dment No 2, QGS Development Inc.~~008- ~GyS-a c7~- ~~is~v8 AMENDMENT N0.2 TO THE PROFESSIONAL LANDSCAPE AND ARCHITECTURAL SERVICES AGREEMENT BETWEENTHE CITY OF MIAMI BEACH, FLORIDA AND QGS DEVELOPMENT, INC., DATED MAY 30, 2007, TO RE-CONSTRUCT THE NORMANDY SHORES GOLF COURSE; SAID AMENDMENT PROVIDING FOR THE CONSTRUCTION OF DRAINAGE INFRASTRUCTURE ON FAIRWAY DRIVE, IN AN AMOUNT NOT TO EXCEED $451,435.00. This Amendment No. 2 to the Agreement made and entered this ~ day of f~~~t 2008, by and between the CITY OF MIAMI BEACH, a Municipal Corporation existing unde the laws of the State of Florida (hereinafter referred to as CITY), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida, 33139, and QGS DEVELOPMENT, INC., a Florida Corporation, having its offices at 17502 County Road 672, Lithia, Florida, 33547 (hereinafter referred to as CONTRACTOR). RECITALS WHEREAS, on March 14, 2007, the Mayor and City Commission authorized the Mayor and City Clerk to execute an Agreement with Contractor to reconstruct the Normandy Shores Golf Course, pursuant to Invitation to Bid No. 21 -06/07 (the Golf Course Project) (Agreement); and WHEREAS, on May 30, 2007, the City approved Amendment No. 1 to the Agreement authorizing an alternate irrigation system and an alternative means for draining the greens; and WHEREAS, the Normandy Shores Right-of-Way Infrastructure Improvement Project (Project) includes enhanced landscaping, street lighting, repair and extension of existing sidewalks to comply with ADA requirements, street resurfacing/pavement markings, and improved stormwater drainage collection, including drainage work and re-grading in the swale south of the pavement in Fairway Drive, that overlaps the Golf Course work (the ROW Project); and WHEREAS, the City authorized construction activities for the ROW Project on January 23, 2007, hiring one of the City's Job Order Contract (JOC) contractors; and WHEREAS, the JOC contractor was scheduled to complete its work on the Fairway Drive swale before Contractor was to begin its work on said swale; and WHEREAS, the City has since replaced the original JOC contractor for the Project, which has resulted in a delay of several months to the ROW Project; and WHEREAS, the Contractor is now ready to work on the Fairway Drive swale and the new JOC contractor on the ROW Project is not ready; and WHEREAS, the City and Contractor have agreed upon a price for the drainage work and re-grading in the swale, south of the pavement on Fairway Drive, which will now be incorporated into the Golf Course Project; and WHEREAS, the City believes it to be in its best interest to transfer this portion of the work, along with the necessary funding, from the current JOC Project to Contractor. NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No. 2. 2. MODIFICATIONS The Agreement is amended as defined in Exhibit "A", attached herein. 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged. 4. RATIFICATION. The City and Contractor ratify the terms of the Agreement, as amended by this Amendment No. 2. IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 2 to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: City Clerk Robert Parcher ATTEST: SECRETARY ~o~a.