Loading...
2008-26783 ResoRESOLUTION NO. 2008-26783 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE REALLOCATION OF FUNDING, TO FUND CHANGE ORDER NOS. 2 AND 6 FOR THE BELLE ISLE BID PACKAGE NO. 136 PROJECT AS FOLLOWS: $799,628, FROM WATER AND SEWER BOND FUND 424, PREVIOUSLY APPROPRIATED IN THE FISCAL YEAR 2006-2007 CAPITAL BUDGET, FOR CONSTRUCTION OF THE VENETIAN ISLANDS NEIGHBORHOOD RIGHT-OF-WAY IMPROVEMENT PROJECT BID PACKAGE NO. 13C (SAN MARINO, DI LIDO, AND RIVO ALTO ISLANDS), WITH FUNDING TO BE REPLACED WITH FUTURE WATER AND SEWER BONDS; IN ADDITION, REALLOCATING FUNDING IN THE AMOUNT OF $640,000, AVAILABLE FROM STORMWATER BOND FUND 428, APPROPRIATED IN PREVIOUS YEARS' CAPITAL BUDGETS FOR THE CONSTRUCTION OF BID PACKAGE NO. 13C, WITH FUNDING TO BE REPLACED WITH FUTURE STORMWATER BONDS. WHEREAS, in August 2005, CIP issued a request for a cost proposal from the Job Order Contractor (JOC), Alpine Construction Management Corporation (Alpine), for the construction of the Belle Isle Neighborhood Right of Way (ROW) Improvement Project, Bid Package No. 13B(Project); and WHEREAS, the scope of services that were outlined in the proposal for the Project included the installation of water mains, storm drainage system and pump station, street lighting, roadway reconstruction, parking, traffic signage and pavement marking, re-grading of the entire Belle Isle Park, landscaping, irrigation, site furnishings, pedestrian lighting, "bark-park", and new walkways; and WHEREAS, on December 2, 2005, Alpine submitted its final negotiated cost proposal, in the amount of $5,603,638, which was within the budget appropriated for the Project; and WHEREAS, on December 8, 2005, and May 16, 2006, respectively, the City issued the First and Second Notices to Proceed (NTP) on the Project; and WHEREAS, in late 2005, during the permitting process, Miami-Dade County Public Works-Traffic Engineering Division, mandated extensive changes to the construc)ion documents; and WHEREAS, the City Administration also requested changes to the construction documents; and WHEREAS, in January 2006, the construction documents were revised as a result of requested scope changes; and WHEREAS, in addition to the City requested changes to the scope, there were errors and omissions, unforeseen conditions, and betterment issues; and WHEREAS, Alpine has submitted requests for adjustments to the original Contract price; and WHEREAS, the total amount of the Change Orders requested by Alpine is $2,841,017; and WHEREAS, as a result of extensive analysis and negotiation, the requested amount was reduced by $764,145, to $2,076,872; and WHEREAS, of this amount, $587,242, has been previously paid for (from the original Project contingency appropriation) in Change Order Nos. 1, 3, and 5; and WHEREAS, a portion of Change Order No. 6 ($24,922) will be paid using Project contingency from the original appropriation; and WHEREAS, Change Order No. 4 corresponds to a deductive amount of $485,953, that was issued for direct purchases of equipment made by the City on Alpine's behalf (in the amount of $460,873; resulting in $25,080 of tax savings to the City); and WHEREAS, Change Order No. 2 relates to repairs to unexpected water main breaks; and WHEREAS, Change Order No. 6 relates to unforeseen and differing site conditions, which required installation of sheet piles, helical piles and structural slabs, essential work inadvertently omitted from the construction documents, such as the connection of fire lines to all high rise and commercial buildings, and additional work resulting from design errors and omissions; and WHEREAS, approval is hereby requested for Change Order Nos. 2 and 6, for a total of $1,439,628; and WHEREAS, funding, in the amount of $799,628, is recommended to be re-allocated from previously approved Water and Sewer appropriations for the Venetian Island Right-of- Way Improvement Bid Package No.13C (Account 424-2127-069357), to be replaced with future Water and Sewer bonds; and WHEREAS, funding, in the amount of $367,123, is recommended to be re-allocated from previously approved Stormwater appropriations for the Venetian Island Right-of-Way Improvement Bid Package No.13C (Account 428-2127-069357), and $272,877 (from Account 428-2127-060357), to be replaced with future Stormwater bonds; and WHEREAS, the Administration hereby recommends re-allocation of these funds to complete the Project. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND THE CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby approve re-allocation of funding, to fund Change Order Nos. 2 and 6 for the Belle Isle Bid Package No. 13B Project as follows: $799,628, from Water and Sewer Bond Fund 424, previously appropriated in the Fiscal Year 2006-2007 Capital Budget for construction of the Venetian Islands Neighborhood Right-of-Way Improvement Project Bid Package No. 13C (San Marino, Di Lido, and Rivo Alto Islands), with funding to be replaced with future Water and Sewer bonds; in addition, re-allocating funding, in the amount of $640,000, from Stormwater Bond Fund 428, appropriated in previous years' Capital Budgets, for the construction of Bid Package No. 13C, with funding to be replaced with future Stormwater bonds. PASSED and ADOPTED this 12th day of March 2008. APPROVED AS TO FORM NGUAGE -&FO ELUTION „U,/~jo~/ :IfY IfERK A I HERRER BO ER, AV~I Yak ~/',"1 3 2~ o s' ev , .. COMMISSION ITEM SUMMARY Title: A Resolution, approving and authorizing the re-allocation of funding in the amount of $799,628, from Water and Sewer Bond Fund 424; reallocation of funding in the amount of $640,000, from Stormwater Bond Fund 428; all appropriated in previous years Capital Budgets for Bid Package No.13C (San Marino, Di Lido and Rivo Alto Islandsl: to fund additional construction costs for the Belle Isle Bid Package No.13B Project. Intended Outcome quality capital projects. Supporting Data (Surveys, Environmental Scan, etc.): In the 2007 Community Satisfaction Survey, indicated that Miami Beach, when compared with similar cities, ranked in the forty percentile for storm i drainage improvements. Completing the stormwater pump station at Belle Isle, and other needed improvements will improve this rating. Issue: the City Commission Item Summa /Recommendation: In August 2005, CIP issued a Request for Cost Proposal to the Job Order Contractor (JOC), Alpine Construction Management Corporation (Alpine), for the construction of the Belle Isle Neighborhood Right of Way (ROW) Improvement Project, Bid Package No. 13B (Project). On December 2, 2005, Alpine submitted its final negotiated cost proposal in the amount of $5,603,638. At that time, this amount was within the budget appropriated for the Project. In late 2005, during the permitting process for the Project, Miami-Dade County Public Works Department- Traffic Engineering Division (County) mandated extensive changes to the Construction Documents (CDs). In addition, the City's operating department requested changes to the CDs. The changes included pump equipment modification, piping changes, among others. In January 2006, as a result of scope changes requested by the regulatory agencies having jurisdiction, the City's Consultant, Jacobs Edwards and Kelsey, performed a series of revisions to the pre-approved permit set of CDs. Alpine was advised that revisions to the CDs were necessary to obtain the final permit, and was subsequently given a Notice to Proceed (NTP) with all other improvements, except those related to the construction of the pump station. Subsequent changes made to the Pump Station, resulted in requests for adjustment to the contract price. Approximately forty-four percent (44%) of Alpine's overall Proposed Change Orders (PCO) can be attributed to Unforeseen Conditions; twenty (20%) percent to Betterment Issues; thirteen (13%) percent to Regulatory Agencies' requested changes; twenty-two (22%) percent to Design Errors and Omissions; and one (1 %) percent to Owner and Resident Requested Scope Changes. In order to complete the Project, the Administration is requesting the re-allocation of $799,628, from the previously approved Water and Sewer Bond appropriations; and $640,000, from the previously approved Stormwater Bond appropriations, to be replaced with future bonds. Advisory Board Recommendation: Amount Account Approved Source of Funds: OBPI $799,628 424-2127 - 069357 (Construction) $367,123 428-2127 - 069357 (Construction) $272,877 428-2127 - 060357 (Construction) Total $1,439,628 Department Director sist nt City Manager City anager JECh TH JMG T:\AGENDA\2008\February 13\RegularWpine Cons n Contract Adjustrnent Summary.doc ~ MIAMI BEACH AGENDA ITEM `~.