RESOLUTION NO. 2001-24373
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF
MIAMI BEACH, FLORIDA, APPROPRIATING $85,000 FROM THE GENERAL
OBLIGATION BOND FUND 373 TO PROVIDE LANDSCAPING IMPROVEMENTS
AND TO CONSTRUCT AN ADDITIONAL THIRD LANE AT THE 29TH STREET
ENTRANCE TO SUNSET ISLANDS I & II AND A MEDIAN STRIP TO
ACCOMMODATE A KIOSK TO BE ERECTED AND MAINTAINED BY THE
SUNSET ISLANDS I & II HOMEOWNER'S ASSOCIATION AT ITS EXPENSE.
WHEREAS, the Sunset Islands I & II Homeowner's Association has requested that
an additional third lane be constructed at the 29th Street entrance; and
WHEREAS, on November 6, 2000, the General Obligation Bond Oversight
Committee approved the allocation of $35,000 for the construction of the proposed third lane;
and
WHEREAS, since that time, the Homeowner's Association has requested that a kiosk
(guardhouse) be erected, at its expense, within the right of way at the center of the road, and
that major landscaping improvements be included in the third lane construction project; and
WHEREAS, City staff has completed the design of a proposed project, which
includes the construction of an additional third lane at the 29TH Street entrance to Sunset
Islands I & II, landscaping improvements, and a median strip to accommodate the kiosk, at
an estimated construction cost of $85,000; and
WHEREAS, on May 14, 2001, the General Obligation Bond Oversight Committee
approved an additional allocation of $50,000 for the construction of the proposed project,
including required roadway improvements, kiosk provisions, landscaping and irrigation.
NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY
COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City
Commission approve the appropriation of $85,000 from General Obligation Bond Fund 373
to provide landscaping improvements and to construct an additional third lane at the 29TH
Street entrance to Sunset Islands I & II, and a median strip to accommodate a kiosk, to be
erected and maintained by the Sunset Islands I & II Homeowner's Association at its sole cost
and expense.
Passed and Adopted this 16th day of Mav, 2001.
1l4~ROVED AS l-"
FORt-A &~CUA'.
&~ UTIC':
ATTEST:
Jl\Mt POuk
CITY CLERK
~
S-'hl/
---r;;-~
CITY OF MIAMI BEACH
CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139
http:\\ci.miami~beach. fl.us
COMMISSION MEMORANDUM NO. e:<9tJl-o/
TO:
Mayor Neisen O. Kasdin and DATE: May 16, 2001
Members of the City Commission
Jorge M. Gonzalez \. lr/
City Manager 0 tJ~ 0
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY
OF MIAMI BEACH, FLORIDA, APPROPRIATING $85,000 FROM THE
GENERAL OBLIGATION BOND FUND 373 TO PROVIDE LANDSCAPING
IMPROVEMENTS AND TO CONSTRUCT AN ADDITIONAL THIRD LANE
AT THE 29TH STREET ENTRANCE TO SUNSET ISLANDS I & II AND A
MEDIAN STRIP TO ACCOMMODATE A KIOSK TO BE ERECTED AND
MAINTAINED BY THE SUNSET ISLANDS I & II HOMEOWNER'S
ASSOCIATION AT ITS EXPENSE.
FROM:
SUBJECT:
ADMINISTRATION RECOMMENDATION
Adopt the Resolution.
FUNDING
Funding is to be appropriated from the General Obligation Bond Funds.
BACKGROUND
The Sunset Islands I & II Homeowner's Association has requested that an additional third lane be
constructed at the 29th Street entrance. Their original request that the utility pole behind the existing
guardhouse be removed was required prior to the construction of the third lane. The utility pole and
associated utility relocations have now been completed.
On November 6, 2000, the General Obligations Bonds Oversight Committee approved the allocation
of $35,000 for the construction of the proposed third lane. Since that time, the Homeowner's
Association has requested that a Kiosk (guardhouse) be provided within the right of way at the center
of the road and that major landscaping improvements be included in the project.
City staff has completed the design of the proposed project, which includes roadway, landscaping,
and irrigation improvements. Provisions for the proposed kiosk include ADA accessibility features,
reinforced concrete pad, and required utility relocations (electrical and telephone). Construction is
scheduled to begin in June, 2001 at an estimated construction cost of$85,000.
AGENDA ITEM e 7,44
DATE :5=-/;-(//
Commission Memorandum
May 16. 2001
Sunset Islands I & II Entrance Improvements
Page 2
On May 14, 2001, the General Obligations Bonds Oversight Committee approved an additional
allocation of$50,000 for the construction of the project. The total estimated cost of$85,000 is broken
down as follows: $50,000 for roadway improvements (including kiosk provisions) and $35,0000 for
landscape and irrigation features.
Upon completion of the third lane construction, the Homeowner's Association will obtain the
approvals and permits required for the construction of the new Kiosk and associated security gates,
at their expense.