Loading...
Agenda and Handouts_2-18-21 General Obligation Bond Oversight Committee City of Miami Beach Karen Rivo, Chair Maria Hernandez, Liaison AGENDA – VIRTUAL MEETING February 18, 2021 I. Roll Call and Introductions All 4:30pm II. Committee Business Karen Rivo 4:35pm • Adoption of Meeting Minutes from 1-21-21 • Welcome New Members: o Jason Koslowe & Carmen Browne • Committee Charge Refresher • Org Charts: Maria Hernandez o Committee Org Chart for 2021 o Program Org Chart - Current • Sunshine Law Refresher Jason Jacobson III. Community Outreach Allison Novack 4:50pm • List of Current Public Meetings (Pending) IV. Public Comment Public 4:55pm V. 72nd Street Complex Update Procurement / CIP 5:10pm • Commission Item C7 R (Deferred) VI. Fire Station No. 1 Update CIP 5:20pm VII. Revision to Implementation Plan Maria Hernandez / 5:30pm • Worksheet and Summary John Woodruff VIII. Public Comment Public 6:50pm IX. Adjournment 7:00pm Committee Charge The purpose of the General Obligation Bond Oversight Committee is to make advisory recommendations to the City Manager and City Commission from a macro perspective regarding the timely progress, overall goals, costs, including financial efficiencies, and the timely completion of General Obligation Bond Program projects approved by the voters in the City of Miami Beach Special Election held on November 6, 2018. The Committee shall have the following powers & duties: 1. Receive input from the public, the City Administration, City consultants, and the City’s Inspector General, as needed, to make recommendations relative to the overall timing, cost efficiencies, and prioritization of the G.O. Bond Program projects. 2. Provide general oversight to ensure that G.O. Bond Program project timelines, budgets (including cost efficiencies) are prioritized and achieved, and that the projects are completed in accordance with the scope of work approved by the voters. 3. Review City staff and G.O. Bond Program project managers’ progress reports and provide monthly reports to the City Commission. Mayor &Commission Chair Karen Rivo Jason Greene South Beach MIAMIBEACH GO Bond Oversight Committee Carmen M. Browne North Beach Laura Veitia North Beach JackGlottmann Middle Beach Francisco Diez- Rivas Middle Beach MariePeter South Beach John Bowes Budget Committee Voting Members Non-Voting Members Sean Smith Parks & Recreation Committee Jason Koslowe Sustainability Committee Bryan Rosenfeld Audit Committee SECTION II.a Project Strikethrough Indicates Completed Project Project Red Indicaties Project in Process Mayor &Commission GO Bond Oversight Committee Interim CityManager Raul J. Aguila GOBond Working Group GO Bond Program Director Maria Hernandez GOBond Program Assistant Director Thais Vieira Community Information Manager Allison Novack Program Coordinator Devin Ramirez Communications Finance / Budget Resiliency Procurement CIP Environment & Sustainability Parks Property Management Police / Fire Public Works Tourism/Economic Development Transportation -Marine Patrol Facility -PAR3/Bayshore Park -Art Deco Museum Expansion -Ocean Rescue North Beach -Baywalk -72nd St Community Complex -Flamingo Park & Youth Center -Maurice Gibb Park -Fire Station #1 -Fire Station #3 -Beach Walks -Palm & Hibiscus Landscaping -La Gorce Neighborhood -Flamingo Park Neighborhood -North Shore Neighborhood -Neighborhood Above Ground Improvements -Street Tree Master Plan -Waterway Restoration -LED Lighting In Parks -Collins Park -Crespi Park -Fairway Park -Fisher Park -La Gorce Park -Marjorie Stoneman Douglas Park -Muss Park -Palm Island Park -Pinetree Park -Polo Park -Stillwater Park -Tatum Park -Skate Park -South Pointe Park -Lummus Park -Police HQ Renovations -Roofs For Cultural Facilities -Log Cabin -Scott Rakow Youth Center -North Shore Park & Youth Center -Security Cameras -License Plate Readers -Public Radio System -Street Lighting Improvements -Security For Public Spaces -Street Pavement Program -Sidewalk Improvement Program -Seawalls & Living Shorelines -Soundscape Park -West Lots Redevelopment -Ocean Drive Project -41st StCorridor -Washington Avenue Corridor -Neighborhood Traffic Calming & Pedestrian Friendly Streets -Protected Bike Lanes & Shared Bike / Pedestrian Paths MIAMIBEACH GO Bond Program Inspector General Residents SECTION II.b SECTION III ITEMS RELATED TO G.O. BOND PROGRAM PROJECTS AT VARIOUS CITY COMMISSION & COMMITTEE/BOARD MEETINGS & VIRTUAL PUBLIC COMMUNITY MEETINGS UPCOMING MEETINGS: 2/19/21 