HomeMy WebLinkAboutColony Theater Renovation Agreement_ ~. d r~s CITY OF MIAMI BEACH ~~ CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139 www.miamibeachfl.gov Office of the City Manager Telephone 305 673-7010 Jorge M. Gonzalez Facsimile 305 673-7782 May 5, 2005 Lee Ann Korst Deputy Secretary State of Florida Department of Management Services 4050 Esplanade Way Tallahassee, Florida 32399-0950 RE: RENOVATIONS AND RESTORATIONS -THE COLONY THEATER STATE PROJECT NO: COMB-9042000 Dear Ms. Korst: Attached please find three (3) executed Agreements for the Colony Theater Renovations and Restorations project. tf you have any questions, please do not hesitat~~mcoi~tact at 305-673-7010. -~: -: ~ - ~ ,, ---' ; 7 - --< 7 Sincerely, ~~ -f , ~ t ~- = -o "' n ~s y' Tim Hemstreet ;_~ ~ Acting Assistant City Manager TH1rar F:Wnpr1SALL11iEMSTREET1COlONY1DMS Agreemerft.TRM.I(attt.doc attachment c: Robert Parcher, City Clerk Rhonda Montoya Hasan, First Assistant City Attorney Jorge Chartrand, Acting Capital Improvement Projects Director S Cc~Po~- - S- C o-~- s - co-I ~ 03 b - b~sZc~'/ C~ ~-~ -- OSbSZooS ~1e.- OS~SZooS y~~ .. ~~r ,.~_~'~:. 'Y ~jw ~ f~- V ~' ~ ,~ ~~~; ,~~. STATE PROJECT NO.: FACILITIES MANAGEMENT AND BUILDING CONSTRUCTION AGREEMENT BETWEEN OWNER, AGENT, ARCHITECT-ENGINEER AND CONSTRUCTION MANAGER L7 ...:~ 2_I.'s !11 STATE MV DESIGNATION PROJECT NAME AND LOCATION SERVICES COMB-9042000 A Renovations and Restorations, The Colony Theatre City of Miami Beach, Florida OV~NER:,_-_ City of Miami Beach. r~ ~; °~ ; Miami Beach Redevelopment Agency cam: °:`; ~ -; 1700 Convention Center Drive _ = . ~_ Miami Beach, Florida 33139 AGEN'~: State of Florida Department of Management Services ' '-"-' ~ 4050 Esplanade Way • - - '- :-- -.._ Tallahassee, Florida 32399-0950 . A~t~HI~ECT-ENGINEER: R.J. Heisenbottle Architects, P.A. 340 Minorca Avenue Coral Gables, Florida 33134 CONSTRUCTION MANAGER: McCartney Construction Company 4800 Southwest 64th Avenue, Suite I09 Davie, FL 33314 Jeb Bush, Governor Tom Lewis, Jr. Secretary AGREEMENT BETWEEN OWNER, AGENT, ARCHITECT-ENGINEER AND CONSTRUCTION MANAGER THIS AGREEMENT, effective as of the date last signed below, is by and between the City of Miami Beach (hereinafter the OWNER), the State of Florida Department of Management Services (hereinafter the AGENT), R.3. Heisenbottle Architects, P.A. (hereinafter the ARCHITECT-ENGINEER), and McCartney Construction Company (hereinafter the CONSTRUCTION MANAGER) collectively referred to as the PARTIES. WITNESSETH: WHEREAS on October 20, 1999 there was made an AGREEMENT BETWEEN CLIENT AND AGENT for Project No. COMB-99042000 (hereinafter CONTRACT-A); and WHEREAS on March 6, 2000 there was made an AGREEMENT BETWEEN OWNER, AGENT AND ARCHITECT-ENGINEER for Project No. COMB-99042000 (hereinafter CONTRACT-B); and WHEREAS on October 22, 2001 there was made an AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER for Project No. COMB-99042000 (hereinafter CONTRACT-C); and WHEREAS time is of the essence and the PARTIES wish to complete Project No. COMB-99042000 according to the terms and conditions contained herein; and WHEREAS it is the intention of the PARTIES to amend CONTRACT-A, CONTRACT-B and CONTRACT-C so as to make the terms and conditions herein a part of those agreements. NOW THEREFORE, the Parties hereby execute this Agreement and agree that the same becomes binding and enforceable by and through the Parties, their assigns, and agree as follows: 1. Final Budget. The Final Budget for the Project shall be as shown in the attached Exhibit-A, which Exhibit-A by reference and attachment hereto forms a part of this Agreement. The Final Budget shall not be subject to modification by Change Order. Phase fees shall be treated as a lump sum and in the event the project is completed ahead of schedule, CONSTRUCTION MANAGER shall be entitled to the entire phase fee. 2. Final Scope of Project. The CONSTRUCTION MANAGER warrants to the OWNER that CONTRACT-A, CONTRACT-B, CONTRACT-C and this Agreement contain the complete scope of the Project and that any and all conditions, either currently known and/or that should have been known at the time of the execution of this Agreement are accurately reflected or contained in the aforementioned Contracts and this Agreement. The warranty contained herein may be relied upon by the OWNER and its successors and assigns. It is the professional opinion of ARCHITECT-ENGINEER that CONTRACT-A, CONTRACT-B, CONTRACT-C and this Agreement represents the fu-al scope of the project and that any and all conditions, either currently known and/or that should have been known at the time of the execution of this Agreement are accurately reflected herein. ARCHITECT-ENGINEER covenants with OWNER that he has furnished his best skill and judgment in assessing the accuracy and completeness of this Agreement. 3. Substantial Completion Date. The date of substantial completion shall be August 10, 2005. The PARTIES understand and agree that time is of the essence. The date of substantial completion shall not be subject to modification by Change Order. -1- 4. Final Completion Date. The final delivery date shall be September 9, 2005. The PARTIES understand and agree that time is of the essence. The final delivery date shall not be subject to modification by Change Order. 5. Final Schedule. The PARTIES agee to adhere to the final project schedule as shown in the attached Exhibit-B, which Exhibit-B by reference and attachment hereto forms a part of this Agreement. 6. Paperwork Timeline. The PARTIES agree to adhere to the paperwork timeline as shown in the attached Exhibit-C, which Exhibit-C by reference and attachment hereto forms a part of this Ageement. Outstanding Change Orders. The Parties agee that the following Change Orders will be approved by OWNER upon submission to OWNER in final format: • Change Order #6 (See Exhibit-D) • Change Order #7 (See Exhibit-E) • Change Order #8 (See Exhibit-F) • Change Order #9 (See Exhibit-G) • Change Order #10 (See Exhibit-H) • Change Order #11 (See Exhibit-I) 8. Liquidated Damages. Inasmuch as failure to complete the project by August 10, 2005 will result in substantial injury to the OWNER, and as damages arising from such failure cannot be calculated with any degree of certainty, it is hereby agreed that if the project is not substantially completed as in accordance with the provisions of the Contract Documents the CONSTRUCTION MANAGER shall pay to the OWNER One Thousand Dollars ($1,000) for each and every calendar day elapsing between the date fixed for substantial completion above and the date such substantial completion shall have been fully accomplished, as liquidated damages for such delay. Said liquidated damages shall be payable by~the CONSTRUCTION MANAGER to the OWNER. Where CONSTRUCTION MANAGER has the authority in a subcontract to pass Liquidated Damages assessed under the terms of this Agreement to the subcontractor responsible for the delay, the PARTIES agree that CONSTRUCTION MANAGER may require the subcontractors} responsible for the delay to pay any Liquidated Damages for which the CONSTRUCTION MANAGER is primarily liable by the terms of this section. However, notwithstanding the foregoing, the CONSTRUCTION MANAGER is solely liable for Liquidated Damages, to the OWNER. 9. Resolution of Disputes. To prevent all disputes and litigation, it is agreed by the parties hereto that the ARCHITECT-ENGINEER shall decide all questions, claims, difficulties and disputes of whatever nature which may arise relative to the technical interpretation of the Contract Documents and fulfillment of the parties' obligations as set forth in CONTRACT-A, CONTRACT-B and CONTRACT-C, as amended by this Agreement as to the character, quality, amount and value of any work done and materials furnished, or proposed to be done or furnished under, or by reason of, the Contract Documents and the Project, and ARCHITECT-ENGINEER's estimates and decisions upon all claims, questions, difficulties and disputes shall be final and binding to the extent provided herein. Any claim, question, difficulty or dispute which cannot be resolved by mutual agreement of the parties shall be submitted to the ARCHITECT-ENGINEER in writing within fourteen (14) calendar days. ARCHITECT-ENGINEER shall notify the disputing parties in writing of ARCHITECT- ENGINEER's decision within fourteen (14) calendar days from the date of the submission of the claim, question, or difficulty or dispute, unless ARCHITECT-ENGINEER requires additional time to gather information or allow the parties to provide additional information. All nontechnical administrative disputes shall be determined by the OWNER pursuant to the time periods provided herein. -2- During the pendency of any dispute and after a determination thereof, the parties shall act in good faith to mitigate any potential damages including utilization of construction schedule changes and alternate means of construction. In the event the determination of a dispute under this Section is unacceptable to any party hereto, the party objecting to the determination must promptly notify the applicable party in writing within seven (7) calendaz days of receipt of the written determination. The written notice must state the basis of the objection. The parties shall participate in mediation to address all objections to any determinations hereunder and to attempt to prevent litigation. The mediator shall be mutually agreed upon by the parties. 