~ ~~/ DATE [D MIAMIBEACH City of Miami Beach, 7700 Convention Center Drive, Miami Beach, Florida 33739, www.miamibeachfl.gov COMMISSION MEMORANDUM TO: Mayor Matti H. Bower and Members of the City Commission FROM: City Manager Jorge M. Gonzalez ~ ~ 't~' DATE: March 12, 2008 SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE REALLOCATION OF FUNDING, IN THE AMOUNT OF $799,828, FROM WATER AND SEWER BOND FUND 424, PREVIOUSLY APPROPRIATED IN THE FISCAL YEAR 2006-2007 CAPITAL BUDGET, FOR CONSTRUCTION OF THE VENETIAN ISLANDS NEIGHBORHOOD RIGHT-OF-WAY IMPROVEMENT PROJECT BID PACKAGE N0.13C (SAN MARINO, DI LIDO, AND RIVO ALTO ISLANDS), TO FUND IMPROVEMENTS FOR THE BELLE ISLE BID PACKAGE NO. 13B, WITH FUNDING TO BE REPLACED WITH FUTURE WATER AND SEWER BONDS; IN ADDITION, REQUESTING AUTHORIZATION TO REALLOCATE FUNDING, IN THE AMOUNT OF $640,000, AVAILABLE FROM STORMWATER BOND FUND 428, APPROPRIATED IN PREVIOUS YEARS' CAPITAL BUDGETS FOR THE CONSTRUCTION OF BID PACKAGE N0.13C, WITH FUNDING TO BE REPLACED WITH FUTURE STORMWATER BONDS, TO FUND ADDITIONAL CONSTRUCTION COSTS FOR THE BELLE ISLE BID PACKAGE NO. 13B PROJECT. ADMINISTRATION RECOMMENDATION Adopt the Resolution. FUNDING Funding in the amount of $799,628, is recommended to be re-allocated from previously approved Water and Sewer appropriations for the Venetian Island Right-of-Way Improvement Bid Package No.13C, account 424-2127-069357, to be replaced with future Water and Sewer Bonds. Funding in the amount of $367,123, is recommended to be re- allocatedfrom previouslyapproved Stormwater appropriations forthe Venetian Island Right- of-Way Improvement Bid Package No.13C, account428-2127-069357, and $272,877, from account 428-2127-060357, to be replaced with future Stormwater Bonds. ANALYSIS The Belle Isle Project is a unique and complex capital improvement project located within a restricted mixed use area, with medium and high density residential, commercial, and single family homes located along the perimeter of an urban park, and bisected by the Venetian Causeway. The project offers the multiple challenges associated with working within a limited and restricted work zone. W ith a wide range of complex activities, the project encompasses: construction of extensive above-ground facilities; comprehensive underground utilities installation that include a major storm water pump station and treatment structures; a drainage collection, treatment and disposal system consisting of over four thousand (4,000) lineal feet of piping; new water main installations consisting of over three thousand (3,000) City Commission Memorandum -Alpine Construction Contract Adjustment March 12, 2008 Page 2 of 7 lineal feet of piping and water service connections; new fire service lines to all high-rise buildings; complete roadway reconstruction; installation of new sidewalks, curbs and gutters and pedestrian crossings; site and pedestrian lighting; landscaping and automatic landscape irrigation; construction of a temporary parking lot to accommodate resident /visitor parking during construction; and the complete reconstruction of Belle Isle Park, including the planting of over 100 new trees and the re-planting of existing tree species. The Belle Isle Project construction also had to be coordinated with multiple other concurrent construction projects from other agencies which impacted the project schedule and included: an un-planned major FPL 700-foot long concrete duct bank installation along Island Avenue South to improve service reliability to the Island; complete replacement of existing CATV cabling by Atlantic Broadband; complete replacement of existing gas service lines by TECO Gas; Miami-Dade County refurbishment of the Venetian Causeway bridges adjacent to the project; construction of the new sewage Pump Station No.10 within the Park; and numerous renovation and construction activities associated with the contiguous high-rise buildings. The purpose of this funding request is to fund a series of negotiated Change Order requests that were primarily generated as a result of unforeseen/unexpected conditions, betterment issues, errors and omissions, and regulatory agency requested changes. ReauestforJob OrderContractinst Cost Proposal forthe Construction ofthe Belle Isle Bid Packaste No. 136 Proiect In August 2005, in an effort to expedite the Project, CIP issued a Request for Cost Proposal to the Job Order Contractor(JOC), Alpine Construction Management Corporation (Alpine), for the construction of the Belle Isle Neighborhood Right of Way (ROW) Improvement Project, Bid Package No. 13B. The Scope of Services in the proposal forthe Belle Isle Neighborhood Right-of-Way components included: the installation of water mains; storm drainage system and pump station; street lighting; roadway reconstruction, including milling and resurfacing; parking; traffic signage and pavement markings; landscaping and irrigation. The improvements to the Belle Isle Park included re-grading of the entire Park; landscaping and irrigation, site furnishings, pedestrian lighting, "bark-park",and newwalkways within the park. The stormwater system is ninety percent (90%) complete; the