Finance and Economic Resiliency Committee • Discussion regarding adding a funding source for the Bayshore Park (former par 3) project utility relocation (Public Works) 2/24/21 Neighborhood and Quality of Life Committee • Discussion Regarding the North Beach Regional Parking Plan Recommendations (pending agenda) • Discussion and Approval of The Florida Department Of Transportation Traffic Analysis For The 63 Street Complete Streets Study Proposing An Elimination Of An Eastbound Travel Lane On 63 Street Between Pine Tree Drive And Indian Creek Drive To Accommodate Protected Bicycle Lanes. – (Commissioner Meiner, Transportation) • Discussion Regarding Lighting in Lummus Park and Marine Turtle Protection (Environmental) 2/25/21 Mayor’s 41 Street Blue Ribbon Committee • Update on GO#40: 41 Street Corridor project 2/24/21 (or 3/17/21) City Commission Meeting • Award RFP 2020-180-ND, Design/Build Services for 72nd St. Community Complex. (CIP) 3/2/21 Urban Forestry Master Plan Commission Workshop • Special Commission Workshop to discuss Street Tree Master Plan palm removals (Commissioner Meiner, Environmental) Page 2 of 2 3/2/21 Virtual Community Meeting: Normandy Traffic Calming Project • Discuss and gain resident feedback on G.O. Bond-funded Traffic Calming solutions (Transportation) 3/4/21 Virtual Community Meeting: Bayshore Traffic Calming Project • Discuss and gain resident feedback on G.O. Bond-funded Traffic Calming solutions (Transportation) 3/17/21 City Commission Meeting • TBD, Items Pending Agenda *Note: All upcoming items are subject to change. For the most accurate items for each meeting, please review the agendas on the City’s website. Agendas: https://www.miamibeachfl.gov/city-hall/city-clerk/agenda-archive-main-page-2/ Meeting Notices: https://www.miamibeachfl.gov/city-hall/city-clerk/meeting-notices/ PAST MEETINGS: 1/28/21 Mayor’s 41 Street Blue Ribbon Committee • Update on 41 Street Corridor project – Design Development Phase (CIP) 2/10/21 City Commission Meeting • Award ITB 2020-026-DF, North Beach Oceanside Park Beachwalk. (CIP) PASSED 2/11/21 Parks and Recreation Facilities Advisory Board • An update on the implementation of GO Bond projects related to Parks and Rec. (CM, Finance) 2/12/21 Mayor’s Art Deco Cultural District Panel • Discussion regarding Ocean Drive _________ Request for Qualifications (RFQ) 2020-180-ND for Design/Build Services for 72nd Street Community Complex Page 1 City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov COMMISSION MEMORANDUM TO: Mayor Dan Gelber and Members of the City Commission FROM: Raul J. Aguila, Interim City Manager DATE: February 10, 2021 SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE CITY MANAGER, TO AUTHORIZE NEGOTIATIONS RELATING TO REQUEST FOR PROPOSALS NO. 2020-180-ND, FOR DESIGN/BUILD SERVICES FOR 72ND STREET COMMUNITY COMPLEX (THE RFP); AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH THE HASKELL COMPANY, AS THE TOP RANKED PROPOSER; FURTHER, IF THE ADMINISTRATION IS NOT SUCCESSFUL IN NEGOTIATING AN AGREEMENT WITH THE HASKELL COMPANY, AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH PCL CONSTRUCTION SERVICES, INC., AS THE SECOND RANKED PROPOSER; FURTHER, IF THE ADMINISTRATION IS NOT SUCCESSFUL IN NEGOTIATING AN AGREEMENT WITH PCL CONSTRUCTION SERVICES, INC., AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH KAUFMAN LYNN CONSTRUCTION, INC., AS THE THIRD RANKED PROPOSER; PROVIDED, HOWEVER, THAT THE FINAL NEGOTIATED AGREEMENT SHALL BE SUBJECT TO THE PRIOR APPROVAL OF THE MAYOR AND CITY COMMISSION. RECOMMENDATION The Administration recommends that the Mayor and City Commission of the City of Miami Beach, Florida approve the Resolution accepting the City Manager’s recommendation pertaining to the proposals received pursuant to RFP 2020-180-ND for design/build services for the 72nd street community complex. BACKGROUND/HISTORY On November 6, 2018, Miami Beach residents approved a ballot measure, which authorized the issuance of a general obligation bond (G.O. Bond) for the design, permitting, installation, and construction of the 72nd Street Community Complex. A total of $53.8 million of general obligation bonds are allocated to fund the project, including but not limited to the design, permitting, and construction. An additional $10.6 million has been allocated from different funding sources bringing the total project budget to $64.4 million. The Project programming as described in the Design Criteria Package (DCP) includes a