10. Continuing the Work. CONSTRUCTION MANAGER shall carry on the work and adhere to the progress schedule during all disputes or disagreements with any other party. The work shall not be delayed or postponed pending resolution of any disputes or disagreements. 11. Governing Law and Exclusive Venue. This Agreement shall be governed by, and construed in accordance with, the laws of the State of Florida, both substantive and remedial, without regard to principles of conflict of laws. The exclusive venue for any litigation arising out of this Agreement shall beMiami-Dade County, Florida, if in state court, and the U.S. District Court, Southern District of Florida, if in federal court. BY ENTERING INTO THIS AGREEMENT, ALL PARTIES EXPRESSLY WANE ANY RIGHTS ANY PARTY MAY HAVE TO A TRIAL BY JURY OF ANY CIVIL LITIGATION RELATED TO, OR ARISING OUT OF, THIS AGREEMENT. l2. Extent of Agreement. This Agreement is intended to be the final agreement between the PARTIES for the completion of the Froject, subject to a material change in circumstances beyond the control of the PARTIES. The provisions of this Agreement may be altered only by written instrument signed by all PARTIES. Provisions of CONTRACT-A, CONTRACT-B and CONTRACT-C shall not be effective for modifying the provisions of this Agreement. 13. Conflict. l:n the event any of the terms provided in this Agreement conflict with the terms of CONTRACT-A, CONTRACT-B and/or CONTRACT-C, the terms of this Agreement shall control. All other terms of CONTRACT-A, CONTRACT-B and CONTRACT-C shall remain in full force and effect. The terms and conditions herein, together with CONTRACT-A, CONTRACT-B and CONTRACT-C, constitute the entire agreement and understanding of the parties and shall supersede all communications, negotiations, arrangements and agreements, either oral or written, with respect to the subject matter hereof. 14. Warranty of Authority. Each person signing this Amendment warrants that he or she is duly authorized to do so and to bind the respective party. IN WITNESS WHEREOF, the parties hereto have executed this Agreement the day and year first written above. AGENT (DEPARTMENT OF MANAGEMENT SERVICES) As Witnessed: APPROV J ~} // By_ ~- ~-~, ~, t..,..~ .. BY Date: ~,[~~~- .. /~ ~ Lee Ann Korst, Deputy Secretary Print Name: ~~-~~~ l.. ~.~'v :. c -.. Department of Management Services Approved as to form and legality: Spencer Kraemer, Assistant Genera Counsel -3- OWNER (CITY OF MIAMI BEACH) As Witnessed: By `~ Print Name: " 1 t, ~ Qu,~ S'M'pL't' Approved as to form: APPROVED: ,_ By ~•._ -_ Jof M. GQ zalez, CityMan~~r C' of Miami Beach ..~,. Rhonda Mon Hasan, First Assistant City Attorney City of Mi i Beach .q:..:.i4,_., F ,T APPROVED AS TO ~;oiM e , ~ ~ ~~VA~~ ~ ~~ ~ ° . ~~ CONSTRUCTION MANAGER (MCCARTNEY CONSTRUCTION COMPANY) As Witnessed: APPROVED: -~ By By. She Print Name: Mc :Cartney, Corporate President Construction Company Date: f/ `'1' ~ ARCHITECT-ENGINEER (R.J. HEISENBOTTLE ARCHITECTS, P.A.) As Witnessed: APPROVED: y y~ ~ e~ Date: 5 2 0 ~ichard J. Heisenbottie, Co rate President Print Name: c R.J. Heisenbottle Architects, P.A. -4- Final Project Funding for Colony Theatre Reconciliation (2/11/05) Contract amount through C O # 5 Amount paid through 12/31/04 Balance of contract Total of direct pay subcontractor purchase orders Amount paid through 12/31/04 . Balance of direct pay subs Balance to complete incl CM contract and direct pay subs -12/31/04 Outstanding Change Orders CO#6 CO#7 CO#8 CO#9 C O #9 CREDIT C O #10 C O #11 Balance to complete Total to complete construction Addl const funding (less existing balance) ~~ .: ~ EXHIBIT A $5,582,328.09 -$4,655,955.00 $672,000.90 -$172,410.68 CO subtotal CO total $926,373.09 $499, 590.22 $1,425,963.31 $145,383.21 $184,665.43 $8, 798.21 $66, 910.31 -$27,984.43 $166, 593.50 $125,000.00 $669, 366.23 -~66`~ .23 $2,095,329.54 $2, 095, 329.54 $669,366.23 If major modifications are necessary at Auditorium Ceiling it could add up to $400,000 to the above Budget and an additional 3 months to the project schedule Addl A!E funding ($142,000 + $4991) reduced to $119,420 (w/bal of $2284 in proj) $117,136.00 Total Credit ($29,242.82+$29,855=$59,097.82) DMS Fee Amt: $19,662.56 (Waived) ~ $0.00 DMS Refund -30,000.00 Total funding to complete project $786,502.23 n o -o O r' N ((JJ G ~~ O O V ~ q j 41 N ~ O m m V yytt W N ~ Y N i yy~~ 0 0 m V 1N~ A N J. V pp N + pp 0 0 0 V Ol M ~ 41 N r D 0 0 V O p ~ 41 N r a ,~,'~ = ~ ~ ~ T '~ ~ 3 f~` ~: fir ~ rt~ cy ~ ° Tl 3 ~ 1 lfn V) cci -i ?I 9 9 ~ ~ ~9 g~ , ( • ~ ~~ ~ 2 ~D QT ~3 W ~ 'D ~ ~ ~g a • 3rs a ~ a T + a IT a OT a T a S a to Se+ d ~ O ~ s r~ 7o ~ m a O S E ~ b m s ~~ ~. ~ ~ ° a S 1 y ~ ~ ~ m ~ ~ ~~ 8 ~ ~ 0 $ 8 8~ m 8 '_ {n f .m ~ v ~ ~ ~ g ~ ~ m ~ ~ 3~ ~ c ~ ~ ~ ~ ~ ~ $ ' ~ ~ u m '~ v ~ ° ~~ o ~ P ~ 3 'i ~ 3 p 3 Q 3 a 0 = o : m c ~ ~ °7° > x > ~ ~ y c 3 ~ v ~n d ~ 8 ~ ° ~n mso~~ m ~C o~~+ m n3 ~ Q ~ X ~ ° ~52~ ~ ~ 5' ~~ ~ , ~ ~ C g p~ _ m y ~ ~ $ e g EXH T ~ ~ Sr ~ ~m w ~ = ~ a n O A p c ~ ' y ~ °- o ( 0 0 I i d a 11 S T_ ~ O it V i V ~ ~ ~ ~ ~ m m d ~ C n ~ R~ 41 p rF I ~ C O ~ TI ~. m a ~ ~ ~ z ~ ~ ~ 8 ~ 8 ~ 8 -1 a ~ ~ ~ ~ 8 ~ 8 T. 8 ~ ~ z ~ 8 ~ 8 ~ ~ ~ ~ S. E. ~ 8 1 m ~ ~ 8 -1 m ~ z ~ S 1 m~ ~ ~ ~ 8 rl ~ ~ ~ 8~ ~ ~ ~ ~ 8 -i -I ~ ri -i ~ ~ ~ ~~ ~ 8 ~ 8 ~ 8 M ~ ~ ~ a ~ ~ ~ N ~ a N ~ ~ ~ ~~ s ~ a ~a a ~ ~~ ~ ~ ~ ~ ~ g ~~ ~ ~ ~ ~ ~ ~ \ r~ N _ b _.. ~..._. ._... . .._.. _... _ ...... .__. _ ._ _~ .. ... .~.~... ._. ~~. . .._.~. . ...~... _..._..... _ .~ __. _ ~. ..~. ~_ .~_ . ~_ ... .. ~ _ _ .. ~ .._ _._ .~. ._ _~ ~~. , . ~_ ._~. ~...... _.. O r V r ~{ ° Y i' d v F . _ ~ __. _._ ._ _._ _ _.. _ _..... ._ . . ~ ._ _ .._ ___.. _ __ __.... _ _ _ _ _ __- _ _. _ _... ~ .__ ..._ ~ __... _ _., a 0 P i r - -- - - - - - - - - ° - Pr I ~ 5 - S ~; - s ~ ~ ~ ~ ~ r w I I ~ I ~ r N s~ V A '!6 e ... ._ . __.. _... . _..._ .~.. ......_ _.._ . ~~ _._ ._.._ ~. _~ _ ~.~ ~__ ~_ _.~ ~ ___....._ .....~ .~ ..... _. .__ .......0 ~ S N • .. ~.. . ~ .~. .......~_ .~.... __. ..._ ..... ....... ...... ...._ ~ ._. _~._ _ ~....__.. _.. ...._,....... ~__ ...~. ..._ _.. _.. _, ..... .__. _. ~ .~ _ - _._. __ .. _ .. . ... ._. ~ I + Q r' f I _ O ..._ _.._...__ ..~ _.._. __ . ... _._ ..~. ._._ .. ... ._ ..~ . ..~. I V ..._~ ....._. ....~ . _._ ...... ... ~_ . ... ~ _. _:....._.. __.. .~_. ~ .....~ . _... .. _.. .~ .._ .__.~_ .. _ ~. i - - _ v .~ . _._. ~.... _. _. ._ .~. __ O p p s~ ~ N ~ g O m V W N • (Oil N ~ O O S V p N ~ 41 N O O O a V ~ M i fVY N + O O ~ V O N~ Y~ + p b m V T N ~ Y N O a g ~3~ m m ~ < > = ~ a m m a o l w 2 m ~ ~i 1 ~° ~ ~ ~ a n m m g ~ n m a 0 ~ ~ QI ~ ~ ~ ~' n x ~ m m S ~ l$ ~ a ~ gm ~ ~ < m ~ a r ' o ~ - ~ ` I j sT v~ ~ ~ , m ©I m~ x nn ~ y ~ ~ ~ ~ e ~ t m ,~ ~ °' = ~ ~a3 A ~ ,B .C7 g D a f~ g ~ ~ ~ ~ 3 . c ~ n y n~ mN, 3 m ~ m ¢ ~ ~' c a ' n `°~ g c ) m ~ ~ ~ 3 m ~ $ m ~t~ ~i i' m m ~ g ~ .~ f~ .m $ m ~ m c , go v ~ . ~ ~ i~ ~ ~~ g .~ $~ ~ ~ O x g i~ 3 g Q n' . c ~ g ~ , ~ ~ 9 g m R ~ 3 ~ i~ m ~~ ;•S 3L z~ 3 a C o W 'o ~ ~~ 9 ~ o e a o $ ~ m ~ O I ~ g g i 19 l~ ~ ~ ~. • w ~ oy ~c ~ '~ ~? ~ ~ P ~ $ ~ n p w ~ e ~ ~ ... y tps ~s ~ Iy ~ ~ ~ _ a m ~ ~ ~ ~ O n s a m a ~~ ~ y ~ a~ i, o ~ m m ~ ~ a ~ O I ~ o ~ , A w I ~ O I i V C m ~ ~ '71 ~ T a T ~.c c ~ S c c e c .1 c c .1 c c c ..1 c c O O O S m m O O v ~ G m O 7 7 C o c ~ D 77 ~ D 77 c C • C o C o C m O 7 C m C e ~ a .. ~ ~ a oo a ~ ~ ~ ~ ~~ ~ ~ ~a ~ s ~ ~a ~ ~ ~ ~ _P . .¢ V r^ }a~" .. . ~...... .. d .. ~~ __ _ \ _ _ _ __ ~ ~ Q ~ O ~~ • . ~ s ~l E I' 1 G \ \ yb p 999 a \ ~ m _ .._... .__ ..._. _. ..... __. ._. _ ,_ .. __.... _ ... ._ _ ... _ ...._. .. . _ .~ _ _.__ _. ~ ._ \ __ .. _. ._... .__..... ......_. __.. _ ._. O ~~.. w ll T a V d N .. .__ .~_ _.. .~._. .~~. ~._ ...._..~ .. ~... _ ..~. ..~ ~. .. _ ~.~ ~ . ... ~ . ._. .. ._... __ ... .~. ~ ... ~.~ _.~ _.__ _•__. _.......... _. _..~ __..... ~ ...__. V C N L ._ . ._ .~-.. .__. ...._ _. _.~ _._.. ....~ _~.. '.. ...~. ~ . _ .__ _. .. ~~ _.. .. _. __ T _~..~ . .. r 8 ~ ~ ~. . ... .. . .. ....... .._ ._ _ ........ .__.. .~....._ .. ........ _.~ __ . _.~... O • O N N _ 1 o _.._ _.... _~_ _ -- -- -.. _ ._ _. __. . ~.. . _ N r i _.. . __ . ...~._ ~.. .~. .. . __ . ~ _._ ... _r I..... ~.. .~ .. ~.. .... ..