water main installation is complete and in service, and most of the other right-of-way improvements are completed. The contractor is working toward completing the improvements within the Park, and placing the storm drainage pump station into operation by July of 2008. Contract Nestotiations and Construction Notice to Proceed On September 18, 2005, and on November 19, 2005, the City received cost proposals from Alpine in the amounts of $6,349,495 and $5,895,504, respectively. The City held extensive negotiations with Alpine, which resulted in the submittal of a third and final proposal on December 2, 2005, in the amount of $5,603,638, for the construction of the Belle Isle Bid Package No. 13B Project. The City and its Program Manager, Hazen and Sawyer (H&S) evaluated the proposal and recommended the execution of the Contract for that amount. Since funding for the Projectwasalready appropriated by the City Commission in the Capital Budget, and the proposed Contract amount was within the budgeted amount for the Project, no further Commission action was required. On December 8, 2005, the City issued Alpine's First Notice to Proceed (NTP) on the Project, which allowed Alpine to comply with the preliminary Contract requirements, such as submittal of schedules, and finalization of the required permits. Subsequent to the initial Contract negotiations, additional design modifications, including the stormwater pump station and associated piping, were requested by regulatory agencies, which resulted in a need to revise the Construction Documents (CDs). Upon completion of City Commission Memorandum -Alpine Construction Contract Adjustment March 12, 2008 Page 3 of 7 the initial revision by the City's Consultant, Jacobs Edwards and Kelcey (JEK), it was possible to move the project into construction while design revisions to the pump station and associated piping were being completed. It was determined at that point, that no adjustment to the original Contract Price would be made in anticipation that the redesign would likely result in a Contract cost increase. Consequently, on May 3, 2006, during the Pre-Construction meeting, the City advised Alpine, that the review processes with the agencies having jurisdiction resulted in changes to the CDs dated November 29, 2005. In addition, Alpine was advised that revisions to the drawings were necessary to obtain the final permits, and issue the Second NTP. On May 16, 2006, the City issued the Second NTP, allowing the contractor to mobilize on site, and commence construction activities. At that time a revised set of CDs indicating that the pump station and associated piping were excluded from the project scope provided to Alpine. The pump station and associated piping revisions were reintroduced to the Project at a later date. The flexibility of using the JOC construction delivery method facilitated this approach, and allowed the expediting of the Project construction activities by the contractor. In late 2005, during the permitting process for the Belle Isle Project, Miami-Dade County Public Works Department-Traffic Engineering Division (County) mandated extensive changes to the CDs. The City, in conjunction with the County, reviewed the alternatives and arrived at a solution on the required modifications. On August 1, 2005, the proposed changes were presented to, and accepted by the Belle Isle Community. The Construction Documents were then revised to reflect these changes, which were later presented to the County by JEK and City staff for final approval during meetings held on December 20, 2005, and January 25, 2006. In January 2006, as a result of scope changes requested by the County, JEK performed a series of revisions to the pre-approved permit set of CDs. The City, Hazen and Sawyer, and JEK carefully evaluated whether the changes were regulatoryornnn-regulatory, and if they would result in material changes to the Project scope, the construction costs and impact to the project schedule. The changes requested were material, and accounted for a portion of Change Order No. 1. Citv of Miami Beach Following the receipt of the final JOC proposal, but prior to the issuance of the NTPs, the City requested additional changes to the CDs. The modifications included the selection of different size pumps and associated electrical panels, and changes to piping materials, from PVC to ductile iron for the stormwater lines on the Venetian Causeway. The Project team (JEK, H&S, CIP) evaluated these changes, and determined that they were necessary since changes in the pump selection alone, would significantly