2001-24295 RESO RESOLUTION NO. 2001-24295 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AUTHORIZING THE ISSUANCE OF A REQUEST FOR QUALIFICATIONS FOR THE COMPLETION OF FINAL DESIGN/ENGINEERING PLANS FOR A MODIFIED ROADWAY PROJECT ON COLLINS A VENUE, FROM 5TH TO 15TH STREETS, IN AN AMOUNT NOT TO EXCEED $134,480, TO BE FUNDED AS PART OF A JOINT PARTICIPATION AGREEMENT (JPA) BETWEEN THE CITY AND THE FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT), IN THE AMOUNT OF $2,568,676.61, IN STATE AND FEDERAL FUNDS, AS APPROVED BY RESOLUTION NO. 2000-23944, DA TED MAY 24, 2000; AND FURTHER AUTHORIZING THE APPROPRIATION OF $134,480 FROM THE GENERAL FUND UNDESIGNA TED FUND BALANCE, FOR SUBSEQUENT REIMBVRSEMENT BY FDOT, UNDER THE PROVISIONS OF THE JPA. WHEREAS, approximately one year ago, the City assumed the lead role in final design and implementation of a to-be-modified roadway project for A1NCollins Avenue, from 5th to 15th Streets (the Project), which impetus is to minimize impacts to, and better serve the needs of the Art Deco Historic District and its stakeholders; and WHEREAS, this mutual agreement between the City and the Florida Department of Transportation (FDOT) was made official by Resolution No. 2000-23944, dated May 24, 2000, which also approved both a Joint Participation Agreement (JP A) for the State funds, in the amount of $2,055,610.61, and a Local Agency Program Agreement (LPA) for the Federal funds, in the amount of $513,066.00, to be transferred to the City for the purposes of the Project; and WHEREAS, the Project is fully funded by State and Federal sources, with no local match requirements; and WHEREAS, as part of the mutual agreement, the Project's construction was rescheduled from Fiscal Year 2000-01 to 2002-03, in order to return the original FDOT plans from the present 65% completion level back to the 30% level, to incorporate the changes and additions required by the City; and WHEREAS, in order to meet the new construction schedule, the Administration wishes to issue a Request for Qualifications (RFQ) for the Project's final design/engineering phase, which also includes a public involvement component; and WHEREAS, City funds, in the amount of $134,480, need to be appropriated for the purposes of this RFQ, for subsequent reimbursement by FDOT, under the provisions of the JP A. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby authorize the issuance of a Request for Qualifications (RFQ) for the completion of final design/engineering plans for a modified roadway project on Collins A venue, from 5th to 15th Streets, in an amount not to exceed $134,480, to be funded as part of a Joint Participation Agreement (JP A) between the City and the Florida Department of Transportation (FDOT), in the amount of $2,568,676.61, in State and Federal funds, as approved by Resolution No. 2000-23944, dated May 24,2000; and further authorize the appropriation of $134,480 from the General Fund Undesignated Fund Balance, for subsequent reimbursement by FDOT, under the provisions of the JPA. PASSED AND APPROVED, this the 14th day of March ,2001. , MAYOR ATTEST: -~~p~ CITY CLERK APPROVED A810 FORM & LANGUAGe l FOR EXECUTION 0.. ~ u't:}/o! ~ fI{i4\ .- F:\WOIlX\fTRA.v.MEU"'~.lS~MF.M SUMMARY SCOPE OF SERVICES FOR CONSULTING ENGINEERING SERVICES COLLINS A VENUE ROADWAY PROJECT, FROM 5TH TO 15TH STREETS THE MAJOR ELEMENTS OF THE SCOPE OF SERVICES ARE AS FOllOWS: 1. Preparation of construction plans for a drainage, milling, resurfacing, lighting, signalization and signage, and minor landscaping project for Collins A venue, from 5th to 15th Street, per City specifications. 2. The consultant will return the existing FDOT plans to the 30% level, and complete the plans according to the Scope of Services to be provided by the City, as part of the RFQ packet. 