This letter is to inform you of the status of the currently abandoned historic wood frame
bungalow structure located at the front of the lot at 311 Meridian Avenue. Recently, several
members of the Commission received inquiries related to the subject property. The subject
building, constructed in 1924, was designated as a contributing structure in the locally
designated Ocean Beach Historic District when the district was created by the City Commission
on February 20, 1996, at which time it was still occupied. Anon-contributing, one story concrete
block structure is located directly behind the bungalow. Both structures are now vacant and in
highly deteriorated condition.
Between 1998 and 2003, three separate new development projects were approved for the
subject property. Each project was approved by the Board to demolish the non-contributing rear
structure, restore the wood frame bungalow structure and relocate it to the northwest corner of
the site, and to construct a new multi-story residential building on the balance of the property.
None of these projects were built, and the two existing structures still remain in their original
locations. In April of 2004, the property was sold to an out of state buyer.
As a consequence of the rapidly deteriorating conditions of these two buildings and the
legitimate growing concerns of surrounding residents, Planning staff have located and spoken
directly with the current owner, who resides in Washington, D.C. The owner has been advised
by Planning Department staff that because of the threat these structures now pose to public
safety, the Building Official has informed the City Manager's Office that unless the owner
demonstrates serious intent to remove both structures from the property immediately he will
have no recourse other than to issue an Emergency Demolition Order and have the structures
demolished by a City contractor.
However, the Building Official has offered to withhold issuing the Emergency Demolition Order
immediately if the owner agrees to apply for and is granted a Certificate of Appropriateness for
demolition of both structures at the June 10, 2008 Historic Preservation Board meeting. Upon
being granted a Certificate of Appropriateness, the owner will be required to pull demolition
permits and demolish both structures at his own expense immediately. The owner has now
agreed to these conditions and will request the Certificate of Appropriateness for demolition at
the June 10, 2008 meeting.
In November of 2007, the property owner commissioned a 40 Year Recertification Inspection
and Report for both structures. This report concluded that both buildings are in extremely
deteriorated condition, with roofs and floors partially collapsed, termite and other serious
damage extensive throughout, and both structures are beyond the ability to be repaired. The
report finally concluded that each "building must be demolished immediately".
We are committed to providing excellent public service to all who live, work and play in our vibrant, tropical, historic
community.
LTC - Status of Abandoned Bungalow Structure at 311 Meridian Avenue
May 27, 2008
Page 2 of 2
At the explicit urging of the Planning Department, the owner has commissioned a local architect
to prepare and submit the application to the Historic Preservation Board for a Certificate of
Appropriateness for demolition as well as for the landscaping and proper fencing of the site.
Planning staff have met with the architect and he is currently preparing the submission.
At this time, if all proceeds as stated, I anticipate the Historic Preservation Board will grant a
Certificate of Appropriateness for the demolition on June 10, 2008. I am confident the Board will
impose whatever conditions of approval it deems necessary and appropriate for restoring the
wellbeing of the historic site, the district, and the peace of mind of the surrounding community.
The Building Official has advised the Planning Department that he will allow a maximum of four
(4) weeks from June 10, 2008, for the property owner to pull the required demolition permits and
completely remove both buildings from the site.