2001-24243 RESO RESOLUTION NO. 2001-24243 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AUTHORIZING AND APPROVING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO, 9, IN THE AMOUNT OF $488,205, TO THE AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN THE CITY AND THE FIRM OF CAMP, DRESSER, AND McKEE, INC., TO PROVIDE PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR THE WASTEWATER MASTER BOOSTER PUMP STATION IN SOUTH POINTE; SAID AMENDMENT PROVIDING FOR ARCHITECTURAL, ENGINEERING, SPECIFICATIONS, CONSTRUCTION DOCUMENTATION, AND CONSTRUCTION ADMINISTRATION AS WELL AS FOR PAYMENT OF FEES FOR PROJECT REIMBURSABLE EXPENSES AND SUPPLEMENTAL SERVICES; FURTHER APPROPRIATING FUNDS, IN THE AMOUNT OF $488,205, FROM THE SERIES 2000 WATER AND SEWER REVENUE BONDS, FUND NO. 424. WHEREAS, on July 8, 1992, the Mayor and City Commission approved Resolution No. 92-20540, authorizing the Mayor and the City Clerk to execute an Agreement between the City and Camp, Dresser and McKee, Inc., (CDM) to provide engineering services for upgrading sewer and water pumping stations (Agreement); and WHEREAS, the Agreement contemplated and included provisions for the addition of incremental phases; and WHEREAS, because ofCDM's familiarity and expertise with the City's sanitary sewer system, the City has, in past years, amended the Agreement to provide additional professional engineering services to the City; and WHEREAS, the City has reached its design capacity for the existing wastewater pumping stations; and WHEREAS, the flows developed in the Year 2000 Comprehensive Plan prepared by the City's Planning and Zoning Department will exceed the capacity of the equipment being installed in the current Water and Wastewater Improvement Project without the addition of a new in-line booster station in South Pointe (the Project); and WHEREAS, as a result, this Project has been identified in the Series 2000 Water and Sewer Bonds as a priority project and the City's Public Works Department has recommended construction of a master booster pump station; and WHEREAS, as part of the Water and Wastewater Improvement Project preliminary design, the City and CDM concurred that the least disruptive and most economically feasible option to meet the Year 2000 Level of Service for the wastewater transmission system is to construct a single new booster pump station at the downstream end of the wastewater transmission system in lieu of major structural and electrical upgrades at five existing pump stations; and WHEREAS, this option provides the benefits of greater better system reliability, operational flexibility and lower force main pressures throughout the entire system, resulting in decreased operational and maintenance cost; and WHEREAS, the City would herein recommend that the Mayor and City Commission approve Amendment No. 9 to the Agreement, in the amount of $488,205, providing for design services, supplemental services, and reimbursable expenses related to the Project; and WHEREAS, accordingly, the Administration recommends that the allocation of $488,205 from the Series 2000 Water and Sewer Revenue Bonds, Fund No.424, also be approved by the Mayor and City Commission. NOW THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission herein authorize and approve the Mayor and City Clerk to execute Amendment No, 9, in the amount of $488,205, to the Agreement for professional services between the City and Camp, Dresser, and McKee, Inc., to provide professional architectural and engineering services for the Wastewater Master Booster Pump Station in South Pointe; said amendment providing for architectural, engineering, specifications, construction documentation, and construction administration, as well as for payment of fees for reimbursable expenses and supplemental services; further appropriating funds, in the amount of $488,205, from the Series 2000 Water and Sewer Revenue Bonds, Fund No.424. PASSED ood ADOPTED <hi, 3\' ~y 0' JM""" 200 L '^{ MA: OR ATTEST: _~ PcU~ F'\WOAA~~L~~:::~~~::Y"=lmp~=~"~=O'~S2'F~f~BOO~ APPROVED AS TO FORM & lANGUAGE & FOR EXECUTION j-k<:;"-c;il .