reduce equipment energy consumption and long term maintenance costs. Alpine was subsequently issued the second NTP with all other improvements, except those related to the construction of the pump station. At that time, Alpine was advised that when the pumps were reincorporated into the project scope of work, any associated impacts to the contract price would be addressed. Unforeseen/Unexpected Conditions: Unforeseen/Unexpected conditions include differing site conditions, such as sub-surface or hidden conditions, that could not be anticipated based on the existing available geotechnical data, underground conditions, and incomplete or inaccurate records. These may have a significant impact on the time and cost of performing the work. City Commission Memorandum -Alpine Construction Contract Adjustment March 12, 2008 Page 4 of 7 Sheet Piles Helical Piles & Structural Slabs During the design phase of the project, soil samples were taken in several locations which did not detect conditions found in the vicinity of the pump station. As operations commenced to install the sheet piling and pump vault structure, unsuitable soil materials were discovered in the vicinity of these structures. Therefore, additional soil samples and geotechnical evaluations were conducted to determine soil conditions in the locations scheduled to receive these underground structures. The unsuitable soils encountered, require that the sheet pile equipment rentals, included in the original contract price, would now have to remain in place to stabilize the surrounding unsuitable soils. This affected the contractor's construction Means and Methods, thus resulting in unexpected additional construction costs. Additional engineering design was required for the pump station vault, placement of helical piles, and support slabs. Suitable fill material had to be brought on site, and the unsuitable soils disposed of properly off site. Emeraencv Reaairs and Relocation of Aaed Utilities During the installation of the new 12-inch water main on Century and Farrey Lanes, there were numerous unexpected water main breaks in the existing 2-inch water service lines to the properties, primarily because they were found to have been installed too shallow, and were old and corroded. In addition, there were breaks to larger unmarked water mains, all repaired by Alpine. Water mains not indicated in the plans had to be re-routed along the Venetian Causeway to accommodate the installation of new infrastructure. Betterment Issues: Betterment Issues include items that can be categorized as inadvertent omissions in the CDs, requested by the City or the Consultant, after the Project bid acceptance date that would have otherwise been included in the scope of work under contract. Fire Sprinkler Service Piaes Omission During the installation of the new 12-inch water main on Island Avenue South, the Contractor identified that all the existing fire lines serving the existing buildings on Island Avenue South, and Island Avenue North, were not scheduled to be replaced in the CDs. This meant that once the new 12-inch water main was placed into service, and the old 6-inch line abandoned, those buildings would not have fire service lines. As a result, ten (10) additional 4-inch and 6- inch lines, including valves and appurtenances, had to be installed from the new 12-inch water main to the buildings. The available record drawings at the time of the design of the Project, did not reflect these lines, therefore, they were not. included in the CDs. Although the CDs required milling and resurfacing of Century and Farrey Lanes, it was determined during the construction phase that due to the insufficient depth of the existing road base, these sub-surfaces needed to be reconstructed. The sub-surfaces were reconstructed and a new 2-inch lift of asphalt pavement installed. These conditions were not encountered until the excavation operations in the area commenced. Design Errors and Omissions include design defects and errors which generally result in an adjustment to the Contract time and/or cost because installations performed in accordance to the CDs are found to be incorrect and the contractor has to be directed to re-construct and/or re-install such work. Incorrect Sidewalk Elevation at Island Avenue South During the installation of the new sidewalks on Island Avenue South, Alpine advised the City, that the proposed finish elevations of the new sidewalk, would result in a difference in the City Commission Memorandum -Alpine Construction Contract Adjustment March 12, 2008 Page 5 of 7 elevation of the