~. . _+. _. _~. _ ~... ._.. _. ._ __. _. _ ~ _ _ _ - -_ ~ .... - .. - ... ... - ... _ _ _... _ . ...... _. ~ . e V N r N d _... ...._._. ..... ....._ _ _... _ .._ ...... __.... _ ._... E ~o~ ~. m t a fWil N p ~1 O O m V OI 111 J 41 N A O m O V 01 g _ Y b N _ N ((yy O O N N pp 0 P N 11_~~ W N + O _ b H W N _ A V N _ ~ O m m J pG W 1 _ 011 P °u _ O c ~ S'3~ ~ ~ ° '3. IG Ya m ~. n j. o 0 ? y C y ?I m ~ + ~I a f H o ~ m ~ o ~Ln ~ ~. IN_ Mo I~ lO 3! @_ ?I ~ n m ._om.. ~ ~ tn ~Ig A a o Z ~ ~ s ~ t ~ ~ a f,3! o o ~ ~ !A 2 a n rt~ ~ ~. C ~ ~ G ~ o V .-~o.' ~ ~ - ~ ~ o ~ 3 al mi y m ec tn m ~ „ m' ~ ~ T y 3 ~ G) !~ ~ v5 ~' x , v m i ` iv ' ~ w o m ~ O 9 o ~ ~ ~ It m n 7o o ~ m y a i 3 • __~ ~ ° ~ o ' ~ A ~ ~ m ~. ~ m. ~ ~ ~ o ~~ o ix ~ m p l~ IG - ~ ~ Cl ~ ~ z > c~ >. ~ n 'a . Is m ~ ~ "I m ~ T ~ 3 ' g m m l~ a l dm v ~ ~. ~ m = R l~ io P"~ ~ T ~ ' 1~ ^ .2 9 ~ ~n 5 '° ~~ I vi o = m '" ~~ m m 2 m K 3 ~ ~ I ~ 1° £1 ~ c ° m i 2 l m ~~ p ~' ' m z` o a '~ 3 c ~ ( o 3 S 1D n o ~ -i ~~• 3 = § a10 ' m Q o '~o' ~ o 'Z '*~ ~ ~ ~, = ' ~ i 3 "Z n ° ' ~ ~ m O ~ ~ ~ ' ~ riJ cl 2 ~ m S ~ s m n ~ ~ ~ ~ , y , _ x ~ Im ?! ~I g + o g g ~ ~ <_ I H ~ ~ ~ ,8 ~ m ~ o ~ ~ I o A a ^ 3 ~ _ ~ ~ b ~ o 9 T ~ ml ~ ~ _ ~ + A ~ ~ O m _ g S o v ~ m ~C ~ N A T g _ ~ * V , ~ m I : V < .c w.~ f") 0 m a A Q N I i~ = ~ C A 0 (~ ~ 0 ~ A s m ~ o $ a ~ W ~ n I m rr R ~ C m -1 C m -1 C o -1 G o ~ ~ 1 C o 3~ ~ ~ ~ ~ • a ~ ~ T+ ~ +T~ C ~ o -i C ` o T ~. T ~. -..{1 ? c ~ • a ~ ~ T a T ~. T ~. T ~. T ~. T ~. T z T s T ~, ~ c `r m a .~ ~ T ~. ~ ~ ~ ~ ~ ~ ~ c ~ ~ ~ c ~- C ~ o 1 `L m a ~ ? c { T ~. 3. T ~ ~. T ~. ~ ~ ~ ~ T s ~ ~ ~ ~ ~ ~ a ~ O a o O a ~ ~~ l~ V V ~ V V ~ $ ~ $ O ~ O ~ ~ ~ O ~ ~ ~ O O ~ ~ N ~ s~ a ~ ~ a a O ~o o ~ e 0 ~ ~ ~ UI ~ tl1 ~ N ~ N ~ ~ ~ ~ ~ ~~ ~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~ 5 ~~ ~ ~ ~ ~~ Q ~ B ~ -- ...._... .. _ ._. __ ~ ._. .__. _ .... ..... .._. _.. ~ _. t_ _. _ __. _ .. _. _. _. __ _ - .... ._._ __.__.. _.. .._ .._. .__ _.~ _. .... _-- f ~ N p_ I \ \ ...._. ._..._ . _ _ .~.. ~._ .~..... _.... _ .. ...... .....__ _ .__ ._... .. _.... __ .~ _ ..~ _ .. .~ .. . ...__ ._ _... _._. . ~... . _... _.~ _ .._......._ .. ~.....~. ~ ._ __._ • .. .~_. . ._.... .._.. ._.. . ....._ _..... W O .. ... I ....... ._. ....._ _..... ...... ...._.._ 1 ,_.. Y r V O ~. .~. _ .....__. .. .._ \ ~ _ _. __ _... _. ._.._.._ ._... .._. . _ _._ ._ ._ .... _ _ .._ _ ._ _ _ .._..._ ... _. _ . __ ~.. _._ ...... ..__ .. _.. ..__.. ..__ ...._ .__. .__ ... .... N $ P _ \ ~~ 6 41 _ .. .... ......... _ _ . _. _. \ ._ .._.. ...... I ~ 0 0 m R' . _ ~ _ _ ~ ~ _.. _... _..... ....-- - -- ...... __.. ... .... I ......... ... s ~ r9 ~ A 3 .t- I f r I i i o O ~ Y N 1 __ i 6 e O N N . ._ ._. . _. __ ._ . ~. ._. .. .. _. . _. _. .. ._ ~ _. _. .... . _ __. , _ _.... _._ _.._. .. .. _ N O N 1 . ~ . ._... ._,_. _.._ ..._ .. .. ....... . . .._ ._... .._ _.. ... Q G ^ f ~ _ _ .. ( 1 6 ~ • ~ . . _ .. ._._. _._ ..- --. __ .. .._ _._ - _. .,. .._. _. __. ..... ...._ ._.. _ .... ...... .... ...._ O g $ 1 0 ~~ N _._..__....._ ._.. .... .._ ...._. .__. _._. ~... ...._ . ~_. _ _.~ ._ _._ . ~ . _ ..t _ _. ._.._... _.... __• __ _ .. ........_ _ ._.. ...... .._ ._ _ . v N A 41 V p P .. _ ..... ._. .~.. _... . __ ._~, I 0 ~. Bp 4 S P ~ Y N . ~. p O O V W 1.11 A S N + S O V ~ q 1V11 ~ IJ N + O O O V O N p ~ Y l V + p p O N J O 1 N I~ ~ 6 4 ~ ~ I I I I ~~~ '~ : ~ ~ o ~ ~ ~ 3 ~ o ~ ~ m c~ ~ = m 5. ~ ~ j ~ -i ~ Ln ~ C=i x a ~ a m ~n c,~ l x l~ ; ~ v 5 m v 3 m g ~ m ~. o ~ ~ ; o v_ ~5 ~° , ~ ~ 'n ~ ~ y y x xa n I ~ 3 lS T 3 ' T '~ $ ~ '~ m n ~ tv n G m m ~ m ~ _ ~ ~ ~ ~ ~ S ~ o D ' ~ ~ g g 3 m a C a ~ G ~ ~ _ ° v N ° ~ ~. o ~ m m m w r ~ P y = ° A Mm ~ m 1 1 V J m B c 1~ lp $ ~ ~ ~ ~ ~ 3 ~ ~ ~ ~ ~ {{ I gQ ~r O ~ ~ '~ m~ m ` ~ ~ ~ ~ ~ n o 6i ~ g ~ 3 a Q o ~ ~ '° p, o ~ ~ lo m o m 1 m o o m ~ ~ ~ y m ~ I ~ (~ Q I ~ ~ i W O 7 ~ ~ ° . C ~ ~ O • m ~ ~ 7 ~ ~ ~ ~ 3 O ~ 7 7 ~ 7 ~ m ~ ~ ~ 7 ~ 7 7 7 ~ 7 7 ~ ~ 7 ~ ~ ~ ~ p [ppa J1 ~ ~ p ~ ~ d p ~J [ ~~p ( ~11 ~a 1 ~ ~~ 7 ~ ~ ~7 ~ g~ ~1 Q ~ _~ il { ~ ` ~ ~ ~ ~ ~ ~o Q p~ (QQ 1 ~ ~ ~ N ~ $ 4 1 $ {71 N a N ~ ~ a tJ1 a N ~ 3 N ~ j tJl ~ ( ~ N p fA $ ~A a 3 A A ~ a 47 ~ S p tJ ~ ~ ~ ~ a W a 4f ~ r = I i a m o~ v vQ w N .~ .~ ~ ~. .~. _ _ . .. _ ~ . _. _. __ _ ._. _ ......._ ._._. ._. __ ._. ._... ..._. _._. ..._. ~~ ___ ~ _.._. t t a ~ I o a Ni ~ 9 \ I ~~ y ~ 1~O i ~ s = ~ - ~_ s g ~ O w T . r I I I p 0 ~ p P w ° _._ . __~. ... ....~ .~.. ._ ._._.._ _.._. _.~ .. _~ __ _ .~« ..._ .. _. . .. .__...._ _ ..... _...._ .. _... . .__ ..._ . _..... .....-. ___ _... ..__ . ...... _. _ _ _.~ _..... .....~ ~_.. .~._. .... JJ O d ~1 . . . _ _._ . , J • ~ _.. . .. .~ __ . __. ~_ ..__._ .._. ._. .... ~_ _..... _.. ._ .. ....... ...... .~.~ ._... ~..... i ~ i p 8 _ ._ ~.~ . ._. »... . . ~. ... -4- _ ...~ _ .~ _ _ w v v d _. ._. . __ ._._ ..._... ..... __ ...... _.. ._ _ _ _ _ .. ...._ _ ... . Y. _. . _ _. __ + a ~ 1 EXHl811 c G a° ,r'~.~ G N O l~n ~A~ d~ ~ l~0~j ~ o 0 o~' lvdd ~'-'~ ~ °~z°O~ ~~ ~~? J ~~ o°~ ~ ~ o .~ .~ 9 ~ rT~ ~ y x q ~~~ ~C~ ~~ ~d~ ~ n z tea, ~o o c~ ~y, ~o~ ~ . ~ ~~~ d ~~ H ADO ~~ ~~~ ~ ~~ S~ ooE~ ~ ~ ~ o 0 Q ~ d ~ `~ y d ~y~~ _z r~i~ C ~ ~ `'' cCn ~ yY~n v' C 8'° O ~ ~ ~ ~ ~n~ ~ 47 ~~ ~~ ~p y~ Oy~'yw n ~ ~ ~ ~ ~ ~ o~~~ .~ a nay o 0 -`i f%1 ~ o ~~~+ ~~ 0 "'C y n 0 r 0 H a b r~ 0 r Deparurlent of Management Services Division of Facilities Management and I3uilding Construction CONST'RI1CTtON COTt1•RACT CItANGE ORDER Change Order Nurnber• ~+ S1xtc Yrojcq iJumbcr.SnNtR _ 9on4~nn ate PiOJCLi Name' 33rnnv+etinnc sm~l Ttrdnratinnc„~'~la~~ Thrsnrn C ArchitCCU1.nF,fntCr:~Nt;cnnhntrtr arrhitrr)c P A Address' 3,dit tutinnrcb AV~uC, Cnitr i(1 city: r.vral [;At,1rc StatelZip• . ,,;~,,,3~ L34 Phone; ;a5.ddfi-7794 CpIItraClUr: Mrr'wAnra~ .nnc~rurtinn t nm~ r,r~~ Addross•~1CLKLSu/h4taAvcnnr• S.~tt~1f19 City' ]lt,v;r Staic/7ip: F1nriAa ~~~14 PhonC: ~4-hR4.7R71t EXH1811 D DESCRIP'i70N OF CHANGE At]ach additional es if aired l~azease In Increase In ] , Description of hams -See attached COR #f 8 $ I6,SOG.G3 $]45,3832] Notice To Proceed Date: I 1 /18 Ori . Contrail: Stan: SS 568 00 .00 Contract Time: Da Datc'~ Contract Stan: $5 58 328.00 SS_58 28.10 Original Contract Time 427 i/13/04 Subtotal Contract Time 620 8/06/04 Net AddlDeduct $ 145 38321 TYiis Chan Add Deduct 79 Pres. Contract Sum SS 8 328.10 Vew Contract T" a 694 1025/04 New Contract Starr S 7 7 7I l .3I 'Ibis Change Order is an amendment ~ the Contract Agrermeat between Contractor and the Owner, and all contract provisions shall apply unless speci5cally exempted. Tltc amount and time change dcsig~tatad arc the maximum ageed to by both lire Owner and the Contractor for this change. 3~n cnnc;An.9tinn of thr for ~;~g w~'ncm,rntc in rnntr>,rt timr and rY,nft~rt ~+rn fi+r rnnfrartr+r h~~~ ,~racee (]umrr from AIt r]Airne _~, aa+nrie nT rsmcre of action nrieing not of thr trnm,:wrlinII~ et, oft; ^nd nrn+„rnrre pivino ric' to thie t"1,»ngr• flydrr Thic tanittren t~Rn~j fhdeT is the entirr. agrrrm,KtY hr~t,w,.~.n C'iaunrr anrt rtttratynr witfi n-cnerl ]n title f'_k?ngC„~ET No other 8~!ICCImCJfTS Or modifications shall apply to this contract amendment nalGSS pprsssly prt)Vlded herelII. This f:ltatt~ nt'drrt'Gl1rr~GatS finda~ t,~~.r~T'*'~"+a to Ginn 170 S7~ Ftnridm Ctatnh!c f 19?Rt RR('Lli~?M7~ N1~F71- APPR C)VFT~- APPR(~VFT)~ APPROVED: ?~`-~ 1f ~ mate i Date Signature, At>rhitect/Engineer R)}lA Signature Contactor McCartney Construction Signatvre, Client Representative -COMB Signature, Department of Management Services "`Substantia] Completion Dane DBC 5006 Revised 4103 - Depstrlmt;nt of Management Sen'ices ~ ------~ Division of Facilities Management and Building. Construction ~ E X H I B CONSTRUCTION CONTRACT C1tANGE ORDEK E ~nge Clyder Number: 7 ~~ Slate Project Numher:S'np'!1; - yy!-4?nn S1.at.C l'rojecl Name:~rnnvjiinnc ^-a r'°^' ~nlnn~'hr••fr~, R I Nricr.......ttir Arrhitrrtc ' A Contractor. ll~"r'~rtnr~! C~'~nMn~rliM, (`nmr)a y ArchitecUfsngineer: ^ti^ 1 AddrCSS: 3411 Minnrra Avrnnc 4ui1r lfl Address:~RD(- Csii ~a'h ev..nw• c„i~r~](14 Cit)': C'aral C.ahlrc City' OHVir Sl3LC/'Lip: Flotilla 31134 $t3tC/Lip'.~lnrirla 31314 Phone: 3t-i-4dh-7799 Phone: y5g _(,R9 7R7R DESCRIPTION OF CHANGE Attach additional aees if re wired Decrease hl ]ncrease In l . Description of items -see attached COR # 10 $ 2,987.25 COR # l 1 $ 31,595.18 COR # ]4 $ 27,242.78 COR # 15 $120,5U4:L3 COR # I6 $ 8,335.99 Notice To Proceed Date: 1 I /] 8/02 Orig. Contract Sum: 55,568,002.00 Contract Time: Da s Date* Contract Sum: $5.727 7l I.31 $5.727 7l l .3 l Ori 'nest Contract Time 427 l /] 3/04 Subtotal Present Contact Time 699 l 0125/04 Net Add Deduct $ 184 665.43 is Chan a Add educt 162 Pres. Contract Sum $5 727 7l 1.31 l~ew Contract Time 861 04/05!05 New Contract Sum $5 9l2 376.74 This Change Order is an amendment to the Contract Agreement between Contactor and the Owner, and all contract provisions shall apply unless specif tally exernpied. The amount and time change designated are the maximum agreed to by both the Owner and the Contractor for this changes 1n rnncidrrafinn of the fnrrgninn a clmrnte in nntrart timr and c attar/ enm thr ennlrartnr hrrrhv rrlracrc (lurt,rr from all rtaimc drmanrlc nr ranere of action aricinc not of thr traneartinne rvrnte and nrMi~nerc 'vine rie~ in thie C'hangG nr~ Thie writtrn [~han~r (~rArr ie fhr rntirr pzorrrmrnt hrt~vr~n t~vmrr noel C:nnlrac~~with yg,~rrt in this C`hang~ nrdrr No other agreements or modifications shall apply to ibis contract amendment Un1C55 expressly piOVlded herein. Tlri~ C'hanar (lrtlrrrrnmrr+tc final agra,r,~~ artinn wLrcnant to Srrtinn l~tl 57 Florida Ctatntne x,19 Rl_ v ~r-~n>\e t.