- ~" , January 31, 2001 Page Four Project Budget 41 I $5,971,600.00 Design Services CDM Engineering Design Outside Professionals Survey Geotechnical Investigations Architectural Treatments 5.81% $ 346,860.00 0.14% $ 8,500.00 0.06% $ 3,500.00 0.75% $ 45,000.00 Subtotal 6.76% $ 403,860,00 Supplemental/Additional Services Permitting Assistance 0.53% $ 31,840.00 Bidding Services 0.58% $ 34.715.00 Subtotal 1.11% $ 66,555,00 Reimbursables Design Services 0.27% $ 16,252.00 Bidding Services 0.03% $ 1,538.00 Subtotal 0.30% $ 17,790.00 TOTAL 8.18% $ 488,205.00 Architectural and Engineering Fees $ Construction $ Program Management $ Construction Contingency $ Additional Services (A&E + Prog. Mgml.) $ Reimbursable Expenses (A&E + Prog. Mgml.) $ Construction Management $ Art-In-Public Places $ Furniture, Fixtures and Equipment $ TOTAL $ 403,860.00 4.281,118.00 420.030.00 442,282.00 237.235.00 45.373.00 141,702.00 5,971,600,00 January 31, 2001 Page Five CONTRACT AMENDMENT SUMMARY Amendment No. Resolution No, Amount Scope of Work . .. . ." . 92-20540 $ 93-2D905 $ 2 94-21290 $ $ 3 94-21116 $ 4 96-22072 $ 95-21495 $ 96-22178 $ 5 $ 6 96-22098 $ $ 7 96-22139 $ 97-22416 $ 8 97-22415 $ SUBTOTAL $ 9 $ TOTAL $ P9 P g 129,442.0D (Preliminary Design, Phase I) pgra e ewer n a er umplng a Ions 658.325.DO (Final Design, Phase II) nerlm ae u y aar as ewaer n 123,049.00 Yearly Studies For Four Years eocalon Ie or e aar n a ur 5.200.0D Cswy pgra e ewer n a er umplng a Ions 60.000.DD (Design Of The New MacArthur Cswy Water PS) I I e n fas ru ure mprovemen s a er 858,00D.DD System Master Plan & Program Management) pgra e ewer n a er umplng a Ions 127.991_00 (A&E. Surveying. And Geotechnical Services) I YWI e n fas ru ure mprovemen 5 ncrease n 64,307.0D Expenditure) 9,200.00 Structural Design ForTerminallsland PS W I Ins (Generator Bldg @ PS11. Increase WO 2138. & 38,88D.OD New PS On McArthur Cswy) 64.3D7.DO Citizen's Information Service (GIS) I n u r v System Master Plan & Program Management Safety 87,832.00 & Maintenance Enhancements) I I e n fas ru ure mprovemen s ncrease n 798.804.00 Expenditure) pgra e ewer n a er umplng a Ions 1.514,944_DO (Bidding & CM Services) 4,640,281.00 pgra e ewer n a er umplng a Ions 488.2D5.0D (Master Booster PS Design) 5,028,486.00 CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH. FLORIDA 33139 COMMISSION MEMORANDUM NO.4- -, -0 I TO: Mayor Neisen O. Kasdin and DATE: January 31, 2001 Members of the City Commission FROM: Jorge M. Gonzalez \.. ^ ~ City Manager 0 \J-"vG A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AUTHORIZING AND APPROVING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO.9, IN THE AMOUNT OF $488,205, TO THE AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN THE CITY AND THE FIRM OF CAMP, DRESSER, AND McKEE, INC., TO PROVIDE PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR THE WASTEWATER MASTER BOOSTER PUMP STATION IN SOUTH POINTE; SAID AMENDMENT PROVIDING FOR ARCHITECTURAL, ENGINEERING, SPECIFICATIONS, CONSTRUCTION DOCUMENTATION, AND CONSTRUCTION ADMINISTRATION AS WELL AS FOR PAYMENT OF FEES FOR PROJECT REIMBURSABLE EXPENSES AND SUPPLEMENTAL SERVICES; FURTHER APPROPRIATING FUNDS, IN THE AMOUNT OF $488,205, FROM THE SERIES 2000 WATER AND SEWER REVENUE BONDS, FUND NO. 424. SUBJECT: ADMINISTRATION RECOMMENDATION: Adopt the Resolution. FUNDING: Funds for this project are available from the Series 2000 Water and Sewer Revenue Bonds, Fund No. 424. AGENDA ITEM c.. I I DATE 0 (-31-0 I January 31, 2001 Page Two ANALYSIS: On July 8, 1992, the City Commission approved Resolution No. 92-20540 authorizing the Mayor and the City Clerk to execute an agreement between the City and Camp, Dresser and McKee, Inc., (CDM) to provide engineering services for upgrading sewer and water pumping stations. The contract documents included provisions for the addition of incremental phases to the contract by amendment. Because ofCDM's familiarity and expertise with the City's sanitary sewer system, the City has, in subsequent years, amended this original contract with CDM to provide additional professional engineering services to the City. The current amendment (Amendment No.8) provides for professional engineering services for the current Water and Wastewater Pump Station Upgrade Project. The pumps in the current Water and Wastewater Pump Station