Loading...
Tetra-Tech WHS Amendment 2 Agmt~~S~dY - c ~,~ AMENDMENT NO. 2 TO THE PROFESSIONAL LANDSCAPE, ARCHITECTURAL AND ENGINEERING SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND TETRA-TECH, WHS (FORMERLY KNOWN AS WILLIAMS, HATFIELD AND STONER), DATED JULY 18, 2001, FOR THE PROVISION OF PROFESSIONAL SERVICES, IN AN AMOUNT NOT-TO-EXCEED $30,500 FOR RE-DESIGN OF THE LIGHTING SYSTEM (PER NEW CITY STANDARDS), A PLANNING STUDY RELATED TO HARDSCAPE AND LANDSCAPE REVISIONS ARISING FROM THE COMMUNITY DESIGN REVIEW MEETING, AND FOR ADMINISTRATION, SPECIFICATIONS AND REIMBURSABLES ASSOCIATED WITH THE ADDITIONAL SCOPE OF WORK (ALL AS MORE PARTICULARLY DESCRIBED !N EXHIBIT "A," THE FEE DETAIL, AND EXHIBIT "B," THE GEOGRAPHIC AREA, OF THE ADDITIONAL SERVICES REFERENCED) FOR THE RIGHT-OF-WAY INFRASTRUCTURE IMPROVEMENTS PROGRAM NEIGHBORHOOD N0.4-NORMANDY ISLE AND NORMANDIE SUD PROJECT. This Amendment No. 2 to the Agreement made and entered this ' S~day of b rk r 2004, by and between the CITY OF MIAMI BEACH, a Municipal Corporation existing unde the laws of the State of Florida (hereinafter referred to as City), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, TETRA-TECH, WHS (formerly known as Williams, Hatfield and Stoner), a Florida Corporation, having its offices at 1180 Southwest 36~' Avenue, Suite 203, Pompano Beach, Florida 33069 (hereinafter referred to as Consultant). RECITALS WHEREAS, pursuant to Request for Qualifications (RFQ) No. 07-00/01, the Mayor and City Commission adopted Resolution No. 2001-24505, on July 18, 2001, approving and authorizing the Mayor and City Clerk to execute an Agreement with the Consultant, for professional services for the Neighborhood No.4-Normandy Isle and Normandie Sud Right-of- Way (ROW) Infrastructure Improvement Project (the Project); and WHEREAS, the Agreement provides for the detailed planning, design, permitting, bidding /award and construction administrative services for various streetscape /landscape / utility improvements within the Normandy Isle and Normandie Sud Neighborhood; and and WHEREAS, the Agreement was executed for anot-to-exceed amount of $617,664.00; WHEREAS, on September 10, 2003, the Mayor and City Commission adopted Resolution No. 2003-25320, approving additional design services as Amendment No. 1 to the Agreement, for rear easement waterline relocation efforts, for anot-to-exceed amount of $50,529.00; and WHEREAS, this Amendment No.2 is to include additional design services for re-design of lighting system, pursuant to the City's new standards; a planning study related to hardscape and landscape revisions arising from the Community Design Review Meeting (CDRM), held on October 21, 2003; and for administration, specifications, and reimbursables associated with the additional scope of work, for anot-to-exceed amount of $30,500.00; NOW. THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 2. 3. ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No. 2. The Agreement is amended as defined in Exhibit "A", attached herein. All other provisions of the Agreement, as amended, are unchanged. 4. RATIFICATION. The City and Consultant ratify the terms of the Agreement, as amended by this Amendment No. 2. IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 11 to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: ~~'lX.~/IOI~ City Clerk Robert Parcher ATTEST: SECRETARY Print Name CITY OF MIAMI BEACH ~~ Matti Herrera Bower CONSULTANT: TETRA-T H, By PR ENT . ~se.,.~~~ ~ S TO Print Name FORM & LANGUAGE 8 F EXECUTION 1 1S e7 iry m ...,~ ^*r '~ . ~;:• ~" ' EXHIBIT "A" scOPE OF SERVICES ,; ; ' CITY OF MIAMI BEACH ~~~; RIGHT OF WAY INFRASTRUCTURE PROGRAM NEIGHBORHOOD No. 4 -NORMANDY ISLES STREET LIGHTING IMPROVEMENTS ADDITIONAL DESIGN SERVICES TASK 5.2 REDESIGN SERVICES FOR REVIEWED LIGHTING SYSTEM IN NORMANDIE SUD i December 9, 2003 Tiais Scope of Work consists of design services for completion of street lighting r itmtprovements only within the project area. The project area is defined as Normandy ~" ie1e, south of Normandy Waterway. This srnpe or work includes the following services. ~pk 5 21-Revised Design Criteria for Ligj,~Q Svstem CDM will redesign the lighting system from the current 1.0 ft. -candle intensity to the ~~t~'~ new Public Works Department Standard of 0.6 ft. candle. CDM shall develop revised pale spacing requirements to meet the new lighting standard of 0.6 ft.-candles tb~roughout the Normandie Sud-neighborhood. ~„~ r,;,,' ~k 5 2 2 -Revise Contract Documents for 90% Submittal CDM shall revise applicable electrical drawings (sheets E-i through E-25) to indicate the `4 new light pole spacing criteria. Specifications and electrical drawings will also be ` revised as required. CDM shall utilize City Standard details as provided by TT-WHS. ~k 5.2.3 -Revise Coat Opinion (~M shall revise the current 609'o design rnmpletion cost estimate to reflect the new !f~-ting standard of 0.6 ft. -candle and additional street lighting improvements for ehneet ends included in Task 5.2.1 above. T,IEbIE OF COMPLETION Deliverables will be submitted in accordance with the schedule outlined in the w ;?~ > agreement between the City of Miami Beach and TT-WHS. ~;;~. ~;, ,,. a c vut~snme iawsoo9 ~yy , S ~~ I o~ ~ I ~y N M 0 Fl IN ~ ~I~B ~ ~1 .~ -~- I' N m N I I o oo- O o $ ~ 0 it ~ ,'' - OI II 0 m e ;, N ~~ °' ~ ' 'o d III _. . o o a -,_ o~o I i - ... o o ~~ I _. I I I Im ~ Nlo '^ f OI0 ~ 0 S d . 