~rtr't.Tri>~ ri- A APR (1VFT1• A PPR C1VRT1• APPROVED: • ~~" 0 ]date ~ ~'~/ 7/~ Date Date Signature, Architect/En eer RJHA Signature, ontractor McCartne nstruction Signature, Client Representative -COMB Signature, Department of Management Services *Substantial Completion Date DBC 5006 Revised 4/03 ~ EXHIBI Ikpartmern of Management Services Uivisivn of Facilities Managerrtcnt and Buitding Constrvction F CONSTRUCTION CONTRACT CHANGE ORDER Change Order Number: R rrv t Stale Project Number tnrau _ 9ona~nn $latC 3'rojtxx N8rnC: °i^^vatinnc and ~retc+ratinng, nln ~ 11,ratrr ArchitecUlsngineer R 1 Nricr_nhnttl Arrhi ~m U A Concur: Altr['aAn~ C'nnan+rtinn C'nmpan,~~ Address• ~d0 tutinnrr_a Avrnur~uiln Ip Addmss' tQnn Cw I.AU e.,.K.,,r• C..itr lAQ Clty C~nrnl C~aM~c City Wavle StatrJZip-....F.3ttriAH ~~tzn S1atc/Zip:~tnri v ~'t3ta Phone' at15..44t*~7799 }'bone' QS4~.R9-7fr7R D SCRIPTION OF CHANGE Attach additional ees if uin-d Decrease En I crease In 1. Description o! items -see attached COR ~ 17r $8,79823 1. RFI 165 az the stairs to the roof, the plans did not indicau a Light az the roof landing or intermediate landing. This item is to install 3 fixtures as per skeirh SK 14. 2. Renewal of Builder's Risk insurance for 30 days starting 12/31 /04. Notice To Procoed Date: l 3 /}8/02 Orig. Contract Sum: 55,568,002.00 ntraet Time: Da Date" Contract Sum: SS 912 376.74 SS 912 376.74 Ori 'na Contract'Time 427 l/13104 Subtotal ent Contract Timc 863 04/05/05 Net A uct S 8 798-?] This Chan a Add Deduct Pres. Cotttrect Sum SS 9l2 3?6.74 New Cotmact Time New Contract S 5 92l 174.95 'Ibis Cbmge Order is an amendment to the Cantrad Agreement between Comractor and the OwnQ and all contract provisions sha11 app}y unless specifically exempted. The atnowst and lime change designated are the maximum agreed m by both the Owns and the tAntractnr for ibis tsitange.ln enneieir_rarinn of t'~hr fnr,~nip~ndmrsfe ie nnm*aeN tie++r• xnd rKU+trur•t a,*r, thr~yn~rtnr~h=-~ 7~ycre (kunrr frnn+ sll _Saime A~nxnAe nr rs,+e of aCtinn ancinn nut of 16r trxncartinne events xnA nnen,+r~+rxblVfftn ricr to this ["i,xn~ r)T'rtM TF+ie UlrittlT C'lt-an~r f7tYllT is thr entitr_ ate,-r„rr„nrnt hrltvern (luinnr xnei ('nntexnrx vri1}+ raa+rrfJn„thec ('4, ~r ~E()~rti"''rrCC No other agrtemeuts or modifit~tiom shall a}~pFy to tfiis contract amendment unless expressly provided herein. 'n,i x~~ [~etrr rnnreernte final aon, Taninn nrc„ t,~n_~•linn 1'7n 59 f~'Inriria Ctatntrc (1Q7R1 17 r2MtuftulL~TT1lRTl• O R PR f1lIFr1• O PPR fl~1Ri~• d PDR(1VRt7 tYate Date Date Signaturz, Architect/F,ngineer RJHA Si Contractor M Construction Signadure, Client Rcpresentazive -COMB Signature, Departrnent of Managt~nent Services 'Substantial Completion Datc DBC StHl6 Rcvicnd 4103 17eparunmt of Management Services Division of Facilitits Management and Building Construction CONSTRUCTION CONTRACT CHANGE ORDER EXHIBI G Change Order Number 4 State Ptojoct Number MMR - 99n42n0 $iate Project NBntC' Rr~nvatippe anrt Rrctnrntirmc~'rplpp~ Tl+~atr ArchitectlEagineer' R T Ft~eia'nt.rrttl~ Arrhitrt7e• P_A Contntctor u^_ (`arlnrvr ~nncfn~r4inn C'nm~v Address' ~Ltt bfinerca Avm~ Cnirn to Address- L4M cut ~1t0 e..wn,,. c•,ie. lOq City r^*al [:sll~c -- -- City Davies $~C/j~p• Ftnri ,;,F3~ t ~4 StatC/Zip' Finrida :~~ 14 Phone' 3AS-446-T799 Phone' 454~1t~7R7R DESCRIPTION OF CHANGE Attach additional es if uir~d Dtcrease in increase in 1. Description of items -see attached COR # 18 (S 1,368.00) COR # 19 540,293.88 Notice To Proceed Date: 11/18102 Orig. Contract Sum: 55,568,002.00 Contract Time: ~ Da Date' Contract Sum: 5921 174.95 921 174.95 Ori roar Con Time 427 1113104 Present Contract Ti c 861 04/05/05 Net A Deduct 5 38 925.88 Th' A uct 77 Pres. ~ ct Sum $5 921 174.95 New Cortttaet Time 938 0~21/OS ew Contra 960 100.83 This Change Order is an amendment to the Contract Agrecrnent between Contractor and the Owner, and all contract provisions shall apply unless specifically exempted. The amount attd tiate change designated are the maximum agreed to by both the Owner and the Contractor for this change 1a portrru~nt txNwnen Clurncs and C'nntrwe-~nr wilh re•a~rct to tl~ie C`h~n~C Ardrs No other agreements or modifications shall apply to this contract amendment unless expt+essly provided herein. 'T'his {'}Lane Ckder nw-mcrntc final a~x~~,~t+cnant to Ceetinn 17,Q S7 Florida Crahdre (14781 R 17nnwTtur~rn>~ n• A I~PRnvT?n- APPRnVF17• APPRnVF.n~ 17ate pate nat~ f>At~ Signawre, Arclti[ecUEngineer RJHA Signet M1Contiractor M Consb•uction Sigrlatrae, Client Representative - COM13 Signattue, Dtpartment of Management Services 'Substantial Completion Date DBC 5006 Revised 4/03 Deparoment of Management Services Division of Faciliiics Marfagcmeni and Building Cortcwction CONSTR(JC1:lON CONTRACT CHANGE ORDER EXHIBIT H Change Order Number to State Ptojcet Nwnber .COIIctR - 99nd~ State Projecx Name R~nn inns anal rdnrAtinns ~' Ipn~ Thrs+t*r AfC111tCCt/E11$irlCCr'~. HrjcrnMttlr Arrhitncfe P A COrIVeCCDr AddtCSS' 'idll Minnrra Avenf~Suite IQ _ -_ ______ Address" 4 M Ct[r Ge s,.r„nr d+irn 1(19 City f nrmf (iaF+(cc C[ry' sir StateJT.ip•~tida.33t3d StatrJZip: Ftnritla 3~ztd Phone• 2QS-add-7'>9a Phone• ~~-'ram ION OF CHANGE Attach additional es if ited Decrease 1n i crease In 1. Description of itertrs -see attached COR # 20 S 146,303.03 COR#2l CO# 6 & 7 Phase Fee Credit (S 54,709.53) Contingency ~ 75,ftfttl f1f1 8166,593.50 Notice To Proceed Date: 11/18/02 Orig. Contract Sum: 55,568,002.00 Contract Time: Davs ate• C 5 960 100.8' S 960 100.83 Ori 'nal ontsact Time 427 1/13/04 SuMota} Present t Ti c 9 8 0621/05 Net A l 93.50 Th' a Ad uct 50 Pres. ttm 85 100.83 w Co T' a 988 O8/10/05 New ontsact 86 1 94.33 This Change Order is mr amendment to the Contract Agtserrleat between Contractor and the Owner, and all contrlct provisions sba11 apply unless specifically exempted. The antotmt and titnc change designated art the maximum agreed to by both the Owner and the Contractor for this changc..!a rnneitlrratti of thr fnrrgpi~ a~netrnr+nc in lrsrt firm and ~fmM enm ft+r rnotnfMnr hr~ri+~ rrl~aarrt f]wner rn wll nimc rirmwnde nt can S~ arfinn fricin~ry+t of tl+r caMinne rvrr+tc and nccrrrrr•nerc gig„tfg,ric to thic Chan flrtirr Thic rr+ C'hst+~ K ie thn ene_ t~rr aare~mnnt hettetr~cn, wn~~rr anrr ~'s+n+trar+nr with _rrmec•J to i~ {`hang~nr~.r No other zpeentents or nwdifications shall apply to this contrac! BrtICOdRlent tmless exptt:sssly pnovidod herein. 7S+ie (9fan9 f)rdrr r^ranr.ornfe final ag!,pj•~a~~ +re+~.nt n Srrainn t 7A 57 Flnri~ Ctwtnte!c (197RL 12 At^(1M A,t1±TJT)Fr)• d PPt2 f1VFT)• d PPRnVRII• APPRnVAi]~ f>tate mare n~ Si~atttre, Architect/Engineer RJHA Si , CM/Contractor ey Construction Signature, Client Rcpresarreative -COMB Signature, Department of Management Services •Substantial Comp}eaon Date t~ec soo6 Revisod Oros Department of Managemcnt Services Division of Facilities Management and Building Construction CONSTRUCTION CONTRACT CHANGE ORDER EXHIBIT I ~~ Change Order Number: 1 l Rev. State Project Number: COMB - 9904200 State Project Name: Renovations and Restorations~Colonv Theatre Architect/Engineer: RJ Heisenbottle Architects. P.A. Contractor: McCartney Construction Company Address:~40 Minorca Avenue. Sytite 10 Address: 4800 SW 64'~ Avenue, Suite 109 City: Coral Gables City: Davie State/Zip: Florida 33134 State/Zip: Florida. 