multi-level mixed-use parking garage requiring the program components of a 500 space parking structure, 50-meter competition pool with support amenities, 25-meter multi-purpose pool, 7,500 SF Miami-Dade County library, 5,000 SF commercial/retail, 7, 500 SF fitness center, 5,000 SF community center, 60,000 SF of active green space, and a jogging path. Furthermore, the DCP included Project Enhancement components that could be considered by the proposers as desired (but not required) project elements with the intent to be included within the proposed project budget. DocuSign Envelope ID: 859C08A2-267B-42D2-9718-9442485A69B2 Agenda Item: C7 R Date: 2/10/2021 MIAMI BEACH SECTION V DE F E R R E D Request for Qualifications (RFQ) 2020-180-ND for Design/Build Services for 72nd Street Community Complex Page 2 ANALYSIS On June 24, 2020, the Mayor and City Commission authorized the issuance of Request for Proposals (RFP) 2020-180-ND for Design/Build Services for 72nd Street Community Complex. The RFP stipulated a two-phase process. Phase I required the submittal and consideration of the Design/Build firm’s qualifications. Phase II required the submittal and consideration of the Design/Build firm’s Technical Proposal which included each firm’s proposed design, project approach during design and construction, project schedule and the Guaranteed Maximum Price (GMP). On June 26, 2020, the RFP was issued. The RFP established a proposed project budget of $55 million for design and construction. The intent was to have the Design/Build firms include all the project programming and any project enhancements that could be implemented within this proposed project budget. On August 10, 2020, the City received seven (7) Phase I proposals. On September 16, 2020, City Commission adopted Resolution No. 2020-31387 shortlisting the following firms to be further considered in Phase II: Kaufman Lynn Construction, Inc, PCL Construction Services, Inc. and The Haskell Company. On December 14, 2020, the City received proposals in response to Phase II of the RFP from the three short-listed proposers. The Evaluation Committee, appointed by the City Manager via LTC # 276-2020, convened on January 29, 2021, to consider the Phase II technical proposals received. The Committee was comprised of Monica Beltran, Assistant Director, Parking Department; Cynthia Casanova, Assistant Director, Parks and Recreation Department; David Gomez, Division Director, The Office of Capital Improvement Projects; Carolina Jones, Member, Parks and Recreation Advisory Committee; Carmen Sanchez, Deputy Planning Director, Planning Department; Daniel Veitia, Resident, North Beach; and Elizabeth Wheaton, Director, Environment and Sustainability Department. The Committee was provided an overview of the project, information relative to the City’s Cone of Silence Ordinance and the Government Sunshine Law. The Committee was also provided general information on the scope of services, a copy of each proposal, and engaged in a question and answer session with each proposer. The Committee was instructed to score and rank each proposal pursuant to the evaluation criteria established in the RFP for Phase II. The evaluation process resulted in the ranking of proposers as indicated in Attachment A, in the following order: 1st The Haskell Company 2nd PCL Construction Services, Inc. 3rd Kaufman Lynn Construction, Inc. The Guaranteed Maximum Price (GMP) submitted by each firm is as follows: The Haskell Company $94,200,025. PCL Construction, Inc. $80,202,724. Kaufman Lynn Construction, Inc. $79,976,000. Given the large size of the Phase II proposals, they are not attached to this item but are available upon request. A summary of each of the firms follows: DocuSign Envelope ID: 859C08A2-267B-42D2-9718-9442485A69B2 DE F E R R E D Request for Qualifications (RFQ) 2020-180-ND for Design/Build Services for 72nd Street Community Complex Page 3 Kaufman Lynn Construction, Inc. Kaufman Lynn Construction, Inc. (Kaufman Lynn), founded in 1989, is a local construction company that has built high-quality buildings for more than 30 years, with a diverse portfolio of projects to reflect this expertise. Its management approach is focused on fulfilling the objectives of their clients by embracing the collaborative nature of the process. Kaufman Lynn has grown into an industry leader by blending best in class cost savings with stringent quality control processes. It is consistently recognized by peers for