HomeMy WebLinkAboutAmendment 2 with Jacobs Edwards & Kelcey, Inc.~~~' a - ~s ~ 7/
AMENDMENT NO. 11
TO THE PROFESSIONAL LANDSCAPE ARCHITECTURAL
AND ENGINEERING SERVICES AGREEMENT
BETWEEN
THE CITY OF MIAMI BEACH, FLORIDA
AND
JACOBS EDWARDS AND KELCEY, INC,
FORMERLY KNOWN AS EDWARDS AND KELCEY, INC, DATED NOVEMBER 21, 2002
FOR A LUMP SUM AMOUNT OF $14,519 FOR ADDITIONAL LANDSCAPE DESIGN
SERVICES, FOR THE VENETIAN ISLANDS NEIGHBORHOOD RIGHT-OF-WAY
IMPROVEMENT PROJECT BID PACKAGE NO. 13B.
This Amendment No. 11 to the Agreement made and entered this 5 day of September
2007, by and between the CITY OF MIAMI BEACH, a Municipal Corporation existing underthe laws
of the State of Florida (hereinafter referred to as City), having its principal offices at 1700 Convention
Center Drive, Miami Beach, Florida 33139, and JACOBS EDWARDS AND KELCEY, INC, having its
offices at 7300 North Kendall Drive, Suite 400, Miami Florida, 33156 (hereinafter referred to as
Consultant).
RECITALS
WHEREAS, pursuant to Request for Qualifications (RFQ) No. 10-0001, the Mayor and City
Commission adopted Resolution No. 2002-25071, on November 21, 2002, approving and
authorizing the Mayor and City Clerk to execute an Agreement with Edwards and Kelcey, Inc, for
Professional Services for the Venetian Islands Neighborhood Right of Way Improvement Project
(the Project); and
WHEREAS, the Agreement provided for the detailed planning, design, bid, award and
construction services for various streetscape /landscape /utility improvements within the Venetian
Islands neighborhood; and
WHEREAS, the Agreement was executed for snot-to-exceed amount of $799,903; and
WHEREAS, on August 6, 2003, the Capital Improvement Projects (CIP) Office approved
Amendment No. 1 to the Agreement, for snot-to-exceed amount of $365, for the preparation and
attendance of t`~e Consultant at a previously unforeseen Design Review Board meeting; and
WHEREAS, on August 6, 2003, the CIP Office approved Amendment No. 2 to the
Agreement, for snot-to-exceed amount of $2,000, for the preparation of additional survey work
within the Venetian Causeway right of way; and
WHEREAS, on March 23, 2004, the CIP Office approved Amendment No. 3 to the
Agreement, for snot-to-exceed amount of $24,750, for the performance of additional underground
utility verification (soft-dig) services; and
WHEREAS, on March 23, 2004, the CIP Office approved Amendment No 4 to the
Agreement, for snot-to-exceed amount of $5,090, for the design of additional irrigation at the
request of the City's Parks Department; and
Page 1 of 5
M8: E&K AMEND NO 11. doc
WHEREAS, on July 27, 2005, Amendment No. 5 to the Agreement was approved, for an
amount not-to-exceed $200,000, for additional engineering services to design, permit, bid, award
and construction administration services for water and stormwater related improvements; and
WHEREAS, on August 22, 2005, the Capital Improvement Projects (CIP) Office approved
Amendment No. 6 to the Agreement, for snot-to-exceed amount of $21,222, for revisions to traffic
related improvements at Miami Dade Public Works Department request; and
WHEREAS, on November4, 2005, the Capital Improvement Projects (CIP}Office approved
Amendment No. 7 to the Agreement, for anot-to-exceed amount of $22,408, for additional
engineering services to design, permit, bid, award and construction administration services forwater
related improvements; and
WHEREAS, on March 27, 2006, the Capital Improvement (CIP) Office approved Amendment
No. 8 to the Agreement, for anot-to-exceed amount of $20,597, for re-planning and redesigning
portions of Bid Package 13C pursuant to revisions requested by residents; and
WHEREAS, on June 7, 2006, pursuant to Resolution No. 2006-26204, the City approved
Amendment No. 9 to the Agreement, for snot-to-exceed amount of $652,571, for additional
construction administration service; resident project representative services; pump station
equipment modification; and City requested changes to the design for the Right-of-Way
Infrastructure Improvements Program, Neighborhood No. 13 -Venetian Islands; and
WHEREAS, on September 5, 2007, pursuant to Resolution 2007-26631, the City approved
Amendment No. 10 to the Agreement, for snot-to-exceed amount of $383,391, for additional design
services, for the Venetian Islands Neighborhood Right-of-Way Infrastructure Improvements
Program, Neighborhood No. 13C, comprised of San-Marino, Di-Lido, and Rivo Alto Islands; and
WHEREAS, on October 15, 2007, the Capital Improvement Projects (CIP) Office approved
Amendment No. 11 to the Agreement, for a lump sum amount of $14,519, to provide additional
design services for the landscape of the Venetian Islands Neighborhood Improvements Project Bid
Package 13B; and
WHEREAS, this Amendment No.11 increases the total Agreement fee by $14,519, fora total
fee of $2,146,815; and
WHEREAS, the CONSULTANT met with the CITY and Hazen and Sawyer, the City's
Program Manager, and it has been established that this additional service request appears fair and
reasonable.
NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises,
covenants, agreements, terms, and conditions herein contained, and other good and valuable
consideration, the respect and adequacy are hereby acknowledged, do agree as follows:
1. ABOVE RECITALS
The above recitals are true and correct and are incorporated as a part of this Amendment
No. 11.
2. MODIFICATIONS
Page 2 of 5
MB:EKAMEND NO 11.doc
The Agreement is amended as defined in Schedule "A-11", attached herein.
3. OTHER PROVISIONS.
All other provisions of the Agreement, as amended, are unchanged.
4. RATIFICATION.
The City and Consultant ratify the terms of the Agreement, as amended by this Amendment
No. 11.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 11 to be
executed in their names by their duly authorized officials as of the date first set forth above.
ATTEST
APPROVED AS TO
FORM & LANGUAGE
~ ~ (. ~_
CITY CLERK or E . Chartran
i ctor, CIP Office
WITNESS
~'~-__ ~ . _ , ~1..~ ~ ~~ ~~
r ~cretary/S' natur
l ~~
EDWARDS AND KELCEY, INC.
._S
oFj;c~ t/Signature
MRnd9 ~~
Print Na e
Print Name
Page 3 of 5
MB: EK AMEND NO 11. doc
CITY OF MIAMI BEACH, FLORIDA
SCHEDULE "A-10"
SCOPE OF SERVICES
Schedule "A" entitled, "Scope of Services", is amended as follows:
ADD the Following under Task 5 -ADDITIONAL SERVICES
"Task 5.6 -Additional Design Services for Bid Package 13B Belle Isle Park:
Task 5.0 General: The CONSULTANT shall furnish additional design services associated
with revisions to the park landscape design, as necessary to obtain the DERM tree
removal/relocation permit for Bid Package 13B: Venetian island ROW Improvements, as
noted below:
Additional services required to update the landscape drawings, plant schedules, Paving Plans
and Schedules, and associated landscape-only documents. Updating of the landscape drawings
is necessary as the actual site conditions have changed since the drawings were completed.
Of the fourteen (14) total landscape drawing sheets LA01A through LA13, we find that LA01A,
LA01 B, LA03 (Park Paving), LA11, and LA12 require significant changes; LA02, LA04 (Park
Paving Detail Layout & Schedule), LA06 (Park Irrigation), LA07, LA09, LA10, require minor
changes; LA05, LA08, and LA13 require no change. In summary, of the fourteen (14) sheets,
there are eleven which require modification.
TIME OF COMPLETION
Based on the scope of this Amendment No. 11, the following submittal dates shall apply:
• Bid Package 13B: Belle Isle and Belle isle Park: Revised Landscape Plans due on
August 1, 2007. (This work is completed).
PAYMENT AND COMPENSATION
The method for calculating the fees for the aforementioned proposed design services is
based on a lump sum fee. Invoicing will be based on the work completed. (This work is
completed).
COMPENSATION
• Original Agreement amount $799,903.
• Amendment No. 1: Additional preparation and participation in Design Review Board Meeting,
$365.
• Amendment No. 2: Additional surveying services, $2,000.
• Amendment No. 3: Additional Underground Utility Location (soft-dig) services, $24,750.
• Amendment No. 4: Additional irrigation design at Parks Department request, $5,090.
• Amendment No. 5: Additional water and stormwater related design efforts, $200,000.
• Amendment No. 6: Additional traffic improvements related design efforts, $21,222.
Page 4 of 5
M8: EK AMEND NO 11. doc
• Amendment No. 7: Additional services to design, water related improvements, $22,408.
• Amendment No. 8: Additional planning and Design pursuant to residents request, $20,597.
• Amendment No. 9: Additional construction administration service; resident project
representative services; pump station equipment modification; and City requested changes
to the design, $652,571.
• Amendment No. 10: Additional Services to redesign Bid Package 13C, San-Marino, Di-Lido,
and Rivo Alto Islands pursuant to residents request, $383,391.
• Amendment No. 11: Additional Services for the Venetian Islands Neighborhood 136
Landscape Plans Update necessary to obtain DERM Tree Removal/Relocation Permit,
$14,519
• Revised Agreement amount $2,146,815.
Page 5 of 5
MB:EKAMEND NO 11.doc