2008-26752 ResoRESOLUTION NO. 2008-26752
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI
BEACH, FLORIDA, GRANTING AND AUTHORIZING THE MAYOR AND CITY CLERK TO
EXECUTE A UTILITY EASEMENT IN FAVOR OF FLORIDA POWER AND LIGHT (FPL), TO
PROVIDE ELECTRICAL SERVICE FOR AN UNDERGROUND DUCT BANK TO SERVE THE
NEW STORMWATER PUMP STATION, INCLUDED AS PART OF THE BELLE ISLE
NEIGHBORHOOD RIGHT OF WAY IMPROVEMENT PROJECT, BID PACKAGE NO. 13B.
WHEREAS, in August 2005, construction documents prepared by Jacob Edwards and
Kelcey (formerly known as Edwards and Kelcey), were issued by the City, along with a request
for a cost proposal from the Job Order Contractor (JOC), Alpine Construction Management
Corporation (Alpine), for the construction of the Belle Isle Neighborhood Right of Way (ROW)
Improvement Project, Bid Package No. 136 (Project); and
WHEREAS, the scope of services that were outlined in the proposal for the Project
included the installation of water mains; storm drainage system and pump station; street lighting;
roadway reconstruction, including milling and resurfacing; parking; traffic signage and pavement
marking; and landscape and irrigation; and
WHEREAS, the scope of services for the improvements to the Belle Isle Park included
re-grading of the entire Park, landscaping, irrigation, site furnishings, pedestrian lighting, a "bark-
park", and new walkways within the park; and
WHEREAS, on December 2, 2005, following extensive negotiations, the final cost
proposal for the construction of the Project, in the amount of $5,603,638, was accepted by the
City; and
WHEREAS, on May 16, 2006, the City issued the Second Notice to Proceed (NTP) on
the Project which allowed Alpine to mobilize on the site; and
WHEREAS, the right-of-way improvements were completed prior to the end of November
2007, and the stormwater system, comprised of numerous stormwater structures, piping,
drainage wells, and pump station, is ninety percent (90%) complete; and
WHEREAS, Alpine is currently working toward completing the improvements within the
Park, and placing the pump station into operation by July of 2008; and
WHEREAS, the pump station constructed at the northwest corner of Belle Isle Park,
requires an electrical service point of connection; and
WHEREAS, it will be necessary to provide a new electrical service to the stormwater
pump station through the Park, via a transformer serving the existing sanitary pump station,
located at the northeast corner of the Park; and
WHEREAS, the survey of the proposed location, including the legal description, have
been completed; and
WHEREAS, the City needs to grant FPL a utility easement to install the pumps, and
place the stormwater system into service at Belle Isle, prior to the start of the rainy season; and
WHEREAS, no funding is required to grant FPL the required easement.
NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND THE CITY
COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City
Commission hereby grant and authorize the Mayor and City Clerk to execute a utility easement
in favor of Florida Power and Light (FPL), to provide electrical service for an underground duct
bank to serve the new stormwater pump station, included as part of the Belle Isle Neighborhood
Right-of-Way Improvement Project, Bid Package No. 13B.
PASSED and ADOPTED this 13th day of February 2008.
ATTEST: ~ ~y ,
Robert Parcher, City Jerk
Ma i H. ower, Mayor
T:\AGENDA\2008\February 13\Consent\Belle-Isle FPL easement RESO.doc
APPROVED AS TO
FORM & LANGUAGE
COMMISSION ITEM SUMMARY
Condensed Title:
A Resolution authorizing the Mayor and City Clerk to record a Utility Easement for Florida Power and Light
(FPL), to provide service for an underground ductbank to serve the new stormwater pump station, included
as part of the Belle Isle Neighborhood Right of Way Improvement Project.
mienaea vuzcome
Quality Capital Projects
Supporting Data (Surveys, Environmental Scan, etc.): In the 2007 Community Satisfaction Survey,
indicated that Miami Beach, when compared with similar cities, ranked in the forty percentile rating for
storm drainage improvements. Granting FPL the utility easement will facilitate the completion of a much
needed stormwater pump station at Belle Isle. ___
Issue:
Should the City Commission adopt the Resolution?
