Loading...
2001-24241 RESO RESOLUTION NO. 2001-24241 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROPRIATING $25,000 FROM THE $92 MILLION G. O. BOND-SERIES 2000, FUND NO. 374, TO PROVIDE FOR COMPREHENSIVE ROOF SURVEYS AND ASSESSMENT PLANS FOR THE REPAIR AND REPLACEMENT OF ROOFS ON SELECTED CITY FACILITIES, AS OUTLINED IN THE GENERAL OBLIGATION BOND PROGRAM. WHEREAS, during the development of the Capital Improvement Program (CIP), the Property Management Department requested a five year plan to address the needs and conditions of multiple types of roofs on selected City facilities; and WHEREAS, roof surveys and assessment plans that reflect the existing conditions are necessary to develop the required specifications for roof replacement bids, and to determine a maintenance plan to prolong the life expectancy of roofs on City facilities; and WHEREAS, funds for the roof surveys, assessment plans, roof repairs, and roof replacements are provided in a $175,000 per year allowance in the General Obligation Bond Program; and WHEREAS, Tremco, Inc. would provide the roof surveys and assessment plans under the State of Florida SNAPS Contract #9912081-1 XP 7/1101; and WHEREAS, based on the surveys and assessment plans, a five year maintenance and replacement plan would be developed to address and prioritize the current needs of City facilities. NOW, THEREFORE BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission herein appropriate $25,000, from the $92 Million G. O. Bond-Series 2000, Fund No. 374, to provide for comprehensive roof surveys and assessment plans for the repair and replacements of roofs on selected City facilities, as outlined in the General Obligation Bond Program. PASSED AND ADOPTED THIS 31st day of January 2001 , ATTEST: ~rf~ CITY CLERK 1IIJOR CIMyF'Iu~~.1O ~M.. .~ AId t-VA?j.l~.~1 -~"'- " CITY 0 F M I A M I B E A C H . CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH. FLORIDA 33139 h\lp:\\ci.miam_.ft.ua ~ MEMORANDUM TO: GO Bond Oversight Committee DATE: September 11, 2000 SUBJECT: Request for the approval to expend 525,000 available for FY 2000/2001, to provide for a comprehensive roof assessment plan and the approval to expend $150,000 available for FY 2000/2001 for the repair and replacements of roofs Citywide. The roof assessment plan would include the development of a five year, computerized plan and database for the maintenance and replacement of roofs on City facilities as outlined in the General Obligation Bond Project. During the development of the Capital Improvement Program (ClP), the Property Management Department requested a five year based plan to address the needs and conditions of the multiple types of roofs on City facilities. This plan would include $25,000 per year for roof surveys, tests, reports, and specifications, and $150,000 per year for repair and replacement needs. The roof assessment plan would include the following: 1) Detailed roof surveys 2) Technical reports 3) Asbestos surveys 4) Roof core analysis 5) Adhesion tests 6) Thermography 7) Moisture analysis 8) RoofpuIl tests 9) Recommended specifications for repairs or replacement 10) Recommended maintenance plan Reports will be generated and provided using a Property Management Department approved software based, roof management program that includes AutoCAD computer generated roof drawings that will show graphically color coded current roof conditions and estimated remaining life of each roof surveyed. The reports will provide a detailed assessment of the current roof conditions of each facility and provide recommendations and specifications of maintenance needs to prolong the life expectancy of each roof. The reports will also provide the recommended specifications for the replacement of the roofs if deemed necessary by the surveys and reports. Based on the data provided by the roof assessment plan, a five year roof repair and replacement plan wi1\ be developed to address and prioritize the current needs of City Facilities. Costs for the roof assessments, repairs and replacement needs are provided by the $175,000 per year allowance as provided in the General Obligation Bond Program. The administration is requesting the approval to expend the proposed $25,000 for the comprehensive roof assessment plan and to expend the remaining $150,000 for roof repairs and replacements based on the needs addressed in the roof assessment plan. Funding will be provided from the FY 2000/2001 allowance for roofs assessments, repairs, and replacements as outlined in the General Obligation Bond Program . MSIBAJ c: IM.r FilulGO BOI"llONnt,htR.oop.r..yl.wpd CITY OF MIAMI BEACH CITY HALL 171Xl CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 3313il http:\'<:l.mlami.be8ch.ft,U8 ~ - COMMISSION MEMORANDUM NO. Ifj-Of TO: Mayor Neisen O. Kasdin and Members of the City Commission DATE: January 31, 2001 FROM: Jorge M. Gonzalez \ City Manager O~ SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, TO APPROPRIATE $25,000 FROM THE $92 MILLION G. O. BOND-SERIES 2000, FUND #374, TO PROVIDE FOR COMPREHENSIVE ROOF SURVEYS AND ASSESSMENT PLANS FOR THE REPAIR AND REPLACEMENTS OF ROOFS ON CITY FACILITIES AS OUTLINED IN THE GENERAL OBLIGATION BOND PROGRAM. ADMINISTRATION RECOMMENDATIONS: Adopt the Resolution. AMOUNT AND FUNDING $25,000.00 Funds are available in the $92 Million General Obligation Bond Series 2000, Fund #374 ANALYSIS: During the development of the Capital Improvement Program (CIP), the Property Management Department requested a five year based plan to address the needs and conditions of the multiple types of roofs on City facilities. This plan would include $25,000 per year for roof surveys, tests, reports, and specifications, and $150,000 per year for repair and replacement needs. The surveys and reports will be generated and provided using a Property Management Department approved software based, roof management program that includes AutoCAD computer generated roof drawings that will show graphically color coded current roof conditions and estimated remaining life of each roof surveyed. The reports will provide a detailed assessment of the current roof conditions of each facility and provide recommendations and specifications of maintenance needs to prolong the life expectancy of each roof The reports will also provide the recommended specifications for the replacement of the roofs if deemed necessary by the surveys and reports. AGENDA ITEM C.7G- /-3/-0/ DATE Page 2 January 31, 2001 Analysis (Contd.) The roof assessment plan would include the following: 1) Detailed roof surveys 2) Technical reports 3) Asbestos surveys 4) Roofcore analysis 5) Adhesionte~s 6) Thermography 7) Moisture analysis 8) Roof pull tests 9) Recommended specifications for repairs or replacement 10) Recommended maintenance plan Based on the data provided by the roof assessment plan, a five year roof repair and replacement plan will be developed to address and prioritize the current needs of City Facilities. Costs for the roof assessments, repairs and replacement needs are provided by the $175,000 per year allowance as provided in the General Obligation Bond Program. The funding for the surveys and assessment plan was approved by the GO Bond Oversight Committee at their September 11, 1999, meeting. Tremco Inc. will be providing the roof survey and assessment plan under the State of Florida SNAPS Contract #9912081-1 XP 7/1101. The City Manager requests that the Mayor and City Commission adopt the Resolution to appropriate $25,000 for the comprehensive roof surveys and assessment plans for City facilities. JM~~ C:1A(y Fth"IC__olj(oollUl'HYz.wpd