~pl Mai` Print Name `7/fig fv CITY OF MIAMI BEACH By ayor Matti Herrera Bower CONTRACTOR: QGS Development, Inc. By~ ~,L~ PRESIDENT Print Name -~/~/~ APPROVED AS TO FORM & LANGUAGE ~ F~?R EXECUTION 0 D to ~~ Exrt~x3.L i "~4 17502 County Road 672 ^ P.O. Drawer 108 ^ Lithia, FL 33547 Phone: (800) 446-3326 ^ (813)634-3326 ^ Fax: (813) 634-1733 CHANGE ORDER PROJECT: Normandy Shores Golf Course CHANGE ORDER #: 18 2401 Biarritz Drive DATE: 12/28/2007 Miami Beach, Florida CONTRACT DATE: 5/30/2007 CONTRACTOR: QGS Development, Inc. CONTRACT FOR: P.O. Box 108 Golf Course Improvements Lithia, Florida Partial Drainage Along Fairway Drive - As Per Attached Proposal Dated 10/26/07. Total: 5451,435.25 „ „ ~! ~X f7FL /3,~. % ~ Page 1 of 3 ]7502 County Road 672 ^ P.O. Drawer 108 ^ Lithia, FL 33547 Phone: (800)446-3326 ^ (8l3) 634-3326 ^ Fax: (813) 634-1733 ESTIMATED SCHEDULE OF VALUES FOR Normandy Shores Partial Drainage Along Fairway Drive t. Mobilization ' Item ~ ~t ~ ~ ~ ~ +~: ~- Y: .. ,. . l I Mobilization 1 Is $ 4,750.00 $ 4,750.00 2 Pa ment & Performance Bond 1 Is $ 4,275.00 $ 4,275.00 Section Total $ 9,025.00 2. Grading Item ~, ~ ~ r k (~ ~1~ ~ , d , tlWt ~! _ ~ ~ . ~ _ Grading Swales Adjacent to Fairway Drive I (Sta 22+00 to Sta 63.50) 1 Is $ 22,942.50 $ 22,942.50 Section Total $ 22,942.50 October 26, 21107 QGS Development, Inc. rep-.lanuan~ 2, 2008 ~~ .~ i ~q ~~ 3~`f Page 2 of 3 3. Storm Water W '.Item ~ yam. ~, ..ti ~ "~ ~~ r' f~~ ' rve't 1A.. ~^i k`y'~'.. ~, ~ ; ~;~ ";+3q~~' _ ~ .t y~~ •, .,Y ~:~ ,dam-y 't~~ ~" ` ~ ,... t~ Unit P .:... r 1, . =~,-'' b Y ~.`~~abt 1 Structure B-18 Onl 1 is $ 9,533.25 $ 9,533.25 2 Structures C-23 & C-22a & 20' of 15" HDPE 1 Is $ 14,839.00 $ 14,839.00 3 Structures C-25 & C-24a & 20' of 15" HDPE 1 Is $ 14,839.00 $ 14,839.00 4 Structure C-26 & 20' of 18" HDPE 1 Is $ 11,447.50 $ 11,447.50 5 Structures C-28 & C-27a & 20' of 15" HDPE I Is $ 14,839.00 $ 14,839.00 6 Structures C-31 & C-30 & 20' of 15" HDPE 1 is $ 14,839.00 $ 14,839.00 7 Structures C-33 & C-32a & 20' of I S" HDPE 1 is $ 14,839.00 $ 14,839.00 8 Structures D-20 & D-19a & 20' of 15" HDPE 1 is $ 14,839.00 $ 14,839.00 9 Structures D-22 & D-21 a & 20' of 15" HDPE 1 is $ 14,839.00 $ 14,839.00 10 Structures D-24 & D-23a & 20' of 15" HDPE 1 is $ 14,839.00 $ 14,839.00 I 1 Structures D-26 & D-25a & 20' of 15" HDPE 1 Is $ 14,839.00 $ 14,839.00 12 Structure D-27& 20' of 24" HDPE 1 is $ 1 1,447.50 $ 11,447.50 13 Structures D-29 & D-28a & 17' of 15" HDPE 1 is $ 14,839.00 $ 14,839.00 14 Structures D-31 & D-30a & 17' of 15" HDPE 1 is $ 14,839.00 $ 14,839.00 15 Structures D-33 & D-32a & 20' of 15" HDPE I Is $ 14,839.00 $ 14,839.00 16 Structures E-15 & E-14 & 20' of 15" HDPE 1 Is $ 14,839.00 .