33314 Phone: 305-446-7799 Phone: 954-689-7878 DESCRIPTION OF CHANGE Attach additional a es if re wired Decrease In Increase In 1. Description of items -see attached COR # 23 Rev. $125,000.00 A. Budget for ceiling access J life line system $ 80,000.00 B. Contingency $ 45,000.00 $125,000.00 Notice To Proceed Date: 11/18/02 Orig. Contract Sum: $S,S68,002.00 Contract Time: Da s Date* Contract Sum: $6,126,694.33 $6,126,694.33 Ori final Contract Time 427 1/13/04 Subtotal Present Contract Time 988 08110/OS Net Add Deduct $ 125,000.00 This Chan a Add Deduct Pres. Contract Sum $6,126,694.33 New Contract Time New Contract Sum $6,251,694.33 This Change Order is an amendment to the Contract Agrecment between Contractor and the Owner, and all contract provisions shall apply unless specifically exempted. The amount and time change designated are the maximum agreed to by both the Owner and the Contractor for this change. In consideration of the foreeoing, adjustments in contract timc aid contract sum_ the contractor herebyreleases Owner from all claims demands or causes of action arisine out of the transactions events and occurrences givin¢ rise to this Chapge Order This written Chanle Order is the entire agreement between Owner and Contractor with respect to this Change Order. No other agreements or modifications shall apply to this contract amendment unless expressly provided herein. This Chance Order represents final aeencv action pursuant to Section 120.57. Florida Statutes (1978) RECOMMENDED: APPROVED: APPROVED: APPROV F.i~• Date Date Date Date Signature, ArchitecUEngineer RJHA Signature MlContractor MeC ey Construction Signature, Client Representative -COMB Signature, Department of Management Services ~`5ubstantta! L'omplerion llate DBC 5006 Revised 4/03 March 16, 2005 City of Miami 11:45:00 a.m. A Resolution Of The Chairman And Members Of The Miami Beach Redevelopment Agency Authorizing The Executive Director, Or Designee, To Execute The Revised Guaranteed .Maximum Price And Amendment To The Agreement Between The Miami Beach Redevelopment Agency And The State Of Florida Department Of Management Services, Facilities And Building Construction Division, For The Renovations And Restoration Of The Colony Theatre In An Amount Not-To-Exceed $786,502; Authorizing Additional Services To The URS Corporation To Continue Field Observation Services In The Amount Of $60,677; Providing For An FF&E Allowance In The Amount Of $125,000; Providing For An Art In Public Places Allocation For The Construction Of The Building In The Amount Of $9,923; Providing For CIP Fees In The Amount Of $31,752; And Appropriating $1,013,854 From City Center RDA Funds For These Purposes. ACTION: Resolution No. 499-2005 adopted. Motion made by Commissioner Cruz to move the funds; seconded by Commissioner Gross; Voice vote: 6-1. Opposed: Vice-Mayor Garcia. Tim Hemstreet to handle. Jorge Gonzalez, City Manager, introduced the item and explained that this is a request for an additional appropriation to fund improvements to the Colony Theater. He reviewed the history of the project. What is being proposed is to enter into a four party agreement which includes liquidated damages, a commitment to the substantial completion dates, a commitment to the budgets, and barring unforeseen conditions at completion in early fall of this year. Cynthia Marsiglio, Deputy Secretary, Department of Management Services (DMS), who is the project management entity which the City contracted with to manage the project, stated that the project is approximately 80-83% completed and they are looking for a completion date of August 10. Sheldon McCarthey, Construction Manager for the project, spoke. Jorge Gonzalez, City Manager, explained that the City was recommended to DMS by the Department of Community Affairs; the grant is one-third of what we thought we'd receive. Mayor Dermer stated that he doesn't want to see this City being milked by the State of Florida; he wants to make sure that the State of Florida bends backwards to help the City. If they were a private entity, we would be in court. Cynthia Marsiglio, Deputy Secretary, Department of Management Services (DMS), commits to the Commission that the State would bend backwards to help the City. She committed that the State is doing exactly what the City is expecting from the State and her department is bending-over-backwards to complete this project. Commissioner Cruz stated that DMS is doing the honorable thing; however, this was not the way to handle this type of project and this is a lesson learned, and the City has no other choice but to give them what they need and moved the item; seconded by Commissioner Gross. Jorge Gonzalez, City Manager, stated that he has not heard the contractor state that this is the guarantee maximum price. He also requested guidance from the 41 Prepared by the City Clerk's Office C:\Documents and Settings\compgarj\Local Settings\Temporary Internet Files\OLK87\aa031605.doc Afteraction March 16, 2005 City of Miami Beach Commission to direct the Administration to go to Tallahassee to see if the City can get a refund on some of the past fees paid to DMS. Sheldon McCarthey, Construction Manager, explained the circumstances found, including the reasons for the delays in the project. Commissioner Gross, to correct the record, stated that there are still lingering issues that have potential cost impact and requested Mr. McCarthey to state into the record what some of the remaining items are, which could have additional costs implications. The bathroom remodeling is not budgeted. Sheldon McCarthey, Construction Manager, stated that the Building Department is concerned about access to the ceiling area and the architect has proposed lifeline system to be installed in the ceiling. There is a budget item included for this but if something changes from what is proposed it could change the price. Jorge Gonzalez, City Manager, requested -the Commission authorize the Administration to have the City's lobbyists work to perhaps reimburse some of the funding. End of RDA Agenda Meeting adjourned 3:11:14 p.m. 42 Prepared by the City Clerk's Office C:\Documents and Settings\compgarj\Local Settings\Temporary Internet Files\OLK87\aa031605.doc r hmQn~' FACILITIES MANAGEMENT AND BUILDING CONSTRUCTION AGREEMENT BETWEEN OWNER, AGENT, ARCHITECT-ENGINEER AND CONSTRUCTION MANAGER STATE PROJECT NO.: COMB-9042000 STATE MV DESIGNATION: A PROJECT NAME AND LOCATION: Renovations and Restorations, The Colony Theatre City of Miami Beach, Florida OWNER: City of Miami Beach Miami Beach Redevelopment Agency 1700 Convention Center Drive Miami Beach, Florida 33139 AGENT: State of Florida Department of Management Services 4050 Esplanade Way Tallahassee, Florida 32399-0950 ARCHITECT-ENGINEER: R.J. Heisenbottle Architects, F.A. 340 Minorca Avenue Coral Gables, Florida 33134 CONSTRUCTION MANAGER: McCartney Construction Company • 4800 Southwest 64th Avenue, Suite 109 Davie, FL 33314 Jeb Bush, Governor Robert H. Hosay Interim Secretary 513 AGREEMENT BETWEEN OWNER, AGENT, ARCHITECT-ENGINEER AND CONSTRUCTION MANAGER THIS AGREEMENT, made this day of in the year Two Thousand and Five, is by and between the City of Miami Beach (hereinafter tine OWNER), the State of Florida Department of Management Services (hereinafter the AGENT}, RJ. Heisenbottle Architects, P.A. {hereinafter the ARCHITECT-ENGINEER), and McCartney Construction Company (hereinafter the CONSTRUCTION MANAGER} collectively referred to as the PARTIES. WITNESSETH: WHEREAS on October 20, 1999 there was made an AGREEMENT BETWEEN CLIENT AND AGENT for Project No. COMB-99042000 (hereinafter CONTRACT-A); and WHEREAS on Mazch 6, 2000 there was made an AGREEMENT BETWEEN OWNER, AGENT AND ARCHITECT-ENGINEER for Project No. COMB-99042000 (hereinafter CONTRACT-B); and WHEREAS on October 22, 2001 there was made an AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER for Project No. COMB-99042000 (hereinafter CONTRACT-C); and WHEREAS time is of the essence and the PARTIES wish to complete Project No. COMB-99042000 according to the terms and conditions contained herein; and WHEREAS it is the intention of the PARTIES to amend CONTRACT-A, CONTRACT-B and CONTRACT-C so as to make the terms and conditions herein a part ofthose agreements. NOW THEREFORE, the Parties hereby execute this Agreement and agree that the same becomes binding and enforceable by and through the Parties, their assigns, and agree as follows: 1. Final Budget. The Final Budget for the Project shall be as shown in the attached Exhibit-A, which Exhibit A by reference and attachment hereto forms a part of this Agreement. The Final Budget shall not be subject #a modification by Change Order. 2. Snbstantisl Completion Date. The date of substantial completion shall be August 10, 2005. The PARTIES understand and agree that time is of the essence. The date of substantial completion shall not be subject to modification by Change Order. 3. Final Completion Date. The final delivery date shag be September 9, 2005. The PARTIES understand and agree that time is of the essence. The final delivery date shall not be subject to modification by Change Order. 4. Final Schedule. The PARTIES agree to adhere to the final project schedule as shown in the attached Exhibit-B, which Exhibit-B by reference and attachment hereto farms a part of this Agreement 5. Paperwork Timeline. The PARTIES agree to adhere to the paperwork timeline as shown in the attached Exhibit-C, which Exhibit-C by reference and attachment hereto forms a part of this Agreement. 