quality, safety, business practices, and community service, and rank among the largest contractors in the nation. Kaufman Lynn in association with Zyscovich Architects and Recreational Design & Construction bring a high-quality design sensitive to the issues of the location and the community, with specialized experience in recreational aquatics design and the quality of construction to meet the high expectations of Miami Beach. Combined, the team has worked on over 350 parking garages, and more than 400 pools, including elevated, competition, and Myrtha pools in various design and construction functions. The team members have collaborated on various projects including the FAU Mixed Use Parking Garage, Mirador Mixed Use Parking Garage, Bluesten Park, and many others. Its significant parking garage and aquatic experience is supplemented by its experience building community spaces for municipal and other public clients. PCL Construction Services, Inc. PCL Construction Services, Inc. (PCL) specializes in multi-faceted projects including mixed- use, parking structures, aquatic facilities, libraries and community/recreation centers in coastal communities. Its Florida staff of over 200 provide full service preconstruction, estimating, purchasing, human resources, and marketing services in-house. PCL is ranked #1 contractor in Florida by Engineering News-Record (ENR). Finally, its capability to manage a large and complex design-build project is reflected in the firm’s experience on more than 870 previous design-build projects. PCL along with BEA Architects and Brooks + Scarpa have assembled a team of highly qualified professionals to execute the 72nd Street Community Complex. This strategic team brings the City of Miami Beach the combined depth and breadth of PCL, the nation’s 9th largest contractor with two of South Florida’s most prominent architects, with 40 years of trusted local experience and superior standing in the South Florida market. Its selected subconsultants round out this team with their extensive relevant experience, local knowledge, and commitment to the success of this high-profile project. The Haskell Company The Haskell Company (Haskell), is a global pioneer in design-build construction with over 55 years of experience. It has been working and committed to the Miami area for over 20 years, completing such projects as three Miami Dade College parking garages and most recently, the Norwegian Cruise Line Terminal also known as the “Pearl of Miami”. The Miami office has supported landmark projects, such as the Adrienne Arsht Center. With over $1B in annual revenues and over 2,500 design-build projects completed to date, Haskell is appropriately experienced, staffed and financed to support large and complex design-build projects that are fast-tracked and programmed with multiple disciplines. Partnered with Haskell is Arquitectonica, who brings a very experienced team of professionals that have creativity and community in mind, as well as Kimley-Horn, McNamara Salvia, Weston & Sampson, SEQUIL, SLS and Weller Pools. The team, combined with noteworthy consultants with vast local experience, was formed for each firm’s relevant field experience and organizational excellence in order to bring the City the best design-build solution. This team, which contains a considerable degree of experience, imagination and capability, intends DocuSign Envelope ID: 859C08A2-267B-42D2-9718-9442485A69B2 DE F E R R E D Request for Qualifications (RFQ) 2020-180-ND for Design/Build Services for 72nd Street Community Complex Page 4 to combine the criteria noted in the design criteria package, while delivering on time and within budget. SUPPORTING SURVEY DATA Results from the 2019 resident survey show that 80% of residents are satisfied or very satisfied with living in North Beach. In order to continue to improve the satisfaction of these residents, the City intends to contract with a design/build firm to design and construct the 72nd Street Community Complex which will provide the North Beach residents with a multi-level mixed use parking garage. FINANCIAL INFORMATION Final project costs to be determined via negotiations, not to exceed the approved project budget. CONCLUSION After reviewing all of the submissions and the Evaluation Committee’s rankings and commentary, I concur with the Evaluation Committee and find that The Haskell Company provided the best technical proposal. However, because the GMPs proposed exceed the City’s cost expectation, I