3. A minimum of sixteen (16) deep wells will be included in the plans to address poor drainage conditions at critical intersections. 4. New traffic signals will be planned and designed for the intersections of Collins A venue at 7th Street and 13th Street, due to the presence of public parking garages and intense pedestrian activity. Plans will also be prepared for the existing signals in order to ensure proper synchronization. 5. Special lighting will be planned, reflective of the historic district's character. 6. The plans will incorporate the limited one-way scheme developed by the City for the crossing streets, in order to a) improve traffic flow in the area by complementing the approved Ocean Drive traffic management plan; b) increase pedestrian safety; and c) help maximize on-street parking opportunities. 7. The plans will include minimum streetscaping of the corridor, where feasible. 8. Consultant will also submit the plans for approval by all pertinent permitting agencies. 9. The entire process shall not take longer than twelve (12) months to complete. F:\WORlNTI(Aw.IEU^'flXYI\S.l~IlFQ,MEM RESOLUTION NO. 2000-23944 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE BOTH A JOINT PARTICIPATION AND REIMBURSEMENT AGREEMENT AND A LOCAL AGENCY PROGRAM AGREEMENT WITH THE FLORIDA DEPARTMENT OF TRANSPORTATION, TRANSFERRING THE IMPLEMENTATION OF A ROADWAY PROJECT AND ITS LIGHTING COMPONENT TO THE CITY, ALONG WITH A COMBINED $2,568,676.61 IN STATE AND FEDERAL FUNDS, FOR THE FINAL DESIGN, CONSTRUCTION, AND CONSTRUCTION INSPECTION PHASES OF AlA/COLLINS AVENUE, FROM 5TH STREET TO 15TH STREET; AND FURTHER ACKNOWLEDGING THAT CITY FUNDS WILL BE APPROPRIATED FOR THE PROJECT, IN THE RESPECTIVE FISCAL YEAR(S) THE FUNDS WILL BE NEEDED, FOR SUBSEQUENT REIMBURSEMENT BY FDOT, IN ACCORDANCE WITH THE PROVISIONS OF THE AGREEMENTS. WHEREAS, the Florida Department of Transportation (FOOT) programmed a roadway reconstruction project for AlA/Collins Avenue, from 5th to 15th Street (the Project); and WHEREAS, the Project was supposed to be constructed in Fiscal Year 2000-01 and take approximately fourteen (14) months to complete; and WHEREAS, the City requested that major changes and additions be made to the Project plans, to minimize impacts to and better serve the needs of the Art Deco Historic District; and WHEREAS, the City also requested that the Project construction be rescheduled to Fiscal Year 2002-03; and WHEREAS, after negotiations between the City and FOOT, it was mutually agreed that, in the best interest ofall stakeholders and to ensure timely completion of the Project, the City should assume the lead role in the design and implementation of same; and WHEREAS, in order for the dedicated State and Federal funds to be transferred to the City for the purposes of the Project, a Joint Participation and Reimbursement Agreement, and a Local Agency Program Agreement for its lighting component, respectively, must be executed by the City and FOOT, prior to June 30, 2000; and WHEREAS, at future City Commission meetings, the City shall appropriate and advance funds for the Project, in the respective fiscal year(s) the funds will be needed, for subsequent reimbursements by FOOT; and WHEREAS, such reimbursements shall be made by FOOT within forty (40) days of receiving appropriate invoices from the City, for the Project. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission approve and authorize the Mayor and City Clerk to execute both a Joint Participation and Reimbursement Agreement and a Local Agency Program Agreement with the Florida Departmcnt of Transportation, transferring the implementation of a roadway project and its lighting component to the City, along with a combined $2,568,676.61 in State and Federal funds, for the final design, construction, and construction inspection phases of AlA/Collins Avenue, from 5th Street to 15th Street; and further acknowledge that City funds will be appropriated for the project, in the respective fiscal year(s) the funds will be needed, for subsequent reimbursement by FDOT, in accordance with the provisions of the Agreements. PASSED AND APPROVED this the 24th day of May .2000. MAyfl ATTEST: ~ f~JL- CITY CLERK APPROVED />S TO FORM & LANGUAGE & FOR execuTION f'II'I"'''''^I~MMI'J.''