6. Outstanding Change Orders. The Parties agree that the following Change Orders will be approved by OWNER upon submission to OWNER in final format: • Change Order #6 (See Exhibit-D) . Change Order #7 (See Exhibit-E} -1- 514 • Change Order #8 (See Exhibit-F) . Change Order #9 (See Exhibit-G) . Change Order #Ifl {See Exhibit-~ 7. Lilgnidated Damages. Inasmuch as failure to complete the project by August 10, 2005 will result in substantial injury to the OWNER, and as damages arising from such failure cannot be calculated with any degree of certainty, it is hereby agreed that if the project is not substantially completed as in accordance with the provisions of the Contract Documents the COSTRUCTION MANAGER shall pay to the OWNER One Thousand Dollars ($I,fl00} for each and every calendar day elapsing between the date fixed for substantial completion above and the date such substantial completion shall have been fully accomplished, as liquidated damages for such delay. Said liquidated damages shall be payable in addition to any excess expenses or costs payable by the COSTRUCTION MANAGER to the OWNER. 8. Extent of Agreement. This Agreement is intended to be the final agreement between the PARTIES for the completion of the Project. The provisions of this Agreement may be altered only by written instrument signed by all PARTIES. Provisions of CONTRACT-A, CONTRACT-B and CONTRACT-C shalt not be effective for modifying the provisions of this Agreement. 9. Conflict: in the event any of the terms provided in this Agreement conflict with the terms of CONTRACT-A, CONTRACT-B and/or CONTRACT-C, the terms of this Agreement shall control. All other terms of CONTRACT-A, CONTRACT-B and CONTRACT-C shall remain in full force and effect. The terms and conditions herein, together with CONTRACT-A, CONTRACT-B and CONTRACT-G, constitute the entire agreement and understanding of the parties and shall supersede all communications, negotiations, arrangements and agreements, either oral or written, with respect to the subject matter hereof. i0. Warranty of Authority. Each person signing this Amendment warrants that he or she is duly authorized to do so and to bind the respective party. IN WITNESS WHEREOF, the parties hereto have executed this Agreement the day and year first written above. As Witnessed: By OWNER CITY OF MIAMI BEACH APPROVED By Iorge M. Gonzalez, City Manager -2- 515 AGENT DEPARTMENT OF MANAGEMENT SERVICES As Witnessed: APPROVED: By By LeeAnn Korst, Director Facilities Management and Building Construction Department of Managemerrt Services Approved As To Form And Legality: By Office of the Genera! Cotmsel Department of Management Services ARCHITECT-ENGINEER R.J. HEISENBOTTLE ARCHITECTS, P.A. As Witnessed: By APPROVED: By Richard J. Heisenbottle, Corporate President RJ. Heisenbottle Architects, P.A. CONSTRUCTION iYIANAGER MCCARTNEY CONSTRUCTION COMPANY As Witnessed: By APPROVED: By Sheidon McCartney, Corporate President McCartney Construction Company -3- 516 Final Project Funding for Colony Theatre Reconciliation {2111/05) Contract amount through C O # 5 $5,582,326.09 Amount paid through 12/31/04 -$4,655,955.00 Balance of contract Total of direct pay subcontractor purchase orders $672,000.90 Amount paid through 12!31104 -$172,410.68 Balance of direct pay subs Balance to complete incl CM contract and direct pay subs -12/31/04 Outstanding Change Orders CO#6 CO#7 co#s CO#9 CO #9 CREDIT McCartney Additional Credit t_ist of CO#20 items, including insurance thru Aug Balance to complete ~ EXHIBIT F~ $926,373.09 $499,590.22 $145,383.21 $184,665.43 $8,798.21 $66,910.31 $27,884.43 -$54,709.53 $146,303.03 $1,895,329.54 Contingency $75, 000.00 Total to complete construction $1,970,329.54 Addl coast funding (iess exis#ing balance) $544,366.23 r - ffmajor modifications are necessary at Auditorium Ceiling it could add up to $400,OO~o the above~udgSt~u ~ and an addi0anal 3 mon#hs to the project schedule Addl A/E funding ($142,000 + $4991) reduced to $119,420 (wlbal of $2284 in prof} $117,136.00 Tota! Credi# ($29,242.82+$29,855=$59,097.82} DM5 Fee Amt: $16,537.56 (Waived) $0.00 DMS Refund -30,000.00 Total funding to complete project $661,502.23 CO subtotal CO total c~ ^ 1 8 4~5J `. 517 Ss~ w p p m P 0 ~ W 111 + O m P P • W N ~ O ~ P V ~ A Y N ~ G O P V P ~ P C < V P P a V N + s a ¢ g ' f i ~ ~ ~ I ~ ~ y ~-'~ S ~ S ~~ a m ~ ~ ~ m ,3 Ln P o,~ v m ~i ~ ~ ~ b ~ b m ~ S ~ t2 I lUYrS ~ ~ i ° 'q ~ $ a ~ ~77 ! g A~ gip ~~o ~ ~ C v P 19 ~ '~?, ~m ~ c ~ 1 G o F Cb p F. ~ 9 g m a z ~ a 3 ~ a 'a 3 a ~ ~3 a s ~ ~ a ~ 7~ a s ~ .a. z ~ $' ~d I111-rJ m v t~ ~° $ ~J ~ o ~ '+ . ~ ~ ~ y' q ~ 1mq b ~ ~ m -r~ S ~ m ~J - A Y ~ ~ D E m o ~ m $ m _ ° $n ~ `g . ~ ° ~ ~ ~ 3 ~ 3 ~ ~ ~ ~ ~s ~ ~ Q} o ~ C i,~ ~ ~ I 1m- ' p ~ m = {m !' ~ p .~ ~ ~ m $ g ~ R '- ~ ~m ~ - ~ ~m y~ m ,a'4, R s ~ m $ w I$ lp~ ' R w 4 m p~ m IL' lm ~O° m m c ~ c ~ m ~ _ e~ ~ ~ c m ~ EXf $ ~ ~ ~ _ ~ ` ~ ~ P ~ ~ I~ ~ o ~ ~ a m ~ w ~ w m ~ m ~ m ~ ~ m z .m z z ~ ~ l ~ ~ a ~ .~ ~ ~ m ~ G O P ~ P m ~ D : D Y n O P C a ~ g . m ~~ ~ ~ O ~. p m m m 9 9 ' ~ ~ p- L 1 N S ~ ^ ~2 3 P 6 ~ ~ C ~ ~{ C p C : ~ ~ ~ P ~i ~ W O m "~ ' m ~ ~°' 'z A ~ Q O a ~ g S ~ ,~ g m o b ~° i n . r ~ P' N ~ f ,p O d N y n I~Y fl P m ~ ~ ~ g a $ ~ ~ c ~ b i m c c ~ °' °' y m a ~ ~ ° y Q c r a S ' p m m "' .me , a s ~ g -+ m I~ ~ ~ ~ _ ~ W n m a m m ~ = G o ~ ~ y - { O m o ~ IP 7 3 n • • t ~ s IsJ ~ ? m A m ~ a ~ ~ Q v I ~ Y t t{ m ~ ~ i ~ v ~ n O I ~ ~ m + Y F I ~ m P ~ k P v I S 3 ~ 4 m p"ip 7 ~ ~ ~ ~ ~ 3 ~ p~p 7 -1 0 ~ ~ 3 g ~ ~ p3p' 7 p~p 7 ~m~ a 3 S~ 3` 7 ~ C C ~2 Q 2 4 3' Pj ~ C m YI a ~O 7 -i C o -i S c 'SI ~. ~ m a ~ C o ~ c d` a m ~ 7 -{ m C pp~ 3 ~ ~ ~ ~ ~ p 7 i C P -I C o ~-~ C P ~ m G ~ m A i ~ ~ p 7 3. y w ~ ~ a g ~ ~ ~ ~ ~ fi ] r = ~ ~ ~ ~ N~ ^J ~ ~ ~ ' aa ~ D s ~p g ii V a o V a ~ m $ a a ~ P a [ D ~ Q ~ ~ a a ~1 ~ ~ o ~ ~ $ ~ W $ p $ ~ 7 ~ PP ~ ~ ~ ~ / ~ [ J ~ ~ ~~.. p ~ g ~ ~ ~ a .S , S a ~ I p A ~ p R ~ ~ ~ a i 3 a ~ ~ ~ p A p f (dJ p W S~ f p fJ O~t a W a 4) W ~ j W $ 1 i fwd [~.~ ( 0 A .a A a I S A y A A A P a A J . . . W f f ~- e . i !j I i - a ~ ~ ~ . ~ $ _~ $ ~ F ' ~, o ~ V ~ '~ $ ~ ~ S S s ~ ti a I _ i ~_ ~ ~ f ~ i i ~ I I o $ c ~. j ~ ~ ~ ' I ~ i ~ . $ ~ ~ ' ~ _ E ~ °m ~ ~ ~ ~ . ~ i . + f i I f i I I - f ' ~ I + - ~ f I I ~ N ~ P ~ I m ii 81 518 i$i~ ~ V S .. ~ N p g m P N i ~ 0 Y Y g N 1 J Y N Y V T N N i N N N r N +• s V 0 U A r + O P W P I n i d p ,Q +M1' S g`-g'~s ~ ~ ~ m = S m 3 p P g L m n r~ • g ~ v m 9' ~ a~ m ~ 8 n ' s ~ n b c S9 ~~, A v ~ m 2 ~ ~Q ® ~ $$ g m ~ ~ ~ a g O a ~ "^ a s ~ a s ~ ~ ~ c a ~ ~n m a s ~ s ~ QQ~ ~ ~ ~a a o w a g~g w a 434 ~ Q 3 ~ P _ g3 fI i I lm p m m° 'tl g c ~ a ~ m ~ ~ g o > $ ~ d m _ O i ~ Sea g ,~ m 9 m m ~ fi ~ 3 ~ ~ ~ P ~ $ a ~ YS ' S m ~, mm ~ . .~ e f~ ~° ~ m 3 $ ~ ~ - ~ tm ~ $ ~ ~$ l!m ~ m b Y ~ a~ ° ~ X m X m $ w Y m lo c m pm ~ c ~ 4 m ~ m m ~ = S C a t ,~n $ ~ ~ b 1 ''? g ~ $ ~ m ~g o ~ `° S g m ~ g • ~ ~m ~ ~ m _ ~ lo c ~ ~ 2 L 2 2 2 2 o m n c R ~~ ~ m GXE f S ~ p ~ ~ 0 ~ 7 ~c> icD io a ~ ~ ~ P g " m m . ~ '~ a ~ 5 Q '• 3 ~ ro _ N o ~ e N EE - ~ !P la m ~ m g IIm ~ ~ ~ m ~ m ,c _ L ^ n ro c c ~ ' W m m ~ S S ~ g m ~ C ~ o ~ ~ m m m - N ~ S ~ a a ~ ° ~ ~ Q .~ = J a ~ ~ ° ~ o m m y gT$ 3 m ~ ~ 1 111 't ~ ` ~ ~ ~ ~ } ~ ~ n . p p ~ c " ' ~ rs m ~ m I •c I ~ { ~ y m t ~ >'u ~ ~ t F a ~ a ~L a y . ~+g 5 ~ ~ ~ ~ rs 3 1 m ~ ~ 3. ~ g ~ ~ ~ ~ 1 i~ o. 3. Z ~ ~' ~ ~ ~ C ~ ~ ~ ~ ~ ~ - m 1 s S'. g - ~ I -i ~ T 'a. ~' m a - € I ~ ~ 8, 3 9 ~ ~~ 3 3 ~ ~ 3 3 $ B 1 C m 1 C m 1 ~ ~ al a L~ • a +~ ~ ~ B U1 m .. _, ~ ~l d ~ ~ oo V C N g ~ gp~ IS ~ p ~ m •~J• a V ~ ~ V ~ V ~ p V a V a O ~ O~ ~ O o o ~ ~ s ~ a o ~ ~ ~ ~ ~ _ N o ~ g L° ~ ~ ~ ~ ~ Q ± Q rL" ~ b 5 ~ zz ~s ~ _ x ~ ° ~ S ~b ~ ~ i~ xx ~S ~ ~ ~ Q. ~ `y:' ~~ ~,q g 5 ~ ~ ~ ° ]: ~ g S ~ a ~ °a N .6 . tg. o°\a ~ ~ w u ~ ~ c~ w ~.ai 7h w +ai $~ ,a i a ~~ 1 a ,~ - - - I - s 9 ~ I - ' f - - F I p R g a 8 - d Y T r r • ~ f a S Z K .`.. r 1 G - - 1 ~ ( 1 I 1 I ~ 1 1 ~ ~ d N I 1 ~ [ I` 1 ~ ~ J w ~ u ~ S ~ ~ d ' ~o o P Y p $E ~ ~ { V 1 ~ ! _ ~ ~ ~ ~ N I p p d ' I $ z.~ b ~ 1 F j 1{~II ~ ~ 9 ' ~i ~ _ g rn 519 90'0 m~ m - 0 O p O V ~p 0 fi p N ~ ~ u a Y m S 0 m V O N + Y r O b V a m m .. ~ N m n O Y m m p S m Y m O ~ 'g ~~5 SS S f I m~ @ S x < A ~ x C n m m = y 0. ~ 1 I ~ 2 Si -1 SE 3' m~ ~ &~ SC 3 , 3 'x~ d a ' _m • ao a rn o ~ +~ 3 ~ v_ ~ p o jr~ ~3 x < a O x < a n x ~ x ~ v ~ 3 i m m m m c°7 ° u > ~ ;y, m ~~ { m ?~ C? pT ~ ~ m 5 ~ m O m ~~ o -o~ m o ~? @ m m< o m xx < G aa C](7 @ a W S ~ @@ m m 2Q ~. ~ t . @ m Q ~. N m m S ; z ~Ss ~ g~ S r~ cai 4 o ~ g ~ `~ ~ g m~- r 'E m a'o m g g ~ 3 ~ ~ ~ ~ ~ ~+ = ~ w z o 3 ~ ~ ~ ~ ~ ° ~ - ~ ~ ~ m° ._ .fl z p° oo ~ ~ m _ ~ e '~8 ~ ~ g 8 m °c m $n ~ ~ , _ ~ ~ ' ° m m a a ~ ~ ~ ~, fO ~ ~ . a 3 9 ~ a ~ ~ O o ~ ~ m ~ ~ ~ ~ ~ ~ m ~ ~ ~ ~ $ ~ ~ ~ a z ~ ~~ ~ ° ~ m Ls g O O m Q ~ I a 111 ~ d O pn ~ ' _ I.~ 0 O a •c m a~ ~ c O m m ~ ~ w ~ I ; , ~ f a ~ t O C ~ D ~ T ~ ~ T T 5 ~, .~{{ S m 4 m d ~ C ~ C ~ 0 ~ 0 ~ 0 ~ C i 7' C .{ 7' C ~ C ~ C ~ C ~• $ m a A s ~ mm~ GI B p 8 ~ ~ ~ CC m ~ m 8 pp mm 7 4 p 3 ~ C C O C O r& ~ p 3 c m m C o i ~ m ~ N 7 ~ ~ . p ~ ~ • ~ $ S 7. p - . p ~ C a C a O ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ o 0 ~ 0 ~ 0 ~ 0 ~ , ~~ O 3 O ~ ~ ~ ~ 3 ~ g 'a ° P a .