$ 14,839.00 17 Structures E-17 & E-16a & 20' of 1 S" HDPE 1 is $ 14,839.00 $ 14,839.00 18 Structures E-l9 & E-18a & 20' of 15" HDPE I Is $ 14,839.00 $ 14,839.00 19 Structures E-21 & E-20a & 26' of 15" HDPE I is $ 14,839.00 $ 14,839.00 20 Structure E-22 & 20' of 18" HDPE 1 is $ 11,447.50 $ 11,447.50 21 Structures E-24 & E-23a & 26' of 15" HDPE 1 is $ 15,010.00 $ 15,010.00 22 Structures E-27 & E-26 & 20' of 18" HDPE I Is $ 14,839.00 $ 14,839.00 23 Structure E-29 & 172' of 18" HDPE I Is $ 28,405.00 $ 28,405.00 24 Structures F-20 & F-22 & 200' of 18" HDPE 1 Is $ 35,245.00 $ 35,245.00 25 Structures F-23 & 74' of 18" HDPE I is $ 17,860.00 $ 17,860.00 26 Structures F-25 & 126' of 18" HDPE 1 Is $ 23,655.00 $ 23,655.00 Section Total $ 416,313.75 4. Sanitary Sewer Item ":Nj .r,~, `a'~.' lot-'~~ ~+~ ~,~' ~ , , 1'~ ,'~ `.` f~Unitt)Price~~- ,~,~:_.. T~ .:i a _ I Adjust SS Manhole Tops - If a lower cone is needed, the city to furnish 8 ea $ 394.25 $ 3,154.00 Section Total $ 3,154.00 Normandy Shores Partial Drainage Along Fairway Drive . SUMMARY I. Mobilization $ 9,025.00 2. Grading $ 22,94Z.SU ~. Storm Water $ 416,313.75 4. Sanitary Sewer $ 3,154.00 Project 'T'otal $ 451,435.25 Ortobcr 2fi, 2(10'7 QCS Dcvclopment, Inc. rcv.Ianuary 2,2008 Page 3 of 3 PROPOSAL CLARIFICATIONS The City of Miami Beach will provide all pre-cast Boxes, grates, chains and pipe needed to construct the above work scope in a timely manor. The contractor will furnish the necessary brick, mortar, bedding gravel, MOT, survey layout, pavement patching and dewatering. Once the structures and pipe are accepted, the contractor is no longer responsible for flushing, cleaning or repairs. This proposal assumes there is no curb along Fairway Drive to be removed or replaced. This proposal does not include any turf eradication, strip & bury turf only. The city will be responsibility to handle the dewatering discharge if the golf course can not handle it. The owner to be responsible for all pre-construction permits, inspections, fees, and surcharges required to perform the contracted construction. he above pacing ~s based on the present market. Uue to volatility of liquid asphalVasphalt (petroleum products, shortages in concrete, steel and plasticlPVC materials, we are unable to predict the future market. This proposal does not include any adjustments/surcharges for material price increases. QGS Development, Inc. reserves the right to surcharge for unexpected and documented sudden increases in such materials. QGS Development, Inc. reserves the right to adjust the project schedule, where necessary, due to shortage and/or availability of such materials. This proposal does not include any debris, trash, toxic waste or materials removal, disposal, sorting or handling. This proposal does not include any excavation, disposal andlor replacement of rock, unsuitable or unstable material. Nor does it include any subgrade, special bedding or backflll in the pipe trenches, sidewalk or other infrastructure items. Rock encountered in any mass, trench or structure excavation that can not be removed by normal machine methods with the equipment available on site will be the owners responsibility to remove or leave in-situ. Owner to provide access, stockpile and staging areas on the job site and responsible for all power pole 8 utility relocations. Owner is responsible for atl as-builts, permits, testing, governmental ~ jurisdictional fees and inspections. Uctobcr 26, 20(17 QGS Development, Inc. rep .-anuar~~ 2, 2oi-s