0.00 a 1 Shipping >ahipping & handNng of (1) solar panel udt 350.00 350A0 Subtotal: $ 8,030.00 Add'I Performance Bond $ 72.27 Total: ~ 8,102.27 Notes ~ ~ualiflcations 1. Price does not indude arty applicable taxes and wail be additional it required 2. AN work hours based on nonnai work conditions 3. Cky to designate exact location of solar panels in field 4. Delivery based on shipping & handling of (1) unit only. Cit~- of Miami Beach By ando Va ez Signature Date Gable Signs and Graphics, inc. By: Jeffrey A. Davis. Sr. Project Manager 51{~nature r ~ ~ . Date - 2- CU`? +_ =_= Document G701TM - 2001 Change Order PROJECT (Name and address): CHANGE ORDER NUMBER: C OWNER: City of Miami Beach -Own G703 DATE: July 23, 2007 ARCHITECT: City of Miami Beach - Wayfinding TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: CONTRACTOR: ^ Gable Signs & Graphics, Inc. CONTRACT DATE: August 23, 2005 FIELD: ^ 7440 Fort Smallwood Road CONTRACT FOR: General Construction Baltimore, MD 21226 OTHER: ^ THE CONTRACT IS CHANGED AS FOLLOWS: (Lnclade, where applicable, any amdispnted amount attributable to previously executed Construction Change Directives) C/O #5 The original Contract Sum was $ 1,476,623.62 The net change by previously authorized Change Orders $ 72,255.29 The Contract Sum prior to this Change Order was $ 1,548,878.91 The Contract Sum will be increased by this Change Order in the amount of $ 59,230.32 The new Contract Sum including this Change Order will be $ 1,608,109.23 The Contract Time will be unchanged by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Hillier Architecture Gable Signs & Graphics, Inc. City of Miami Beach ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (Firm name) One South Penn Square, Philadelphia, PA 19107 RESS B (i a rre) ohn Bosio (Typed name) ~. ~ v 7 7440 Fort Smallwood Road, Baltimore, MD 21226 ADDRESS BY ( g tre Jeffrey A. Davis (Typed name) ~~~~~~ DATE 1700 Convention CeJ~~ r, Miami Beach, FL 33139 / BY (Typed name) Fz3~ ~L ~ DATE DATE KATH~iYN L. ~~REtY NOTARY PUBLIC ANNE ARUNDEL COUNTY MARYLAND My Commission Expires Jt~ 17, 2008 AIA Document G701TM - 2001. Copyright ©1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIAa Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIAx Document. or any portion of it. may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:04:07 on 08/02/2007 under Order No.1000281649_1 which expires on 1 /23/2008, and is not for resale. User Notes: (4076593341) Change Order Proposal C Original Sales Order #: 17614 Change Order Date: November 27, 2006 To: Ciry of Miami Beach Fernando Vazquez 1700 Convention Ctr Drive Miami beach, FL 33139 Slte Store Reference: City of Miami Beach 1700 Convention Ctr Drive Miami beach, FL 33139 18,987.00 >All VDIR signs to be changed to the following: VDIR.1 to VDIR.5 VDIR.2 to VDIR.B VDIR.3 to VDIR.7 VDiR.4 to VDIR.B 2 1 Custom Reflective Background 39,71 >3M custom color matched reflective scothcal vinyl background for VDIR and Zone Signs {price is same for 3m Hiph Intensity but cdor may vary due to Hmited dyes available for fhls produU. } Subtotal: ~ 58,702.00 Add'I P&P Bonds: S 528.32 Grand Total: S 59,230.32 Notes S Qualiflcatlons 1. VDIR signs shown in ftem #2 are inclusive of the total cost difference from the contract amount as well as additional labor hours for Gable Signs' engineering department to change all copy layouts over to the corresponding sign type. 2. 3M High Intensity Reflective Vinyl and 3M Engineer Grade Vinyl have limited inks available for matching exact custom colors. If speaal inks are required to match color from what is available for each brand, 3M will not honor its warranty for this product City of Miami Beach By Fem V uez Signature Date Gable Signs and Graphics, Inc. By: Jeffrey A. Davis. Sr. Project Manager Signature ,~% ~.~~ -T Date ~7~i?