\I.ol'FSlJI'II.A5oI'-1VPO ~ ~Y<Tll J?A \ ,. ~: WPl No. 6114413 JOB No. 87060-3581 F.P. No. 250236-1-52-01 FLORIDA DEPARTMENT OF TRANSPORTATION JOINT P ARTICIP ATION and REIMBURSEMENT AGREEMENT Milling and Resurfacing Agreement for Collins Avenue This AGREEMENT, made and entered into this day of 2000, by and between the State of Florida, Department of Transportation, hereinafter referred to as the DEPARTMENT, and the City of Miami Beach, a political subdivision of the State of Florida, hereinafter referred to as the CITY. WITNESSETH WHEREAS, the DEPARTMENT has a roadway project scheduled for Collins Avenue between the limits of 5th to 15th Street consisting of: new signing and pavement markings and improvements to existing drainage system including the installation of deep wells; milling and resurfacing the pavement; reconstruct the broken sidewalk and curb and gutter; update all pedestrian ramps to meet ADA standards; coordinate utility relocation; new landscaping; new signalization and signalization improvements; updating of street lighting and public involvement, all elements hereinafter referred to as the "PROJECT", See Exhibit A, Project Description and Itemized Cost Estimate; and WHEREAS, the PROJECT is within the DEPARTMENT'S right of way and shall be constructed in accordance with the DEPARTMENT'S standards and specifications; and WHEREAS, the CITY has agreed to complete the PROJECT design, let the consultant and construction contracts, administer and supervise the construction of \lie PROJECT, within the rules and guidelines outlined in this Agreement and the governing laws and ordinances; and WHEREAS, the DEPARTMENT estimated the PROJECT cost as $2,055,610.61 million dollars, See Exhibit A; and WHEREAS, the DEPARTMENT has agreed to reimburse the CITY for PROJECT costs in accordance with procedures outlined in this Agreement and the documentation submitted by the CITY; and WHEREAS, the DEPARTMENT and the CITY have determined that it would be to the best interest of the general public and the citizens of Miami Beach to enter into this Agreement; and Construction Cost ACTIVITY DESCRIPTION ROADWAY/MOT (180 DAYS) SIGNING/MARKING PLANS LIGHTING SIGNALIZATION LANDSCAPING STATE FUNDS $1,379,027.05 $101,530.87 r PAID FOR UNDER LAP AGREEMENT $86,044.20 $6,120 SUBTOTAL $1,572,722.12 CEI COST 15% OF CONSTRUCTION COST $235,908.32 PUBLIC INVOLVEMENT COST 150,000 TOTAL COST $1.958.630 TOTAL CONSTRUCTION COST TOTAL STATE FUNDS (CONSTRUCTION & DESIGN)= GRAND TOTAL= (CONSTRUCTION COST + DESIGN COST)= LIGHTING (CONSTRUCTION & CEI UNDER LAP AGREEMENT) = "I EXHIBIT A ( $1.956.630.44 $2,055,610.61 . , ^'>" $2.055,610.61 $5t3.066 .' I, 2 of 14 PROJECT LOCATION: COLUNS AVENUE FROM 5TH STR,.eEJ TO 'lS:rH STREET PROJECT SCOPE; THE SCOPE OF WORK CONSISTS OF MILLING AND RESURFACING OF S.R. A1A {COLLINS AVE.) IN THE CITY OF MI.e..MI BEACH FROM 5TH STREET TO 1STH STREET. THIS PROJECT ALSO tNCLUOES REPUCING THE EXISTING lIGHTING SYSTEM, ALLEVIA TfNG EXISTING DRAINAGE SYSTEM AT FLOOD PRONE AREAS WITH DEEP WELLS, NEW SIGNING AND PAVEMENT MARKINGS. UPDATING ALL PEDESTRIAN RAMP$ TO MEET ADA. STANOARDS, REPLACING ANY BROKEN SIDEWALK AND CURB, $IGNALIZA TION IMPRovEMENTS AND NEW LANDSCAPING. ; ACTIVITY DESCRIPTION ROADWAY SIGNING/MARKING PLANS SIGNALIZATION PLANS LIGHTING PLANS LANDSCAPE PLANS HOURLV RA~ $32.00 $25 $17.00 $12.00 SUBACTN1TY DESIGN ANALYSIS DRAINAGE ANAL YSI$lREPORT KEYSHeer TYPICAl.. SECTION SHEET OEfAt\. SHEET GENERAL AND PAY ITEM NOTES