~ ~jO1 =~ O ~1tZ1 ~ t(~~ Q M1Q~' 6 ss S{~~ ~ g 3~+ P ~ $ ~' 3 ~ ~ ~ ~ ~ ° a ~ ~ ~ ~ ~ ~ w ~ ~ a w a w a~ w. a w ~ ~ ~ 8 ~ a ~ ~~ ~~ ~ ~ S ~ ~ S °~ i w to w w w t , ~ T 0 V y 9 ~ m ~ QgA ~ p L~F f ~ - P ~ ~ N \ ~ ~ ~ R II m ro - ~ \ 5 v L ~ i f f f I s ~ f ~ I • _ S f { I ~ _ ~ F ~ 1 ~ a l ~ ~ ~ $ ~ !- ~ 1 520 a S 9 N ~ + m d+ C1 N g ~ N C 6 V (~yy 01 ((..~~ • ~ m N r y O + C N m N N P q s N N rN C N O r w V A ~ ~ N O C w O G p w Ca N O p W C ;~ ~ ~ " ~. ° ~ ~ "D m ~ Q O e ~ ~ ~ ~° I ~~ ~{ m m L m 'rL L~1 m ~p p y 61 ~. '" ~ 31 o m ~ f~ m m 6 m ~ ~ 3 ~) to~ g 9 (n m ~ ° S < Y 1~ ~i I CI °~' 0 l ~ '0 m ~ ~ ~_ _ ~ ~i V1 ~ y~ g ~ ~1 711 0 g m~ h 3 T m 73 ' V ~E T ~ AG m O ] y Y i~ n I A m v a ~ i 3o pp ~34 d i en QJ ~ w m Q'a . ~tn ~ :-~s~ m °~ m ~ ~ o S ~ , a. m ~ 2 0 t 7C A ~ 3' +° p. • lc ~ 5 ~ m w a p ~ u r m _ '~ ~ c~ A y~, S ~ ~ n m y ~ ~ ~ ? ~ x m w .n ~ ~ ~ w 3g m g NC s ~ 0 ~2 c '~ 6 yw : S ~ : ~ ~v ¢O O Q m Z m m 'D m s"1 ~ w ? '~ w v ~ '$,~ i _ m gn al ~ E ~ •°. ~ m~ m a ? m ~ ~' ~ ~ ~ ~J mi m 5 41 a ° 3~ . ~ ~ m = 3 ~ ~t ' ~ m ~ a ,o n ~ ° j ~~3 -- ~ m ~ ~ p Q D , a a ~ ~ S m ',2' a °~ ~ ~ m o w nl ~~ ~ ~ .°e' ~' '~ c S ~ ~ ~~ n fi n' g s ~ ~ ~ ' g ° ~ ~ ~ , ~ ~ o ~ o ~ _ ~ a ~ ~ ~ N f N ~ ~,, u 3 3 ~ 0 4 A ~ p : S ! r 1 m ~ a ~ O t ~ o L n ~ m ~ O~ P ~ ~ O ( N f ~ C m 1 t~ ~~ K 1 m "') ~ C ~ m "'~ ~ C ° w '~~ ~ C m d '~ ~ ~ ~ p~ 1 O C m ~{ C m 7t ~. '!1 ~. ~ ~ m C II ~ 333 ~J T 7i~ S 'il ~. T 3 TI y Zl '~li 1 3 T 3 ~ G ~ m 6 ~ pp Q at T Z 3 ~ ~i p p 7 3 ~ ~ ~ ~ C C ~ " ° G 7 m 1 C w a ~ [ ~ ~. ~ Y ~ I ~I • Z ~ a 7 p~p 7 3 p~p 7 q e S ° w $ NN S a ° Q ~ Q ~ ~ o ~ Q O ~ m O ~ m O O ~ ~ a v O ~ N ~ o O ~ v ~ ~ 6 v ~ O D vv O .^ ~ ~ t2 O Q O O ~ ~ ~ N ~ ~ ~ C' Nmu -~ -~ , C p O m O ` Q` O O ro ~`' O Q lNN~3 L" ~ a a u N ~ ~ ~ ~ ~ ~ ~tai °w t°a uai r°~i~ c~n ~ 5'i r°n c°n ~ a ~w~ ~ . ~ 7Ti ~ ~ ~n w~~i ~~ .an a.~ a P. .S a ~ ~ S ~ 5 ~ ~ ~ w ~ }` 'S o_ io ~ ~ o°c g ~ ~ ~ $ - ~ 1 @ ~ ~ 8 ~ - N i ~ ~ f ~~ 0 t I i i ~ 1 ` ~ i V M 4 4 t 3 4 S I 1 j 1 ~ ~ y ° ! ~ O O N . ~ ~ 3 ~ i ° ~ . O ~ m ~ ~ ! ° f ~ I I ~ ~ u I . ~ I 521 _!~D¢¢7 Sa~ a ~~ ep P A .~. pp O ~ ~ . + _ 0 JJ 0 i Vd r 0 - N± - G -- ~~ O a 0 ~ - - N -- > Y - - . pp 6 qq P - V m P A ~ 8 ( l ~ ~ r ~ ~ N ~ ~ ro c 3 ~ as c ° g x m ~ cf (? v m a .o g 1 m Im m m g x D x « D ~ p o ~ s w ~ g m ~ ro ro m m gg ' o a $ m ~ m s g a m e n ~ p ~ a'n T p S 2 < D ~ e g ~ ro r ~ ro m ~ m D m ~ ~ !'9 ~ ~ ro ro1 111 ls: ~ ~ ~ ~ R ~ Q ° m ~ Q ~ 3 m v lr~u ~ o ~ ~ ~ 7'f ® 3 ~ o ~3 ~ ~ ~ ~ ~ 3 ° a ~ y `~ n' ~ ? Q ~ g' ~ m ~ F c s ~ ° D .~ ~ v acs = ~. 'm ~ ' ' ! ~ ~ ~ T ~ ` m m5 m ~ c m ro W t0 ~' 0 ~ ~ o ~ ~ ~ ~ ~ m ~ ~ 3 ~ ~ n j m ~ °• ~ Q,~ - i M O ~ ~ x c o ~ `-O r g $ f ~ ~ ~ i m j ~ g o o i a ~ m m f -t g -1 ( --i~-i g g ~ g ~ i -t ggg g g i~ gg Z ;; g m ~ ~ Q ~ ~ ~ m m,m ~~ ~~ ~s ~ m~ ~ ~~~ ~~ ~~ ~ ss s ss ~ ~ ~ ~ ~ s ti ~ ~ g ' ~ ~ a ' ~~ ~a~ ~o e~ ~ ~~ ~ ~ ~ ~ ~s ~ A ~ ~~ ~~ ~ ~ ~ ~ a o o ~ ~ a o~$ ~~ ao og w ° ~ ~ ~ °~ ~5 ~ ~~ 5 °~ ~ ° ~ ~ ~ ~ w w w w w a w w wiw w. ww w , w w w ( m I . . IiJI o 7 ~. _ ~ I I n y P ~ I ' O ~ b ~ 9 ~$ i O K ' f1 i ~ m ~ ~ i ( _ ' i ~ - - - j ~ ~ R _ ~ ~ I ( I ( e g s F i ( I oa i ~ f i i 522 EXH1BtT d c m N O O a~~n ~~ ~~~ ~~ ~~~ .~ ~~ ~at~ ~ ~~ ~~~~ z°~ n~~ ~ ~,~ ~~~~ ~ ~ f7 C t7 ~ y~vsp O ~~~ ~ ~~ ~ ~~~ ~ ~ ~~~ ~ z 523 0 z b .4' z n a n 0 r 0 y a b 0 i of 3vlanagemeat Sennces Division of Facililses Matt~cmetit and Building Construction COh'STRIlCTtOT! COh1TRACI' ClfANGE ORDER Change prder Ncirubcr. Susie Project Number EXHIBIT D aie Pro3cet Nam L «~ ~..s.uF"r< ~ ' .~ n Contsactar. _~_ _ _ Pa'chitect/F.xtginccr- er in S Addrrss- + `~ _ n Address "~tt`""'-"'r' AvennS City' , City . StaiclTip_ gtattJZip: ~ Phon Q- ..~ __-. inced~_?74U L. 17atr /ul~if' i~ ~ ~t. Sigialxire, Arc3»tectJF.nginecr Signalure~2 Contractor Si~atwcc. Client FJ}3A McCartney Gonslrtictian Represetitativc - COIVID "'Substaaiial t,.omplct5an Date DBC SllQ6 Revised 91D3 Signffi.itne, Zyrpar6meot of Management Serviczs 524 This Ci'castge Order 1S au aipeadment m TIIG Coatsad Agroeroeai between Coniiaaor atul the Vn`.e<, and all mtffiTBGt provisions shall apply ualtss spcct5eally exeaxpiecl. The amount aad time ci>angc d atE the maximum a}g,eed to by bosh the Owner and tht; Coalraewr far this change, In .. a o No other agcrxments os modifications sbatl apply to this can>s'aa ~»v ~ n rs z1...;ae C.fln,tnc 797T.1 amendment ititleSS CkpiL55ly i"-'IdCd IICCCIE. ~•n~ i"'llaneP 1 m'1(7rntitsn}_S nn ~nrv nr1j~R.llltrSnaTaf to S~etinn t7 Deparlrnent of A4anegerneni Services Division of f=acilities lviana`ement and 1luildingConsU'uction CO1\STRUCClOI! CO>~T'RACT CttAnGlr ORDlrit gc Order Number: ~~~ State }3roject Number: ~ _ State Projeee Name: ATChlteci/Gn$Lneer: "" -` itr Architertc P A - {.Oliti'dCtnr: ~ Address' ' ---- ...-....., e,a,~ s n Address: Cit7~ City S~~p• Suate/Lip• ~ Phone: - Phnnc: 1. Description of items -see attached COR # 10 $ 2,98725 COR # 11 $ 31,595.18 COR # l4 $ 21,242.78 COR # 15 $120,504:?3 COR # 16 ~ 8,335.99 Notice To Proceed Date: 1 l/18!02 Orig. Contract Surn: 55,568,002.00 This Change Order is an amendment to the Contract Agreemeasi between Contractor and the Owner, and all contract provisions shall apply tmless spreifically exempted. The amount and time change designated are the maximum agreed to by boas the Owner and the Contractor for this changa..1n No other a~•reetuenis or modifications shall apply w this contract amendment uaiess expressly provided herein. - - -- - /~- Signature, RJHA #Substantial Completion Date DBC SOOb w ,•M1 ,12;tir ~ ~' l ~ ~~~ Signature, Signature, Client Representative -COMB Sig~rature, Dcparhneni of Management Services 525 .~ ~ EXHIBIT Department ol'Management services Qivision of Facr7itits Management and Building Construction g CtJI~lSTR1JCTION Ct3NTRACT CHANGE ORI}ER Change Order Number: R rev i State Projoet Numbcr•.1'A*"tx _ o9r-d~nn State 1'rojea Name: ' - ArehitecUEnginecr n ~ Ue:n..,t.:It-r Arc1,;t,.,~S V a COTSn'eCtOr .3~Gt'+~+~ T nneminlrr~ C`mm~nny Address' 3d0 -Jtinnrca AvciiuCr$trilr f n ~~.~4M C~{f {,d Avmu~ Sttilt_.1Q9 - (,'!i,}r Cnnsl C'whieK :Sty' State2ip-~nnda33t ~a S Phanc 3n5-aa~-'7'799 - ]'b -1 DE TPT10N OF CHANGE additional sees if aired) Decrease [n increase In I . Description of items -see attached . COIL ~ 17r 58,79821 l . RFI 165 at the stairs rA the roof, file plans did not indicate a light at the roof landing err intermediate landmg. This item is to install 3 fixtures as per sketch SK 14. 2. Renewal of Builder's Risk insurance for 30 days starling 12131/Q4. Notice To Proceed Date: l IlIBl02 Orig. Contract Sum: &5,558,002.00 ~~~ 7'~e; Date* Contract Stmt: SS 412 ^76.74 $5.91? 375.74 t'Jri'ai~l Contract Time 427 I/13/f?4 Su $ 8 748'21 is t Caa Time 861 o4rosros Net Ad Deduct This a Add ucfl Pies. Contract Sum SS 91 376.74 New Contract 'l`ime New Cos u 921 174.95 This Change Order is an amendmcat w the Contract Agreement bchveeo Cootractar and the Owner, sad si] contract provisioin shall apply uaie~ sprxl5caily exempted. The maatmt and time change:designated are the maxionna agreed m by both the Owner and the Conitaetor for this change. ~a ^~Lclnrrahnn cif thr Ql~e¢r.ine a~~n~mnm'e in n^.,har.i iimr ,mrt rnnf»ey a~_ tt,r mntrArinr Orr Sr t~aerc f}umr+' f*nm ieli eiairnc rirma++ric nr c;:+,are n, ~rtrnn Nicin~ ns ni= the trRRSSr!'^nc ~' - - = ` =±=~•*'n,n'e ~},' i rice 1n tl~ic Chanvr~Ckrix ,c umnm (hangr„ntder~i° ~r.GnL*r }~«,. k -- +t•--•. Ant Cnnlrare nr ~~+~„ , rt` 1n this r ~ flrrln T10 OitlCr agutu+;nts or modifications 5ha13 apply t0 tills oDAtlBCt amend~ot m~ierssexpressly pu'ovided herein. MMJ;NLh1J' P xrric~v ~~ --- - ,~ete . 5i~attu~ Rrchitaz/Ens^,u>eer Si Cordxadar Signadnre, Client Signattm, Deparnttent of ~~ May Cotrsntraion Representative -COMB Management Services *Sitbstantial Campleiian Date DBC 5006 Revised 4J03 526 Dcparttat:'ut of Ivlana~anent Servixs Division ot'Fxilitics Management and Building Construct+on CpNS1'[2UCPl0ly COt~iTRACT CHANGE ORDER Change Order Number' 9 - StateProjectNuttsbcr' M~"u_oone~tm Slate Project • Contta~xar. ~~,~~~. C 't Addre~ ~ SW (,d avrnnr•„$t .r. 1 n0 ~ Address.. ~ n t t n _ Cj~r ~ _ n _~ Cit7~ .. 27Z,A SiattlLip• Qinritta S Phone_ ;115-d.dfr.7799 Phone. 9ce SR4.S878 - DE T70T} OF AN ttach additions! pcs if ui Decrease in increase Tn 3. Descrtptiort of items -sec attached COR # 18 ($ 1,358.00) COR # 14 $40,293.88 Notice To Proceed Date: 11!18/02 Otig. Contract Stmt: $5,558,002.00 ortvact Time: D Date" C t : $5 42! 174.93 $.5.921 174.95 " final tract Time 427 II13! tots) g 3 9?5.88 Contract me l 04!05105 Tlet A uct 5 I !74.9 711' Chan 1 77 pits. Contract Sum $5 100.83 AievvCotruactTimc 938 fibl2l/OS I3 tr73 This Change Ot>;kr is alt amendment m the Contract Agreat>Cnt between Contractor and the tTsmet, and all caattat:t provisions shall apply unless specifically accmpttd. Tate amowtt and time change designated arc the tnatarnam agreed to by both the Owner and the Contr~tor for this change ..Ia _ _ -- - ,-- -- -.