buildings' driveways, landscaping, and otherfeatures located at the property line. A new survey and layout had to be commissioned, and design adjustments were made by Alpine to correct this condition. The extent of the work included the removal and reinstallation of approximately one thousand three hundred (1,300) lineal feet of Miami Beach Red sidewalk. The Engineer of Record did not produce corrected drawings to Alpine in a timely manner, resulting in additional mobilization and demobilization charges associated with this added scope of work. The electrical service point of connection, for the landscape irrigation system was identified in the CDs by the Design Engineer of Record. However, the service point of connection for the new stormwater pump station was not identified. Coordination of the new service point of connection for both facilities was performed directly by Alpine and FPL. This resulted in the routing of the electrical service point of connection for the pump station through the Park, and an alternate route for the irrigation system. This necessitated the establishment of a new executed Utility Easement in favor of FPL to provide electrical service to the pump station. In addition, the landscape irrigation controller identified in the CDs to be re-used did not exist. A new irrigation controller and associated electrical wiring had to be installed, resulting in additional costs to the City. Conflicts with Existino Structures. Utilities, and Design Standards Several modifications to the underground utilities, and the design of above-ground improvements had to be made as a result of conflicts with existing conditions and proposed improvements. Existing light poles, a water pipe running through the Belle Isle Park, and sidewalk locations all had to be modified, resulting in Proposed Change Orders (PCO). Given that a survey had been commissioned prior to the completion of the design phase, these issues are considered design errors that the Citywill further address with the Consultant prior to the project closeout phase. Reaulatorv Aaencv Requested Changes: Regulatory Agency Requested Changes are those changes requested by state, local or federal regulatory agencies having jurisdiction over the project. The City requested that a 10-inch water main scheduled to be installed pursuant to the current CDs, be further upsized to a 12-inch water main. The upsizing of approximately one thousand two hundred and forty two (1,242) lineal feet of piping resulted in an increase to the Contract price. Further, the City requested the use of Type S-1 & S-3 asphalt pavement in lieu of SP-12; the use of epoxy coated ductile iron pipe (DIP) in lieu of PVC storm sewerforce main under the Venetian Causeway; relocation of the backflow valves from the structures to the end of the outtalk; and that the two (2) existing lines crossing the Belle Isle Park be capped and abandoned in place. The City further requested the installation of a new sidewalk along the inner perimeter of the Parkas requested by the County's Public Works Department and the island residents to address their concerns regarding roadway widths. The County directed changes on Island Avenue North and South, including modifications to the overall signage and pavement markings. In addition, they also directed that Century Lane be realigned; pavement markings be significantly changed, and the pedestrian ramps on the north and south sides of the Venetian Causeway be realigned. While evaluating all Change Orders, it was determined that the causes can be categorized as follows: • Forty-four percent (44%) due to Unforeseen/Unexpected Conditions • Twenty (20%) percent due to Betterment Issues City Commission Memorandum -Alpine Construction Contract Adjustment March 12, 2008 Page 8 of 7 • Twenty-two (22%) percent due to Design Errors and Omissions • Thirteen (13%) percent due to Permitting and Regulatory Agencies requests • One (1 %) percent due to Owner and Resident requests. Proaosed Chance Order Summary: Six (6) Change Orders comprised of sixty-five (65) individual scope-specific requests, in the amount of $2,841,017, have been submitted by Alpine during the course of construction of the project. As a result of extensive analysis and negotiation, the above requested amount was reduced by $764,145 to $2,076,872, of which $587,242 have been previously paid for in Change Order Nos. 1, 3, and 5. Additionally, $24,922 will also be paid for item Nos. 40, 44, and 45, that are part of Change Order No. 6. The above combined amounts of $612,164 were funded using project contingency from the original