also concur with staff’s recommendation that the City negotiate with the firms, in rank order, to finalize a design build agreement. Some of the highlights of the technical proposals of the three firms, as articulated by the evaluation committee, include: The Haskell Company • The firm designed a multifunctional field that can hold up to 2,000 people and can be utilized for athletic and event programming. • The firm designed the largest footprint, but the least overbearing. • The firm designed a cohesive community civic center. • From the four street fronts, to the elevated green field and upper pool deck, the entire complex is oriented to enhance the well-being of the community. PCL Construction Services, Inc. • The firm designed the complex to serve as an urban living room that would be ideal for relaxing and socializing as well as providing a recreational anchor for the North Beach district. • The firm’s design provided the best pedestrian connection. However, the footprint did feel overpowering. • The solar roof was well thought out with the panels strategically placed to capture as much energy as possible. • The building design is massive and does not necessarily engage Collins Avenue. Kaufman Lynn Construction, Inc. • The firm incorporated a rain garden in the design. • The design was disjointed. The pool, the community center, and fitness center had no connectivity between them. • The design places the field on the west side, which forms a screen that protects the turtles from the evening lights. • The design has no integration. It is a building on a field. Given the disparity between the GMP proposals submitted by the Design-Build firms and the proposed project budget, City staff is in the process of hiring an independent consultant to develop a cost estimate of the DCP programming in order to assist in negotiations. DocuSign Envelope ID: 859C08A2-267B-42D2-9718-9442485A69B2 DE F E R R E D Request for Qualifications (RFQ) 2020-180-ND for Design/Build Services for 72nd Street Community Complex Page 5 For the reasons stated herein, I recommend that the Mayor and City Commission approve the resolution authorizing the Administration to enter into negotiations with The Haskell Company, as the top ranked proposer; further, if the Administration is not successful in negotiating an agreement with The Haskell Company, authorizing the Administration to enter into negotiations with PCL Construction Services, Inc., as the second ranked proposer; further, if the Administration is not successful in negotiating an agreement with PCL Construction Services, Inc., authorizing the Administration to enter into negotiations with Kaufman Lynn Construction, Inc., as the third ranked proposer; provided, however, that the final negotiated agreement shall be subject to the prior approval of the Mayor and City Commission. AH / DM / AD DocuSign Envelope ID: 859C08A2-267B-42D2-9718-9442485A69B2 DE F E R R E D RESOLUTION NO. ____ _ A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE CITY MANAGER, TO AUTHORIZE NEGOTIATIONS RELATING TO REQUEST FOR PROPOSALS NO. 2020-180-ND, FOR DESIGN/BUILD SERVICES FOR 72No STREET COMMUNITY COMPLEX {THE RFP); AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH THE HASKELL COMPANY, AS THE TOP RANKED PROPOSER; FURTHER, IF THE ADMINISTRATION IS NOT SUCCESSFUL IN NEGOTIATING AN AGREEMENT WITH THE HASKELL COMPANY, AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH PCL CONSTRUCTION SERVICES, INC., AS THE SECOND RANKED PROPOSER; FURTHER, IF THE ADMINISTRATION IS NOT SUCCESSFUL IN NEGOTIATING AN AGREEMENT WITH PCL CONSTRUCTION SERVICES, INC., AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH KAUFMAN LYNN CONSTRUCTION, INC., AS THE THIRD RANKED PROPOSER; PROVIDED, HOWEVER, THAT THE FINAL NEGOTIATED AGREEMENT SHALL BE SUBJECT TO THE PRIOR APPROVAL OF THE MAYOR AND CITY COMMISSION. WHEREAS, on June 24, 2020, the Mayor and City Commission authorized the issuance of RFP 2020-180-ND for Design/Build Services for the 72nd Street Community Complex (the RFP); the RFP was issued on June 26, 2020, with an opening date of August 10, 2020; and WHEREAS, a voluntary pre-proposal conference to provide information to the proposers submitting a response was held on July 7, 2020; and WHEREAS, the RFP provides for a two-step, phased evaluation process; and WHEREAS, the scope of Phase I of the evaluation process related to qualifications, experience and availability of the proposers and key members of the