Loading...
LTC 474-2020 CITY HALL RENOVATION OF THE BUILDING DEPARTMENT City of Miami Beach, 1700 Convention Center Drive, Miami Beach FL 33139 LTC# LETTER TO COMMISSION TO: Mayor Dan Gelber and Members of the City Commission FROM: Raul J. Aguila, Interim City Manager DATE: December 23,2020 SUBJECT: CITY HALL RENOVATION OF THE BUILDING DEPARTMENT The purpose of this LTC is to update the Mayor and City Commission on the renovation of the Building Department at City Hall. The Building Department is in need of a reconfiguration that can improve the overall customer experience. Additionally, the existing systems are dated and in need of upgrades. The scope of the renovation will take place on the 1st, 2nd, and 3rd floors of City Hall. The size of the area to be altered along these floors is approximately 15,368 square feet. The new design allows for a safer environment for City Staff, while providing a more efficient, dynamic area for the public. The renovation will address obsolete mechanical, electrical, and plumbing systems, replacing with energy efficient fixtures and equipment reducing operating costs. This will be a three (3) phase renovation. Phase one is inclusive of the 3rd floor inspector’s section, phase two is broken into 2nd floor admin section and 1st floor check in counter, and phase three is the remaining of the 2nd floor permit clerk section. The Building Department will remain closed during construction. However, the day to day operations will not be impacted during construction, as the staff will work remotely. The project has a duration of 4 months, commencing on January 6, 2021, and anticipating a completion date on May 11, 2021. Should you have any additional questions, please contact Adrian Morales at 305.673.7000 ext. 2932. RJA/MT/AM/FG DocuSign Envelope ID: 23E64716-0A7C-4BDC-BEE6-9DBE971A5243DocuSign Envelope ID: 9ACD999C-01BA-42C7-B1BF-01D33CE995A5