-' t...-t,.. .-t.9.... [l,.~nrr frmm a1S elaimzdGYnBOdS~t - -- ~ ~,~ ~,.,, MM ..:,}, {,.this P`hanoc f]zdc~ 130 other a~etnenls or siodltlcations shall apply W this epcttract atriertd[tuat anless expttssiy provided hett:in. - ,~ to crrtion izlj„S~ 'F'i„riA~a C~_ t,~197R1 A noDAYI1:T1• i)a Date Zliate Date ..,_. Sigttatare, ArchitxcdEttgineer gi M/Corthactor Signature, Client Signature, pepattrnettt of ~~ c~ M Construction Rcpresaitative -COMB Management Services *Sulastantial Completion Date ntsc soot Rcritird 4N3 'i 527 6 Departmrnt of lvianagemcnt Servicts '~ ~ X H ! B I T Tkvision oFFa$ilitics },daoegcmcnt and Bailditg Construction ~ ~ CONS7`RUCTIUN CBNTRACT CHANGE ORDER Change Order Number t ~ State Project Number Stale P%ycct N ~ - Contractor. AtohiteeUEngineer' c : to lrl Address ~q~net~(~i a.;+,. the _ . Aadre,SS,~,;Qjt lutinnrCl AveYt[u+ ' ` - _.. -- CILy' . l~:e..~ rn.~n! r mhlrc _ ~ ' l - StatelZap~ telZig._Ei~dB.,a~ 1 ~4 t a S Itito other agr>+exrretrts err modifications shall apply to this corit<act l ~ ~~ ~lrS~len~e firt l'LOrnry srtirgt rn,mmnt to "^*r^^ 19(1 57 Fltxida Cmh,trc 1147R1_ amendtnerrt uaICSS exprrss y provid ~ e DaDf1VRTl• RECOMMET7DED: ~ APP VED: lLCr rrcvvcu_ .n :r. -- nr~, Signatrsre, ArchitectlEnginesr , Signature, CMlCotrtractor ti SiSnrahtre, Client resentative -COMB Re Signature, Department of Management Services gip on McCartney Construc p 'Substantial Completion Date DBC 5006 Revisod 4103 528 Tfiis Changc Order is an asrtendrnem to the Caattact Agtsernent between Contractor and the Owatt; and ali contract prDrisions shall apply unless specifically czemptorL The amount end timc c#n3nge designated arc 8~e tnexanum arced in by both the Owner and the Contractor forte ~g `~ n.. ,..,.,.......... r..,ri..,rrae~ceC_. Colony Theatre Contract Reconciliation Date: 01!26/2005 Contract amount through C O # 5 $5,582,328.09 Amount paid through 12/31/04 -$4,655,955.00 Balance of contract $926,373.09 Total of direct pay subcontractor purchase orders $672,000.90 Amount paid through 12/31/04 -$172,410.68 Balance of direct pay subs $499,590.22 Balance to complete including C M contract and direct pay subs - 12/31/04 $1,425,963.31' Outstanding Change Orders C O # 6 $145,383.21 C O # 7 $184,665.43 C O # 8 $8,798.21 C O # 9 $38,925.68 List of CO items identified, not formally submitted $48,284.00 Insurance (6 mos cvg thru Juiy bldr risk + windstorm) $37,764.00 Contingency - 12 % of balance to complete $226,774.00 Estimate to complete $2,116,558.04 Upgrades to existing bathrooms -Budget $62,400.00 Revised estimate to complete with bathroom upgrades $2,178,958.04 If major modifications are necessary at Auditorium Ceiling it could add up to $400,000 to the above Budget and an additional 3 months to the project schedule Addl funding to complete prof (construction) $752;994.73 Addl A/E funding ($142,000 + $4991) $146,991.00 DMS Fee $22,499.62 Total funding to complete project $922,485.35 529 ~~r ~r '~ ~~1 March 2, 2005 Ms. Diana Trettin Senior Capital Improvemern Projects Coordinator City of Miami Beach 1740 Convention Center Drive Miami Beach, Florida 33139 Re: Colony Theater Construction Observer Extension Dear Ms. Trettin: As per your request, URS is please to submit the attached fee proposal, extending ow Construction Observer Services at the above referenced project an additional (24) weeks. Colony Theater Work Days Hrs per Day Total Hrs Rate Fee Construction Observer 108 8 854 $ 65.80 S 56851.20 Project Manager 24 1 24 $ 97.55 s 2,341.20 ReEmbursabies Total (M) Cellular Tefe hone 5 .$90.00 S 450.00 Vehicle 5 $207.00 ;1,035.00 Total i iB8 ,677~ The proposed total fee for the services illustrated above is Sixty Thousand Six Hundred Seventy Seven Dollars and Forty Cents. With yow acceptance, ow present services will be extended to cover the period of construction from April 1, 2005 through September 9, 2005. OSAL ACCEPTED By. b I Date: P:IPM - CMIMi~mi Bach Psrka g ReelProjeuVCmb I55- Cokmy Thatet\1-2-05 CT Construuioo Observer Propwral F.xr.doc 7650 Corporate Center Drive, Suite 401, Miami, Florida 33126-1220 Ph.tl; (305) 884-8900 Fax f{ (305) 884-2665 Cc: Jorge Chartrand Page 1 of 2 Hernandez, Kerry From: De Pinedo, Naima Sent: Thursday, August 07, 2008 10:26 AM To: Hernandez, Kerry Cc: Parcher, Robert; Gomez, Carla; Chartrand, Jorge Subject: RE: PENDING RESOLUTIONS, AGREEMENTS AND CONTRACTS REPORT UPDATED TO 6/30/08 Kerry, The Reso has been Form Approved; it will be delivered to you today. Regards, MIAMIBEAGH Naima De Pinedo, Office Associate V CAPITAL IMPROVEMENT PROJECTS OFFICE 1700 Convention Center Drive, Miami Beach, FL 33139 Tel: 305-673-7000 Ext. 6257 /Fax: 305-673-7073 / www.miambea_chfl,gov We are committed to providing excellenf public service and safety to all who live, work and play in our vibrant, tropical, historic community. From: De Pinedo, Naima Sent: Friday, July 25, 2008 11:36 AM To: Hernandez, Kerry Cc: Parcher, Robert; Gomez, Carla; Chartrand, Jorge Subject: RE: PENDING RESOLUTIONS, AGREEMENTS AND CONTRACTS REPORT UPDATED TO 6/30/08 Kerry, I will have the Reso form approved. Thanks, M IAM I BEACH Naima De Pinedo, Office Associate V CAPITAL IMPROVEMENT PROJECTS OFFICE 1700 Convention Center Drive, Miami Beach, FL 33139 Tel: 305-673-7000 Ext. 62571 Fax: 305-673-7073 / www.miamibeachfl.gov We are committed to providing excellent public service and safety to aU who live, work and play in our vibrant, tropical, historic community. From: Hernandez, Kerry Sent: Friday, July 25, 2008 11:30 AM To: De Pinedo, Naima Cc: Parcher, Robert; Gomez, Carla Subject: RE: PENDING RESOLUTIONS, AGREEMENTS AND CONTRACTS REPORT UPDATED TO 6/30/08 Hi Naima, I can scan and file the copy of the agreement that you email me. But we still need the form-approved resolution, which we never received with the 3116/05 agenda or thereafter. Thanks, Kerry M IAM 1 BEAGH Kerry A. Hernandez, Office Associate V 08/07/2008 Page 2 of 2 CITY CLERK'S OFFICE 1700 Convention Center Drive, Miami Beach, FL 33139 Phone: 305-673-7000 ext. 65341 Fax: 305-673-7254 / www mam.b...eachfl,gov We are committed to providing excellent public service and safety to all who live, work and play in our vibrant, tropical, historic community. From: De Pinedo, Naima Sent: Thursday, July 17, 2008 5:22 PM To: Hernandez, Kerry Cc: Gomez, Carla Subject: RE: PENDING RESOLUTIONS, AGREEMENTS AND CONTRACTS REPORT UPDATED TO 6/30/08 Hi Kerry, Re: Reso 499-2005, attached is a copy of the fully executed contract that Tim Hemstreet sent out on May 5, 2005 copying Bob Parcher. I have checked all possible CIP files and I do not have an original. The second file attached is a copy of the unsigned Reso which we neither have an original for. The project is closed out, paid aut, and agreed to by the State and the City but we do not have the staff or the time to go back and re-create the original documents. I hope this will suffice enough to have the item removed from the pending list. Thanks & Regards, MIAMIBEACH Naima De Pinedo, Office Associate V CAPITAL IMPROVEMENT PROJECTS OFFICE 1700 Convention Center Drive, Miami Beach, FL 33139 Tel: 305-673-7000 Ext. 6257 /Fax: 305-673-7073 ! www.miamibeachfl.gov We are committed to providing excellent public service and safety to alt who live, work and play in our vibrant, tropical, historic community From: Hernandez, Kerry Sent: Tuesday, July O1, 2008 12:53 PM To: Velasco, Ana Cecilia; Middaugh, Bob; Noriega, Carlos; Turner, Debora; Morales, Yamilex; Terpak, Drew; Beckmann, Fred; Acosta, Gladys; Lopez, Gus; Ellis, John; Gomez, Jorge; judyhoanshelt@maimibeachfl.gov; Hoanshelt, Judy; Magrisso, Julio; Bonde, Kent; dinorarosario@miamibeachfl.gov; Crowder, Kevin; Smith, Kevin; Sklar, Max; Gruen, Michael; De Pinedo, Naima; Walker, Patricia; Inguanzo, Ramiro; Aguila, Raul; Halfhill, Robert; Middaugh, Bob; Frances, Saul; Gomez, Carla; Hemstreet, Tim; Guzman, Vivian Cc: Parcher, Robert Subject: PENDING RESOLUTIONS, AGREEMENTS AND CONTRACTS REPORT UPDATED TO 6/30/08 Good afternoon, Please find attached the pending resolutions, agreements and contracts report. Please submit to the City Clerk's Office the pending document(s) that you are responsible for completing and submitting. If you have already submitted your document, please inform the City Clerk's Office so we can research it and update the report. Thanks, Kerry MIAMIBEACH Kerry A. Hernandez, Office Associate V CITY CLERK'S OFFICE 1700 Convention Center Drive, Miami Beach, FL 33139 Phone: 305-673-7000 ext. 6534 ! Fax: 305-673-7254 / www.miambeachflgo.....v... We are committed to providing excellent public service and safety to alt who live, work and play in our vibrant, tropical, historic community. 08/07/2008