Upgrade Project were designed to operate at 10psi. Without the proposed booster pump station the current pumps will operate at approximately 55psi, which is significantly outside the original design parameters. Operating the pumps outside the design parameter would place additional strain on several pumps in the system in order to make up for its reduced pumping capacity, cause additional wear and tear on several pumps, increase the cost of operating the system due to pumping inefficiency, and at peak flow conditions would allow the sewage to backup into the existing sewer system. The current Water and Wastewater Pump Station Upgrade Project is scheduled to be completed by the fall of2002. The estimated time to complete the design of the proposed booster pump station is one year with an additional year to complete its construction. Because of this, the design and construction of the booster pump station has now become urgent. City staff believes that CDM, with its current knowledge of the City's sanitary sewer system as well as the current Water and Wastewater Pump Station Upgrade Project, is best positioned to deliver the booster pump station on-line in the shortest time possible. City staff has contacted Miami-Dade County and Broward County with reference to typical fees paid to consultants for comparable services, Both counties report that their typical fee range from 7% to 10%. As a result, City staff has renegotiated CDM's fees for professional services to 6.76% (See attached South Pointe Booster Pump Station Fee Proposal). In addition, 1.11 % and 0.3% have been budgeted for supplemental services and reimbursables respectively. Because time is of the essence, this fee includes a "fast track" design component for the booster pump station project. This" fast track" component typically results in higher fees in order to accelerate the project's completion date. However, City staff negotiated a fee structure that negates this premium. The total amount budgeted for this project is $5,971,600 (see attached Total South Pointe Booster Pump Station Estimated Budget). A portion of the total construction budget will be funded by the South Pointe Redevelopment Agency, Program management services for this project is estimated to cost $618,293, ., , January 31, 2001 Page Three The City of Miami Beach has reached its design year for the existing wastewater pumping stations. The flows developed in the Year 2000 Comprehensive Plan prepared by the City of Miami Beach Planning and Zoning Department, will exceed the capacity ofthe equipment being installed in the current Water and Wastewater Improvements Project without the addition of a new in-line booster station on South Pointe. As a result, this project has been identified in the Series 2000 Water and Sewer Bonds as a priority project and the City's Public Works Department has recommended construction of a master booster pump station. As part of the Water and Wastewater Improvements Project preliminary design, the City and its water and wastewater consultant, CDM concurred that the least disruptive and most economically feasible option to meet the Year 2000 Level of Service for the wastewater transmission system is to construct a single new booster pump station (tentatively located at the southwest intersection of AIton Road and 1 ~ Street) at the downstream end of the wastewater transmission system in lieu of major structural and electrical upgrades at five existing pump stations (pump stations nos, 1, 10, 11, 28 and 31). This option provides the benefits of greater better system reliability, operational flexibility and lower force main pressures throughout the entire system, resulting in decreased operational and maintenance cost. This project will include an in-line 98 MGD (peak), variable speed, partially underground three pump (two service, one standby) 1,750 hp wastewater booster station and a 54-inch station by- pass force main. The project also includes a remote electrical control room, instrumentation, SCADA interface, standby generator & fuel system, a noise suppression system, and architectural and landscaping features. The Administration recommends the adoption of the attached Resolution. JMG: 'PW:RM:MA:WR~