Item Summa /Recommendation:
In August 2005, Construction Documents prepared by Jacob Edwards and Kelcey, were issued by the
City, along with a request for cost proposal from the Job Order Contractor (JOC), Alpine Construction
Management Corporation (Alpine) for the construction of the Belle Isle Neighborhood Right of Way
(ROW) Improvement Project, Bid Package No. 136 (Project).
On December 2, 2005, following extensive negotiations, the final cost proposal for the construction of the
Project, in the amount of $5,603,638, was accepted by the City. On May 16, 2006, the City issued the
Second Notice to Proceed (NTP) on the Project which allowed Alpine to mobilize on the site.
In August 2007, Alpine completed and placed into service the new 12-inch water main system. The Right-
of-Way improvements were completed prior to the end of November 2007, and the stormwater system is
ninety percent complete. The contractor is currentlyworking towards completing the improvements within
the park, and placing the pump station into operation by July of 2008.
The pump station constructed at the northwest corner of Belle Isle Park, requires an electrical service
point of connection. Consequently, it will be necessary to provide a new electrical service point to the
stormwater pump station through the park, via an existing transformer serving the existing sanitary pump
station located at the northeast corner of the Park.
The proposed location of the duct bank has been identified, and the survey of the location, including the
Legal Description, completed. FPL requires that the City record the easement prior to their scheduling and
placement of their electrical service. Therefore there is a need to grant FPL the utility easement. This
work is critical to the installation and "start-up" of the pumps, and placement of the stormwater system into
operation at Belle Isle prior to the start of the rainy season.
The Administration recommends that the City record the utility easement for FPL in order to power the
stormwater pump station at Belle Isle.
hmanClal Inrormatlon: Not a licable, no tundin is re wired.
Source of Amount Account Approved
Funds: ~
2
3
4
OBPI Total
Financial Impact Summary:
:ity Clerk's Office L
Carla Dixon Ext. 6264
De rt ent Director A istan City Manager City Manager
JEC TH JMG
T:WGEN 0 \February 13\Consent\Belle-Isle FP easement Summary.doc
AC.EAIDA ITEM ~ 7~
DATE ~ ~.3~~~
m MIAMIBEACH
City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, viww.miomibeachfl.gov
COMMISSION MEMORANDUM
To: Mayor Matti H. Bower and Members of the Ci Commission
FROM: Jorge M. Gonzalez, City Manager
DATE: February 13, 2008
SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF
MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND
CITY CLERK TO RECORD A UTILITY EASEMENT FOR FLORIDA POWER AND
LIGHT (FPL) TO PROVIDE ELECTRICAL SERVICE FORAN UNDERGROUND
DUCTBANK TO SERVE THE NEW STORMWATER PUMP STATION,
INCLUDED AS PART OF THE BELLE ISLE NEIGHBORHOOD RIGHT OF WAY
IMPROVEMENT PROJECT, BID PACKAGE NO. 73B.
Record a utility easement.
FUNDING
No funding is required in order to record the utility easement.
ANALYSIS
In August 2005, Construction Documents prepared by Jacob Edwards and Kelcey (formerly
known as Edwards and Kelcey), were issued by the City, along with a request for a cost
proposal from the Job Order Contractor (JOC), Alpine Construction Management
Corporation (Alpine) for the construction of the Belle Isle Neighborhood Right of Way (ROW)
Improvement Project, Bid Package No. 13B (Project).
The Scope of Services that were outlined in the proposal for the Project included the
installation of water mains; storm drainage system and pump station; street lighting; roadway
reconstruction, including, milling and resurfacing; parking; traffic signage and pavement
marking; landscape and irrigation. The Scope of Services for the improvements to the Belle
Isle Park included re-grading of the entire Park; landscaping, irrigation, site furnishings,
pedestrian lighting, a "bark-park", and new walkways within the park.
On December 2, 2005, following extensive negotiations, the final cost proposal for the
construction of the Project, in the amount of $5,603,638, was accepted by the City. On May
16, 2006, the City issued the Second Notice to Proceed (NTP) on the Project which allowed
Alpine to mobilize on the site.
