Loading...
Amendment 4 to Hillier Group Architecture Agreement.~oo~- ~G~a~ ~ 7 ~' - ~~iL~a~ AMENDMENT NO. 4 TO THE AGREEMENT DATED APRIL 30, 2003 BETWEEN THE CITY OF MIAMI BEACH AND HILLIER GROUP ARCHITECTURE, NEW JERSEY, INC. FOR PROFESSIONAL CONSULTING SERVICES FOR THE CITYWIDE WAYFINDING SIGNAGE SYSTEM FOR FEES IN AN AMOUNT NOT TO EXCEED $66,960.00, FOR THE PROVISION OF ADDITIONAL PROFESSIONAL SERVICES FOR FINAL ARCHITECTURAL AND ENGINEERING SERVICES FOR THE PREPARATION OF THE CONSTRUCTION DRAWINGS AND SPECIFICATIONS FOR THE GATEWAY SIGN LOCATED ON THE MACARTHUR CAUSEWAY. This Amendment No. 4 to the Agreement made and entered this day of /'/~-1 ~- , 2008, by and between the CITY OF MIAMI BEACH, a Municipal Corporation existing under the laws of the State of Florida (hereinafter referred to as CITY), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and HILLIER GROUP ARCHITECTURE, NEW JERSEY, INC., a New Jersey corporation whose address is The Widener Building, Mezzanine, One South Penn Square, Philadelphia, PA, 19107-3502 (hereinafter referred to as CONSULTANT). RECITALS WHEREAS, pursuant to Request for Proposals (RFP) No. 48-01/02, the Mayor and City Commission adopted Resolution No. 2003-25182 on April 30, 2003, approving and authorizing the Mayor and City Clerk to execute an Agreement with Hillier Group Architecture New Jersey, Inc., (Consultant) for planning, design and construction administration services for a Citywide wayfinding signage system (Project); and WHEREAS, the Agreement was executed on April 30, 2003, for a lump sum fee of $185,770.00 for professional fees, and $22,230 for reimbursable expenses; and WHEREAS, on February 25, 2004, the Mayor and City Commission adopted Resolution No. 2004-25508, approving the schematic design conceptforthe Project; and WHEREAS, on August 17, 2004, the final design forthe Project was reviewed and approved at a joint meeting of the Design Review Board and the Historic Preservation Board; and WHEREAS, the Agreement did not include construction drawings and specifications for the MacArthur Causeway gateway sign; and Amendment No. 4 -Hillier Agreement -MacArthur Causeway Gateway Sign Page 1 of 4 WHEREAS, the Administration has herein negotiated Amendment No. 4 to the Agreement, in an amount not to exceed $66,960, for the preparation of construction drawings and specifications for the MacArthur Causeway gateway sign. NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No. 4. 2. MODIFICATIONS The Agreement is amended as defined in Schedule "A-4", attached hereto. 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged. 4. RATIFICATION. The CITY and CONSULTANT ratify the terms of the Agreement, as amended by this Amendment No. 4. IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 3 to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: ~i~ ir4Alu~ City Clerk CITY OF MIAMI BEACH B - ~,~ ,~ Matti Herrera Bower Mayor ATTEST: CONSULTANT: HILLIER GROUP ARCHITECTURE OF NEW JERSEY, INC. By Print Name T:\AGENDA120081April 16\Consent\WayfindingAmend 4 agreement.doc Amendment No. 4 -Hillier Agreement -MacArthur Causeway Gateway Sign Page 2 of 4 Ai~~'^f?~'~=~ ',S TO 'mow ~ ~Zp~nY City iur,~;~y- '~,~~`~~ Date C~t~N Svu4u~'d.~G_ Print Name SCHEDULE "A-4" Scope of Services: Following is description of the Additional Services to be provided by the Consultant under Amendment No. 4: 1. Additional Services The following is a request for additional services for final A/E services for preparation of the construction documents for the gateway. 1 sign located on the MacArthur Causeway. These documents will provide the City the necessary drawings, specifications and information required to obtain permits, and includes signed and sealed engineering drawings and specifications. (A) Gateway Sign Documentation and Engineering: this includes elevations, sections, material specification, construction details, installation methods and technical specifications. Provide signed and sealed drawings of Structural, Civil and Electrical Engineering necessary to obtain Florida Department of Transportation Permits. (B) Bid Negotiation: Issue bid addendums, answer bidder questions, provide Requests for Information (RFI's) coordination and evaluate bids for City. Attend additional pre- construction meetings via teleconference. (C)Construction Administration: review shop drawings, samples, field inspection, construction/coordination meetings (3 meetings maximum), quality control during construction, review & approval of payment request, punchlist, final acceptance etc.). Consultant shall administer the Change Order process. This will include review, recommendation for approval and preparation of Change Order documentation. (D)As Built Drawings: Provide signed and sealed as-built drawings of each of the Project components. Provide AutoCAD drawing file of the as-built drawings. (E) Project Coordination and Management: Management of Consultant team, including coordination of drawings, specifications and administration of structural, electrical and civil information. Amendment No. 4 -Hillier Agreement -MacArthur Causeway Gateway Sign Page 3 of 4 SCHEDULE "A-4" (continued) Compensation 1.Documentation /Engineering 1.1 Signage Documentation $ 9,500 1.2 Structural Engineering $ 3,000 1.3 Civil Engineering $ 5,000 1.4 Electrical Engineering $ 7,500 2. Bid Negotiation $ 3,960 3. Construction Administration 3.1 Signage $ 9,500 3.2 Structural Engineering $ 2,000 3.3 Civil Engineering $ 5,000 3.4 Electrical Engineering $ 3,500 4. As-Built Drawings 4.1 Signage $ 3,000 4.2 Structural Engineering $ 1,500 4.3 Civil Engineering $ 1,500 4.4 Electrical Engineering $ 2,500 5. Project Coordination and Management (Hillier) 9 500 PROJECT TOTAL $66,960 Amendment No. 4 -Hillier Agreement -MacArthur Causeway Gateway Sign Page 4 of 4