project appropriation. PROJECT BUDGET Alpine's Original JOC Proposal 6,349,495 Negotiated Contract Amount 5,603,638 Original Contingency 612,164 Total Original Project Budget: 6,215,802 CHANGE ORDERS Total Change Order Request: $2,841,017 Negotiated/Rejected Change Orders ($/Ei4,'14b) Negotiated Change Orders $2,076,872 Change Orders paid from contingency ($587,242) Funded (40,44, 45) (24,922) Change Order No. 4 (P-Card Credit) (25,080) Negotiated Change Orders: 1,439,828 Fundtng Request: 1,439,628 Of the six (6) Change Orders, No. 1, 3, and 5, have been negotiated and paid from project contingency, and a credit was given to the Cityfor Change Order No. 4. They are as follows: • Change Order No.1 totaling $98,611, included: additional General Conditions items that were inadvertently left out of the original JOC proposal; a City request to upsize the proposed 10-inch water main to 12-inch; and the installation of six (6) additional acorn light pole fixtures that were omitted from the CDs. • Change Order No. 3 totaling $52,150, was to reimburse Alpine for the Bond Continuation Certificate for the Project, which is required pursuant to the JOC Contract. • Change Order No. 5 totaling $436,480, included: commercial vehicle loading zone redesign on Island Avenue South, as requested by residents; full pavement restoration of Century and Farrey Lanes; new sidewalk along most of the Park perimeter, as requested by the Miami-Dade County Public Works Department; additional work to correct sidewalk, curb and gutter, and roadway elevations along Island Avenue North and Island Avenue South; and the installation of various building fire service line connections that had been omitted from the plans. • Change Order No. 4 corresponds to a deductive change order in the amount of $485,953 that was issued against Alpine's Contract for direct (P-Card) purchases of equipment made by the City on Alpine's behalf, in the amount of $460,873. This resulted in $25,079 of tax savings to the City. City Commission Memorandum -Alpine Constructlon Contract Adjustment March 12, 2008 Page 7 of 7 This funding request addresses only Change Orders Nos. 2 and 6, which have been negotiated and are detailed in Attachment "A". A total of $2,191,909 was requested by Alpine for Change Orders Nos. 2 and 6. This amount has been negotiated down to $1,489,630, of which $50,002 is funded from remaining project contingency and P-Card credit combined. The total funding request is $1,439,626, of this amount, $799,828, is recommended to be re- allocetedfrom previously approved Water and Sewer appropriations forthe Venetian Islands Neighborhood Right-of-Way Improvement Project Bid Package No.13C, (San Marino, Di Lido, and Rivo Alto Islands), to be replaced with future Water and Sewer Bonds. In addition, it is recommended that $640,000 be re-allocated from previously approved Stormwater Bond Fund appropriations for the Venetian Islands Neighborhood Right-of-Way Improvement Project Bid Package No.13C Construction, to be replaced with future Stormwater Bonds. Funding Repuest Summary for Chansle Orders No. 2. & 6 only: • Change Orderamount requested by Alpine $2,191,909 • Negotiated Change Order amount $1,489,630 • Funded $ 50.002 • Unfunded $1,439,828 Proposed Funding: • Available Water & Sewer Fund 424 (Re-allocation) $ 799,628 • Available Stormwater Fund 428 (Re-allocation) 640 000 • Total Re-allocation Requested: $ 1,439,828 It should also be noted that the latest Engineer's Estimate of Probable Construction Costs for the Venetian Islands Neighborhood Right-of-Way Improvement Project Bid Package No.13C significantly exceeds the current allocated budget. Therefore, utilization of these funds will not impact the commencement of the construction phase of the Venetian Islands Neighborhood Right-of-Way Improvement Project Bid Package No.13C Project. The Administrationlntends to request additional funding during this year's Budget Development Process to adequately fund this project. CONCLUSION: The Administration is requesting the re-allocation of $799,626, from the Water and Sewer Bond Fund 424 previously appropriated for the Venetian Islands Neighborhood Right-of-Way Improvement Project Bid Package No.13C, to be replaced with future Water and Sewer Bonds; and the re-allocation of $640,000, from the Stormwater Bond Fund 428 previously appropriated for Bid Package No. 13C, to be replaced with future Stormwater Bonds. Reallocation of this funding is necessary to complete the Project. Attachment JMG/TH/JECH/JC/CDV T:WGENDA\2008\Febmary 13\RegularWlpine Construction Contract Adjustment Memo Rev.doc