In August 2007, Alpine completed and placed into service the new 12-inch water main
system. The Right-of-Way improvements were completed priorto the end of November 2007,
and the stormwatersystem, comprised of numerous stormwaterstructures, piping, drainage
wells, and pump station, is ninety percent (90%) complete. The remaining work is associated
with the connection of 24-inch stormwater lines to the east and west outtalls, located in the
vicinity of the Venetian Causeway, and the start-up of the pumps. The contractor is currently
working toward completing the improvements within the Park, and placing the Pump Station
into operation by July of 2008.
Belle Isle -FPL easement
February 13, 2008
Page 2 of 2
The Pump Station constructed at the northwest corner of Belle Isle Park, requires an
electrical service point of connection. The service point of connection originally
contemplated is via an FPL manhole located within the Island Avenue South Right-of-Way.
However, during the process of coordinating with FPL, it was determined that this point of
connection was not feasible. Consequently, it will be necessary to provide a new electrical
service to the stormwater Pump Station through the park, via a transformer serving the
existing sanitary pump station located at the northeast comer of the Park. Therefore there is
a need to grant FPL the utility easement.
The proposed location of the duct bank has been identified, and the survey of the location,
including the Legal Description, completed (Attachment 1). Although the excavation for the
placement of the conduits has commenced, FPL requires the City to record the easement
prior to their scheduling and placement of their electrical service. The placement of the
electrical service is critical to the installation and "start-up" of the pumps, and placement of
the stormwater system into service at Belle Isle prior to the start of the rainy season.
CONCLUSION
The Administration recommends that the Mayor and City Commission of the City of Miami
Beach, Florida, approve and authorize the Mayor and City Clerk to record a utility easement
in favor of Florida Power and Light, within the Belle Isle Park, for the placement of an
electrical duct bank to serve the stormwater Pump Station, included as part of the Belle Isle
Neighborhood Right of Way (ROW) Improvement Project, Bid Package No. 136.
Attachment
T:UIGENDA12008\February 13\Consent\Belle-Isle FPL easement MEMO.doc
}}ijAcf-)m~wT ~
tli ~ Z
O `_,. N
4 X
s
i
r ~
I
I I
I °I
I I
I
I I I
I I
I I
I I
I ~.
} Ic#~I
QI I~ I
~ f~ I
Q ~ ~ I
-1 ~---
z I I
~,, I I I
>~ I
I I
1 I
I I
I ~
a lil
~I I I
I I
I I
I I
8'
I
0
~ d
v
b°a
n 4
~ V
xx
in U
~~
~~
~, Z
0
w
~~
W~
~sco
~~
v
'~ • ~ o
4
~~~~X
~ uu
< N
J ~1«G4Fy~
<ZC
A
'i~ d
~
}O~
g
'
~ ~ o « ~` i
^f ~ vt t
if-~4m~~
~
~ ~
-;aay
38
«v
r ~~~~
~
s
~i o
o
m
~e =~
~
~
~y~ 8.g
~~$~
F
~S ~'~ ~ cT e
5¢
y
>a f~x$
5 d~~ ~'
I
$
~ ~~:~: c
~~~
~ ~ ~~~
~~~~~~
g
~g~~W~
W f j' ~,
C/3 ,
,.
W s ,Jr'i,
J I~
W ~, ~
m ~ f
EASEMENT BELLE ISLE
PARK
z
v
W
Y
Z
O
Q
U
V/
H
Z
~.i
J
Q
N
OF
LEGAL DESCRIPTION
A 5 foo# easement located in a parcel designated PRIVATE PARK in AMENDED
PLAT OF BELLE ISLAND, Plat Book 5, Page 11, Public Records of Miami-Dade
County, Florida, the center line of which is described as follows:
Commence of the point of intersection of the center line of Bridge Road (now
Venetian Way) and the center line of that portion of Island Avenue odjacent to the
west boundary of the above mentioned parcel designated PRIVATE PARK; thence
run easterly, along the center line of Bridge Road (now Venetian Way) for o
distance of 504.90 feet; thence deflect 90°00'00" to the right for a distance of
$8.00 feet to the POINT OF BEGINNING of the center line of the 5 foot easement
herein described; thence run westerly, 88.00 feet south (measured of right angle)
and parallel to the center line of said Venetian Way for a distance of 363.38 feet
to the POINT OF TERMINUS. Said easement located in Section 33, Township 53
South, Range 42 East, City of Miami Beach, Miami-Dade County, Florido.