TABULATION OF QUANTlTlES ROADWAY PlAN SHEETS DRAINAGE DETAIL SHEET DRAINAGE STRUCTURE SHEET SUMMARY OF DRAINAGE SHEET TRAFFIC CONTROL. SHEETS CESISUMMARY OF PAY ITEMS llill!!ll!l I!llI!W IIAEE lm!I lm!I mlUn Ill1!IM LS 0 1:lO LS 0 120 EA 8 1 8 EA 16 2 32 EA 8 1 8 EA 8 2 18 EA 8 .1 6 EA 32 15 460 EA 6 2 16 EA 16 3 48 EA 16 1 16 EA 6 4 32 LS 1 8 6 EA 4 1 4 EA 8 1 6 EA 12 15 180 LS 1 6 8 EA 4 1 4 FA 6 1 8 fA 16 3 '8 EA 2 2 4 LS 1 8 8 EA 4 1 4 EA 12 1 12 EA 12 1 12 EA 24 15 360 LS 1 24 24 LS 1 8 8 EA 4 1 4 EA 4 1 4 EA 4 1 4 EA 4 1 4 EA 4 2 8 EA 8 3 2. LS 1 8 8 HOURLY TOTALS 1660 30% REDUCTION 498 TOTAL HOURS 1162 PERCFNTAGE Ill1!IM &!lU 10% 116.2 $3,718..4Q 38% 406.7 $10.1$7.50 60% 697.2 $11,682.4 S% 86.1 $697.20 TOTAL COST $26,438.so OVERHEAD $42.296.80 OPERATING MARGIN $8.24T.88 PERMITS ....1lOO TOTAL LUMP SUM FEE $96,980.18 1 of, 14 KEYSHEET TAbULATION OF aUANTITIES PLAN SHeETS CESISUMMARY OF PAY ITEMS KEYSHEET TABULATION OF QUANTITIES PLAN SHEET oeTAIL SHEET CES\SUMMARY OF PAY ITEMS XEVSHEET TABULATION OF QUANTITIES POlE DATA LIGHTING PLANS LIGHTING ANALYSIS REPORT CESlSUMMARY OF PAY ITEMS KEYSHeET SUMMARY OF QUANTITIeS PLANT lOCATION SHEI:.T GENERAl. NOTES SHEET DEl AIL SHEET PlAN SHEET CES\sUMMARY OF PAY ITEMS CLASSIFICATlON PROF. ENGINEER DESIGN ENGtNER TECHNICfAN SECRETARV EXHIBIT A 02/07/2001 12:08 305-470-5510 FDOT DIRECTORS OFFIC PAGE 01 ~ Florida Department of Transportation JEll BUSH GOVERNOR THOMAS F. BARllY. JR. SECRETARY MEMORANDUM VIA FACSIMILE One page to (305) 673-7028 February 6. 2001 To: Amelia L. Johnson, Transportation Coordinator, City of Miami Beach From: David A. Rosemon~ Re: Percentage of Public Involvement funds for the Final Design Phase of the AlA/Collins Avenue Project, from 5th to 151h Streets. As per my phone conversation with you and Joseph Johnson, please be advised of the authorization of 20% of the $150.000 Public Involvement allocation for this project (or $30,000) to be added for public involvement activities to the final design phase of the aforementioned project. As discussed. there shall be an additional 5% earmarked as contingency for the same objective if the original 20% allocated proves insufficient to complete its objective. Should you have any questions, please do not hesitate to contact me. Thank you. cUJ.lA'~ ~f) · f!9 qi# cc: Jose Abreu Delfin Molins WoNw.dot.state.fl.us C!> RECYC!.EO P"PER LPA FORM 5~.Q10.40 CONSTR:UCTIOIII OGC . 05100 AGENCY NAME & BILLING ADDRESS FIN 'NO. STATE OF FLORIDA OEPARTMENT OF TRANSPORT"T10N 24968715801 LOCAL AGENCY PROGRAM City of Miami Beach AGREEMENT 1700 Convention Center Drive EXHIBIr-B- Miami Beach, FL. 33139-1819 Estimate of Funding PROJECT DESCRIPTION Name Collins Avenue Lighting Termini 5th to 15th Street Length ESTIMATE OF FUNDING TYPE OF WORK (1) (2) (3) TOTAL PROJECT AGENCY FUNDS STATE & FEDERAL FUNDS FUNDS P.E. a. Agency Work b. Other c. Department Services d. Total PE Cost Estimate (a+b+c) Right-of-Way e. Agency Work .. -.-----------. -----_. ------- f. Other g. Department Services h. Total PE Cost Estimate (o+f+g) Construction 1. Contract 446,144.35 446,144.35 I. Other k. Other I. Other m. Total Contract Costs (l+j+k+l) 446,144.35 446,144.35 Construction Engineering n. Agency 68,921.65 68,921.65 o. Other p. Department Forces q. Total Construction Engineering (n+o+p) 66,921.65 66,921.65 r. Total Construction Cost Estimate (m+q) 513,066.00 513,066.00 s. TOTAL COST ESTIMATE OF THE 513,066.00 513,066,00 PROJECT (d+h+r) CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139 http:\\ci.miami-beach.f1.us TO: FROM: SUBJECT: I '1)-0/ COMMISSION MEMORANDUM NO. Mayor Neisen O. Kasdin and Members of the City Commission DATE: March 14, 2001 Jorge M. Gonzalez City Manager J~ A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AUTHORIZING THE ISSUANCE OF A REQUEST FOR QUALIFICATIONS FOR THE COMPLETION OF FINAL