'i y i ...... ' N _ ~_ ... _ _. I;O O _~ I O OO O O M O OI Q O ' I _ • ' i i I ~ ~ 11 I I 1 . Y ~ ~ ~ 11 ~ ~ I 'I : N W~ ~ I ~OO 00 I~ 0' I i t ~ Ii Y, I I i ~ I a O O 1 010'01 O O O 0 N ~ I IJ I ! I ~ ~ OI O O OO i ~~O O O ~ O ' I i t I Qpp ~N ' O z ~ nl ~~r I LL ~ I I ~ ~ an ' ~ I ' m ~~ I ~ I s ~ i ~ ~ ~ ~ ~~ 2S ~ _ H I Q ~ W qJ q LL I W y LL'I~ ~ JJ C y W ~LL ~ ~~ ~ Z ~yOy y TC$ ~" ~ ~ ~ ~ J y ¢..6 } F, ~ N ~ ~ ~~ ~ ~ u ~ ~ ~ n S ~~ Y ~~~ OO sx 4 Q~ ~~LL 66 yy } I 1C y ~ ~ ' W YYY} W O Q ~a O O ~ ¢ Z 555 W LL G ~Wj a~a J !c/! LYYJ~~ ~ Y~ ~IC N FpJ ~5! .pJ S 1L FF `F '1 N MINI Y{ tll'O N N N ' ..f ~N rv C1 A N N YI _ _ O{~ 'N -,N I ~d Z ~~ Q~ C U 'p. O ry L '~eY~S 9 N q~~$ ~- ~ ~ ~ ~' ~ o V30 ~Z2 C a°~~ O t N Z Qi N N H IN r OOD p _ f0 lh ~ ~-" ~ ~~ M G ~ ~ ~ 3 1 _ ~ N O W U O ~ a U ~ mho ~ ~ ~ N OD tp O C M N n o ~ N ~ N v m C O •_ ~ ~ W [O V ~} ~ d ro . ~ = O ~ A < ~ w B y`~ -~ ~E ~a V ~ e z d ~ d N ®~ Z J 3 ~ p c 4 Q Y e ~ ~ 'o ~"' . tS O O ~ ~ ~ pp O ~ C) N N N N ~s ~1 ~> Y ~~~ r N ~ f" N IA N Cpl O t+! N NI O r d fA f19~ N ~ ~ r v~ ~_ N M V ~ O H ~ N O N N ~ op mmp W S U U F O ~ ~ o ~ W S a Q r r c 3 MI M r Q a W d E ~ C y2 =~looq V N r f0 r .~ 3 p ~ ~ o~`e E ~w~ia~ v3 $z° LL K L .Q• m T. f0 ~ N~{O ~p~ fl Deb N MM~N NM N ~ ~ MN O W eWti Npj~ q~S N O NON OON OOH ym N W O O 000 000 rOg ~ O O 000 000 O~~ r N N 0 o eeo N0a ~e~ M n ei Narv oaN $j "fin ~ U e t7 M NaN NNN MOO a e o o.-~ moo noe w O W ZQm „ U ~ ~~u p QQZ N 2~ 1~IY) SNI- (~F ~~W LL Z13- u~ W2~ Oa (~~j ~ 3 WO ~ F ~X O €~~$ ~a ~~ O LL C W ~~o~ 3~ LL w~z ~n ~~-au~~y or o t~u ~ ~~u~m~ry~ ~ ~u ~'o~j ~~ ~~qy W~ ~ n a~'a' ~~ G~ ~WF 3 $~~ d~~ ~~ r N NCq ANN fV t'{N ~ YI Yl U~ IA b ~ N W Y! ~~ ,~ YJ T ~~ X W ~ ~._ . W > ~ .W/ ~ N ` V ~ } X~ `~ a ~ N o W ~3 W 2 O m 3 m 1~a. I o_ I I i 1 I 1 1 I ! o I I 0 0 us v ~~ ----- ,. -~ ,. -~ ,. ,,..~~ 19''x. .~ - - -~- - _ i i ~ i'~ ~' ` ~ /' /' T ~ I ~_~ cw - :Sd31IX - OAP'M-V-IIX3-dYll-il-11~1HLL53M3MH7Y3BNAH'JV3BI1'IY~M'H~~H - GN'1H l0 - T'd LOX/COOZ~~~ Memorandum To: Javier Rodriguez - WHS l,C: From: Aida Curtis Date: 2/2/2004 Re: Norntandy Isle and Normandie Sud- ROW Infrastmcture Improvement Program- Additional Services As requested by the City of Miami Beach and as a result of the Community Design Review Meeting No. 1 , we have prepared the following additional services request. This additional services request is based on the scope of services provided by Hazen and Sawyer, on Nov. 12, 2003. The enclosed spreadsheet covers the effort involved in the execution of Task 5.1 -Planning Effort for CDRM No.l Requested Revisions. We understand that upon completion of this effort, the City will determine what improvements/ revisions will be implemented and instruct the necessary changes to the construction drawings. This effort will be as part of the Task 5.1 and is not included in this proposal. This proposal includes 2 review meetings with the City and Program Managers, but does not include any presentations to Commission or Community Workshops. These items should they be necessary will be in addition to the enclosed scope. In addition, no provisions have been made for teimbursables associated with this effort. We have included and allowance of $500.00 for this task. Please feel free to call me if you have additional questions. ~ f ~a5 J. 1 ~:' 1 H 1 f! f