Loading...
Amendment No. 9 with RIC-MAN INT'L, INC..~do~-a679/ y/i6/~ -~7D AMENDMENT N0.9 TO THE DESIGN BUILD AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND RIC-MAN INTERNATIONAL, INC., DATED MARCH 17, 2004 IN AN AMOUNT NOT-TO-EXCEED $73,087.00 FOR SUPPLEMENT ONE TO JOINT PARTICIPATION AGREEMENT BETWEEN THE FLORIDA DEPARTMENT OF TRANSPORTATION AND THE CITY OF MIAMI BEACH FOR THE SIGNALIZATION IMPROVEMENTS ON~STATE ROAD A1A AT 7T", 8T", AND 9T" STREETS FOR THE RIGHT-OF-WAY INFRASTRUCTURE IMPROVEMENTS PROGRAM NEIGHBORHOOD NO. 10 -FLAMINGO / LUMMUS PROJECT This Amendment No. 9 to the Agreement, made and entered this ~ day of /LLC.. 2008, by and between the CITY OF MIAMI BEACH, a municipal corporation existing under the laws of the State of Florida, having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, (hereinafter referred to as CITY) and RIC-MAN, INTERNATIONAL, INC., having its offices at 2601 Northwest 48~' Street Pompano Beach, FI., 33027 (hereinafter referred to as DESIGN -BUILD FIRM). RECITALS WHEREAS, pursuant to Resolution No. 2004-25463, the Mayor and City Commission approved and authorized the Mayor and City Clerk to execute a Guaranteed Maximum Price Contract with DESIGN -BUILD FIRM, pursuant to Invitation to Bid No. 22-02/03 for Design Build Services to Design and Construct the Washington Avenue Improvements -Phases II, IV and V Streetscape and Utility Improvement Project (the Agreement); and WHEREAS, the Agreement provides for the design, permitting, construction and construction engineering services during construction forthe Washington Avenue Improvements Project, Phase II, IV and V, from 5~' Street to 16`n Street (the Project); and WHEREAS, the Agreement was executed fora Guaranteed Maximum Price of $12,104,429; and WHEREAS, pursuant to Resolution No.2006-26205, the City approved Amendment No. 1 to the Agreement, in the amount of $555,783.98, for the inclusion of right-of-way improvements to coordinate the Flamingo / Lummus drainage infrastructure improvements within the Washington Avenue right-of-way that were required to be constructed so that the drainage system would operate as designed; and WHEREAS, Amendment No. 1 increased the total Agreement fee by $555,783.98, for a total fee of $12,660,212.98; and WHEREAS, pursuant to Resolution No. 2005-26024, the City approved Amendment No. 2 to the Agreement, in the amount of $686,880.00, with Miami-Dade County for the inclusion of traffic signal improvements on 11 to 12tH 13~n, and 14th Streets on Washington Avenue; and WHEREAS, Amendment No. 2 increased the total Agreement fee by $686,880.00, for a total fee of $13,347,092.98; and WHEREAS, pursuant to Resolution No. 2006-26101, the City approved Amendment No. 3 to the Agreement, in the amount of $1,642,301.22, for the inclusion of planned right-of-way improvements along 7tH and Stn Streets, between Washington Avenue and Ocean Drive; and WHEREAS, Amendment No. 3 increased the total Agreement fee by $1,642,301.22, for a total fee of $14,989,394.20; and WHEREAS, pursuant to Resolution No.2006-26128, the City approved Amendment No. 4 to the Agreement, in the amount of $574,560, for the inclusion of Green Malayan Coconut Palms in the medians from the 600 to the 1600 block of Washington Avenue; and WHEREAS, Amendment No. 4 increased the total Agreement fee by $574,560.00, for a total fee of $15,563,954.20; and WHEREAS, pursuant to Resolution No. 2006-26199, the City approved Amendment No. 5 to the Agreement, in the amount of $1,094,815.46, for the inclusion of improvements to the drainage on 16`n Street and other miscellaneous improvements along the Washington Avenue corridor; and WHEREAS, Amendment No. 5 increased the total Agreement fee by $1,094,815.46, for a total fee of $16,658,769.66; and WHEREAS, pursuant to Resolution No.2006-26346, the City approved Amendment No. 6 to the Agreement for the additional drainage wells which are required for the proper operation of the drainage component of the 7th and 8th Street improvements; and WHEREAS, Amendment No. 6 increased the total Agreement fee by $197,760.00, for a total fee of $18,856,529.66; and WHEREAS, pursuant to Resolution No. 2006-26375, the City approved Amendment No. 7 to the Agreement for the inclusion of traffic signal improvements on 7tn,8tn and Stn on Collins Avenue; and WHEREAS, Amendment No. 7 increased the total Agreement fee by $726,757.00 for a total fee of $17,583,286.66; and WHEREAS, pursuant to Resolution No.2006-26414, the City approved Amendment No. 8 to the Agreement for the inclusion of planned improvements along and beneath the remainder of the Lummus neighborhood -identified by 6tH Stn 10tH, 11tH 12tH 13th, 14tH Streets, 14tH Lane, and Espanola Way, between Washington Avenue and Ocean Drive; and WHEREAS, Amendment No. 8 increased the total Agreementfee by $12,094,237.00 for a total cost of $29,677,523.66; and WHEREAS, the following Amendment No. 9 is necessary to amend the Joint Participation Agreement (#AOM259), between FDOT and the City, executed on November 15, 2006, for the additional construction costs incurred for the signalization improvements along State Road (SR) A1A / Collins Avenue Corridor, from 7'" thru 9t" Streets; and WHEREAS, Amendment No. 9 increases the total Agreement fee by $73,087.00 for a total cost of $ 29,750,610.66. NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No. 9. 2. MODIFICATIONS A. The Agreement is amended to include "Attachment 1 ", attached hereto and incorporated herein. 3. RATIFICATION The CITY and Design-Build Firm ratify the terms of the Agreement, as amended by this Amendment No. 9. (REMAINDER OF THIS PAGE LEFT INTENTIONALLY BLANK) IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 9 to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: CITY CLERK CITY OF MIAMI BEACH, FLORIDA MAY R ATTEST: ~..t.rnc G~;1 ~b Print Name RIC-MAN INTERNATIONAL, INC. President /Signature Print Name APPROVED AS TO FORM & LANGUAGE ~ FOR EXEC1d~ION ATTACHMENT 1 The additional below-listed pay items are eligible for reimbursement: Additional underground conduit to support primary line feeder - 706 ft @ 39.00 = $ 27,534.00 Additional pull boxes 11 @ 775.00 = $ 8,525.00 Additional wire - 270 ft @ 4.50 = $1215.00 Additional Count-down ped signals - 6 @ $ 2150 = $12,900.00 Signal head aux -1 @ $4913 = $4913.00 Illuminated street signs 12 @ 1500 = $18,000. Total = $73,087 PROJECT Limits: SR AlA/Collins Avenue, from 7th to 9th Streets FDOT Financial Project Numbers: 250236-1-58-O1