Loading...
96-22004 RESO RESOLUTION No. 96-22004 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROPRIATING $105,000 FROM REALLOCATED BOND FUND 351, AND INCREASING EXISTING WORK ORDER 351.2126, FOR ELECTRICAL CONDUIT BRIDGE ATTACHMENTS TO THE VENETIAN ISLANDS CAUSEWAY, IN THE FPL OVERHEAD TO UNDERGROUND CONVERSION PROJECT. WHEREAS, the Venetian Causeway Bridge Rehabilitation Project has commenced; and WHEREAS, the overhead systems on the Venetian Causeway, consisting of Florida Power and Light, BellSouth and Gold Coast Cable, should be undergrounded in keeping with the improvements of similar main entryways to the City, such as the McArthur Causeway; and WHEREAS, the Venetian Islands Homeowners Association, Inc. is requesting the undergrounding of utilities and beautification of the Venetian Causeway and the Venetian Islands; and WHEREAS, on September 26, 1994 and September 27, 1995, the Mayor and City Commission approved funds for the Venetian Islands Landscaping and Utilities Undergrounding studies; and WHEREAS, Florida Power and Light has estimated considerable savings in the cost of undergrounding the currently overhead electrical power system, if bridge attachments and other construction provisions are provided during the construction of seven of the Venetian Causeway bridges; NOW, THEREFORE, BE IT nUL Y RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that $105,000 be appropriated from reallocated Bond Fund 351, and Work Order 351.2126 be increased to fund the bridge attachments and other construction provisions to be undertaken by Florida Power and Light, for the overhead to underground conversion project of the Venetian Causeway, within the City of Miami Beach municipal boundaries. June PASSED AND ADOPTED THIS 5th ATTEST: ;U' 'rr -.-\:- R 0 U' ~iJAC,~ Manage!\: CITY CLERK I"ORM APPRO'v ByLJllfA Dde ~/96. CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH FLORIDA 33139 CITY OF ML~MI BEACH COMMISSION MEMORANDUM NO. ..3.ll:::lJ.a TO: Mayor Seymour ~Iber and Memben of the City Commission DATE: June 5, 1996 FROM: Jose Garcia_pedro/!iS City Manager . A RESOLUTIO APPROPRIATING $105,000 FROM REALLOCATED BOND FUND 351 AND INCREASING EXISTING WORK ORDER 351.2126 FOR ELECTRICAL CONDUIT BRIDGE ATTACHMENTS TO THE VENETIAN ISLANDS CAUSEWAY, FOR OVERHEAD TO UNDERGROUND FPL CONVERSION PROJECT. SUBJECT: ADMINISTRATION RECOMMENDATION: To approve the Resolution. BACKGROUND On September 26, 1994, the City Commission approved a $70,000 line item of the General Fund Budget for landscape/streetscape design and engineering studies to underground the existing overhead utilities on the Venetian Causeway and the perimeter roads within Belle Isle, Rivo Alto, Di Lido, and San Marino Islands. On September 27, 1995, the City Commission approved an additional $91,345.00 under Special Projects for the Venetian Islands and Causeway Landscape for a total of $161,345. On October 1995, the Venetian Causeway bridge rehabilitation project commenced. The North side concrete work to the bridge structures is scheduled to be completed by July 1996. The City, after obtaining preliminary estimates from the utilities, initiated and paid for the undergrounding studies in November 1995. FPL is presently engineering the undergrounding of the overhead power lines on the Venetian Causeway and will have a final binding cost estimate by the end of September 1996. During the studies. FPL estimated that installation of conduits at the South side of seven of the Venetian Causeway bridges during the construction phase of these bridges would cost $105,000 as compared to $475,000 for the cost of directional boring, once the bridges are constructed and the road paved. AGENDA ITEM C-1H ~-5-9~ DATE COMMISSION MEMORANDUM Page 2 June 5, 1996 ANALYSIS As of this date, FPL has been paid $12,552 for the engineering studies to underground the overhead power on the Venetian Causeway. The proposed $105,000 funding of the conduits and hanger system on the bridges and the engineering costs will be credited towards the future cost of the undergrounding project. CONCLUSION The City Commission should authorize the attached resolution appropriating $105,000 from reallocated Bond Fund 351 and increasing existing work order 351.2126 to fund bridge attachments and other construction provisions to be undertaken by Florida Power and Light, for the overhead to underground conversion project of the Venetian Causeway, in the City of Miami Beach municipal boundaries. \/'. JGP/HM/JGdP/DCI A V IVGK C:\ WPWIN601 WPDOCSICOMMEMOI VENCSWYI VENFPL. WPD