DESIGNIENGINEERING PLANS FOR A MODIFIED ROADWAY PROJECT ON COLLINS A VENUE, FROM 5TH TO 15TH STREETS, IN AN AMOUNT NOT TO EXCEED $134,480, TO BE FUNDED AS PART OF A JOINT PARTICIPATION AGREEMENT (JPA) BETWEEN THE CITY AND THE FLORIDA DEPARTMENT OF TRANSPORT A TION (FOOT), IN THE AMOUNT OF $2,568,676.61, IN STATE AND FEDERAL FUNDS, AS APPROVED BY RESOLUTION NO. 2000-23944, DATED MAY 24, 2000; AND FURTHER AUTHORIZING THE APPROPRIATION OF $134,480 FROM THE GENERAL FUND UNDESIGNA TED FUND BALANCE, FOR SUBSEQUENT REIMBURSEMENT BY FDOT, UNDER THE PROVISIONS OF THE JPA. ADMINISTRATION RECOMMENDATION Adopt the Resolution. ANALYSIS Approximately one year ago, as a result of extensive negotiations between the Administration and the Florida Department of Transportation (FDOT), it was decided that the City should assume the lead role in final design and implementation of a roadway project for AlA/Collins A venue, from 5th to 15th Streets (the Project), which includes drainage, milling, resurfacing, striping, lighting, signage and signalization, plus minor landscaping. By assuming the lead role, the City will be able to modify the Project in order to minimize the impacts to, and better serve the needs of the Art Deco Historic District and its stakeholders. Accordingly, Resolution No. 2000-23944, dated May 24, 2000, approved both a Joint Participation Agreement (JP A) and a Local Agency Program Agreement (LP A) for the transfer of Project funds to the City. No local matching funds are required. AGENDA ITEM e7L 3-/f-cJj DATE March 14,2001 Commission Memorandum RFQ Final Design/Collins Ave. Project, 5th-15th Streets Page 2 The City reasoning for taking over this particular Project was based on the following facts: o FDOT had scheduled a full roadway reconstruction project for Collins A venue, from 5th to 15th Streets, to begin this fiscal year (2000-01), take approximately 14 months to complete, and coincide with its northern counterpart project, from Lincoln Road to 26th Street. \) The original FDOT reconstruction plans also included only minor drainage and lighting components, and a one-way plan for the crossing streets that failed to meet the City requirements and special needs for the project. o In order to incorporate the substantial changes requested by the City, the Project's final design and engineering plans would have to be returned to the 30% completion level (from the present 65%). FDOT did not agree to revise the plans and offered, instead, to turn the Project over to the City. The benefits to the City from a transferred and modified Collins A venue Project, from 5th to 15th Streets will be as follows: 1. A Collins A venue Project that will be planned and constructed by City specifications, but 100% funded by State and Federal sources, via the reimbursement method. 2. The original roadway reconstruction will become a drainage/millinglresurfacingllighting and minor landscaping Project, due to the newly-defined neighborhood collector nature of this narrow two-lane corridor, and the intensive pedestrian activity in the area. This less- intensive Project, will involve manageable construction impacts and will be done quickly by a qualified contractor to be hired by the City, in the appropriate fiscal year. 3. A consulting engineering firm will be hired by the City to return the existing FDOT plans to the 30% level, and complete the plans according to the Scope of Services provided by the City, and attached hereto as part of the RFQ packet. 4. A minimum of sixteen (16) deep wells will be included in the plans to address poor drainage conditions at critical intersections. 5. New traffic signals will be planned and designated for the intersections of Collins Avenue at 7th Street and 13th Street, due to the presence of public parking garages and intense pedestrian activity. 