~r~ 7 ® TM =_= Document G701 - 2001 Change Order PROJECT (Name and address): CHANGE ORDER NUMBER: D OWNER: City of Miami Beach -Own G703 DATE: July 23, 2007 ARCHITECT: City of Miami Beach - Wayfinding TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: CONTRACTOR: ^ Gable Signs & Graphics, Inc. CONTRACT DATE: August 23, 2005 FIELD: ^ 7440 Fort Smallwood Road CONTRACT FOR: General Construction OTHER Baltimore, MD 21226 : ^ THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) C/O #1 The original Contract Sum was $ 1,476,623.62 The net change by previously authorized Change Orders $ 131,485.61 The Contract Sum prior to this Change Order was $ 1,608,109.23 The Contract Sum will be increased by this Change Order in the amount of $ 227,025.00 The new Contract Sum including this Change Order will be $ 1,835,134.23 The Contract Time will be unchanged by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Hillier Architecture Gable Signs & Graphics, Inc. City of Miami Beach ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (Firm name) One South Penn Square, Philadelphia, PA 7440 For[ Smallwood Road, Baltimore, MD 21226 1700 Convention er r, Miami Beach, FL 33,1.3 DATE ADDRESS f - BY ig w Jeffrey A. Davis (Typed name) ~ ~ ~ Io-~ DATE ADDRESS BY (Signal Fernando Vazquez (Typed name) 81~1~"~ DATE KATHRYN L. BERRY NOTARY PUBLIC ANNE ARUNDEL C' ';_ ```f MARYLA"' :~ My Commission Ex~~'i _.: •_ _ ~ 17, 2008 I AIA Document G701TM - 2001. Copyright ©1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA` Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document. ar any 1 portion of it, may result in severe civil and criminal penalties.. and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:09:21 on 08/02/2007 under Order No.1000281649_t which expires on 1/23/2008, and is not for resale. User Notes: (3687120855) Change Order Proposal D Original Sales Order #: 17614 Change Order Date: June 29, 2007 To: City of Miami Beach Fernando Vazquez 1700 Convention Ctr Drive Miami beach, Ft_ 33139 Slte Store Reference: City of Miami Beach 1700 Convention Ctr Drive Miami beach, FL 33139 Project Delays Orig 1 Original Contract >original oontred total based on faMicatio~nstallation of entire project at same time 823.62 476 62 1 476 623 1 , , . , , and completed by Jan OB >inciudes maintenance contract CO#1 1 Rroject Delays >Project has Dean delayed for a period of 12 months. Due to an increase in rew 225,000.00 225,000.00 materials, additional charges ere to be appNed to contred. CO#1 1 Additional Project Delays >Dalays continuing pest the antiapated May 200!3 release for fabrication as proposed in Soenario Prianp submittal 84,000.00 84,000.00 >Theae delays breakdown to approx. 514,000/month from Juna 2006 through December 20013 CO#1 1 Additional Project Delay Credit >This is an incentive credit to expedite the second notice to proceed >This notice to proceed needs to allow for Gable Signs to submit progress payments (84,000.00) (84,000.00) for work completed in-house as opposed to a completely finished and instaNed product Subtotal: $ 225,000.00 Add'1 Performance Bond $ 2,025.00 Total: S 227,025.00 Notes 8 Qualifications 1. Additional performance & payment bond required to cover new contract total is included in the revised pricing and is based of Gable Signs' bonding rate. 2. Pricing for this change order can be referenced in the Pricing Scenario submittal dated December 12, 2005. Two scenarios were presented as a comparison before proceeding with project. Price above reflects the scenario #2. 3. Contract fabrication time will need to be based off a schedule that Gable Signs w41 submit at the issuance of the second notice to proceed. This is due to re-scheduling production into a fully booked fabrication facility (see attached time extension request) Cit~- of Miami Bea BY Signature ~-,~I _ Date ~ 1~ Gable Signs and Graphics, Inc. By: iP A Davis Sr Project Manager Signature ..f' r ~, Date '7 '2.- ~` _~ C~S~ M C#AI1i'~~MtC 3. `MC ~.~,~..~ Miami Beach Wayfinding -Time Extension Request (Change Order D) June 28, 2007 Fernando Vasquez City of Miami Beach City Hall 1700 Convention Ctr. Drive Miami Beach, FL 33139 This is a formal request for time extension on the Miami Beach Wayfinding Project. This request comes from an extensive delay in execution of the contract due to permit and contractual changes and will become part of the Change Order D (Delay Charges) submittal. Gable Signs requests that a time extension of 90 calendar days be added to our contract and will become effective based on the issuance date of the Second Notice to Proceed. Below are the conditions based on the need for this request: 1. Second Notice to Proceed is occurring over 1-1/2 years past the original scheduled start date. 2. Manufacturing facility is back-logged with current projects already approved for production. Due to the significant time increase for this Project, GableSigns will not make any claim for and will not be entitled to any liquidated savings, as defined in Section 00600 Contract, of amended Article 2.6 Savings found on page 46 of the contract documents. Sincerely, Jeffrey A. Davis Sr. Project Manager