6. Specia11ighting will be installed, reflective of the historic district's character. 7. The Project will incorporate the limited one-way scheme developed by the City for the crossing streets, which will a) improve traffic flow in the area by complementing the approved Ocean Drive traffic management plan; b) increase pedestrian safety; and c) help maximize on-street parking opportunities; and March 14,2001 Commission Memorandum RFQ Final Design/Collins Ave. Project, 5th-15th Streets Page 3 8. The Project construction will be rescheduled to FY 2002-03, or as convenient to the City. FUNDING. All funds to be appropriated/fronted by the City for this Project, as a multi-year packet, will be reimbursed by FDOT within 45 days of invoice receival, in accordance with the provisions of two (2) funding documents, which were jointly approved by Resolution No. 2000- 23944, dated May 24,2000. Combined, these documents approved $2,568,676.61 in State and Federal funds for the Collins A venue Project, from 5th to 15th Streets, as follows: 1. Joint Participation Ar:reement (JPA) for the State funds. This JP A, already fully executed by the City and FDOT, will fund the following Project categories: Final design/engineering/permitting (from 30% level): PIP during design (25%) and construction (75%) phases Roadway, signing, signalization, landscaping construction: Construction engineering inspection-CEI $ 96,980.18 150,000.00 * 1,572,722.12 235.908.31 Total Design/Construction Cost (JPA) ............................ $2,055,610.61 The $2,055,610.61 does not include the cost of installing deep wells, which will be added to the lPA by FDOT, after the Project's Final Design phase reaches the 90% level, and a final cost estimate is available. 2. Local Agenc:v Pror:ram Af{reement (LPA}for the Federalfunds. The LPA for the lighting component of the Project, was executed by the City, and will be executed by the appropriate Federal agency only after the lighting plans are completed, as part of the Project's Final Design phase, which is funded by the above-mentioned lPA. The LPA will fund the following Project categories: Lighting component construction: Lighting construction engineering inspection (CEI): $ 446,144.35 66.921.65 Total Lighting Construction Cost (LPA) ..................... $ 513,066.00 Fundinl! for the Purposes of this RFQ for Final Desien Se",ices: The Administration proposes that $134,480 be appropriated from the General Fund Undesignated Fund Balance, for subsequent reimbursement by FDOT, under the provisions of the JP A. The Final Design funds shall be handled as follows: Final design, engineering, permitting (begins at 30% level) $ Final design's public involvement (PIP) component Contingency funds (for public involvement only) Total funds for the purposes of this RFQ ....................... $ 96,980 30,000 (20% of $150,000) * 7.500"" (5% ofs.me) * 134,480 1& The $7,500 in contingency funds may be expended only after written pre-approval, per each instance, by both the City and FDOT Project Managers. March 14,2001 Commission Memorandum RFQ Final Design/Collins Ave. Project, 5th-15th Streets Page 4 Subsequent appropriations will front the funds for other specific Project phases, such as a public involvement program, Project construction, and construction inspection. It is essential that the Final DesignlEngineering phase of the Collins A venue Project, from 5th to 15th Streets, be completed early in 2002, in order for the City to meet the projected construction schedule of 2002-03. The Administration recommends approval of the Resolution. IAJ~ Attach ents: Resolution No. 2000-23944, dated May 24, 2000 Estimate of FundingIRoadway - JP A (3 pages) Letter from FDOT - JP A' s Public Involvement funds for the Final Design phase Estimate of FundingfLighting - LP A (1 page) Proposed Resolution RFQ/Scope of Services P,\~Il.A\AMEU^IfIlO1"<S.I~Rl'Q.MI!M