design-build team, including the lead designer and lead construction firm: and WHEREAS, only those Proposers short-listed during Phase I would be authorized to proceed to Phase II of the RFP selection process, during which phase the price and detailed technical proposals, based on the approved Design Criteria Package (the "DCP"), would be considered; and WHEREAS, under Phase I, the City received proposals in response to the RFP from the following seven (7) firms: • ANF Group, Inc.;•Balfour Beatty Construction, LLC;•Kaufman Lynn Construction, Inc.;•KVC Constructors, Inc.; •NV2A Group, LLC;•PCL Construction Services, Inc.; and•The Haskell Company; and DE F E R R E D WHEREAS, the proposal from AN F Group, Inc. was deemed non-responsive for failure to meet the minimum requirements of the RFP, and was not further evaluated; and WHEREAS, on August 3, 2020, via L TC # 276-2020, the City Manager appointed the Evaluation Committee (the" Evaluation Committee"), which convened on August 26, 2020 to consider the remaining proposals subm itted under Phase I; and WHEREAS, the Evaluation Committee's Phase I rankings were as follows: 1) Kaufman Lynn Construction, Inc.; 2) PCL Construction Services, Inc.; 2) The Haskell Company; 4) NV2AGroup, LLC; 5) KVC Constructors, Inc.; 6) Balfou r Beatty Construction, LLC; and WHEREAS, on September 16, 2020, City Commission adopted Resolution No. 2020-31387, accepting the recommendation of the City Manager pertaining to the ranking of the proposals with respect to Phase I of the RFP selection process, and authorized (1) Kaufman Lynn Construction, Inc., (2) PCL Construction Services, Inc., and (3) The Haskell Company, to be further considered in Phase II of the RF P evaluation process; and WHEREAS, on September 17, 2020, the Procurement Department issued Phase II of the RF P to the short-listed proposers; and WHEREAS, on December 14, 2020, the City rece ived the technical and price proposalsin response to Phase II of the RFP; and WHEREAS, the Evaluation Committee, appointed by the City Manager via L TC # 276-2020, convened on January 29, 2021 to consider the proposals received under Phase II; and WHEREAS, the Evaluation Committee's rankings for Phase II were as follows: (1)The Haskell Company;(2)PCL Construction Services, Inc.; and (3)Kaufman Lynn Construction, Inc; and WHEREAS, after reviewing all of the submissions and the Evaluation Committee's rankings, the City Manager concurs with the Evaluation Committee and recommends that the Mayor and City Commission authorize the Administration to enter into negotiations with The Haskell Company, as the top ranked proposer; further, if the Administration is not successful in negotiating an agreement with The Haskell Company, authorizing the Administration to enter into negotiations with PCL Construction Services, Inc., as the second ranked proposer; further, if the Administration is not successful in negotiating an agreement with PCL Construction Services, Inc., authorizing the Administration to enter into negotiations with Kaufman Lynn Construction, Inc., as the third ranked proposer, with the final negotiated agreement being subject to the prior approval of the Mayor and City Commission. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby accept the recommendation of the City Manager, to authorize negotiations relating to Request for Proposals No. 2020-180-ND, for Design/Build Services for 72nd Street Community Complex (the RFP); authorize the Administration to enter into negotiations with The Haskell Company, as the top ranked proposer; further, if the Administration is not successful in negotiating an agreement with The Haskell Company, authorize the Administration to enter into negotiations with PCL Construction Services, Inc., as the second ranked proposer; further, if the -' I II ---· --.--. .. --,--I ·-l 1 I -I 1 .. r ---- l I I i I -I ,-. I -. ·1 -: ' I I --------'·j -J I I ; I I ' I I I ---'' ' i _, ,--.----i -I -I I I: i I I I --l ii I I -I; ; I I -I ii -I r-, I -' -I -: ---.. ·-. I ·-, ·f--i-- I 'i 11 I -I -·, ·r 'i ·1 11 I -' -1 I -,-. ,--··: --' I ·-. -I I I I I , I I • I -I . I I . I -,. --' -r'i I -; ; 1· I I I I ' I 11 I I I I I I -• I I -, i -i l r--1 .;· --I --. ---- I I I ' --I I --, -, ' -I -rl --.-· -- l ' I I I -I l I I I I -, I I I I -I I ,· . I : -1 -'i I I --I I . I --1 • 1 ·-,---:·1· I ; I I I 'j II I I 'j T i -II I --' -11 I -f -·1 I I I I: I ,. ·r r -r I I 'I I i -i1 I fl .--' I I -1 ---.. I I I I I I ' I I I o I I -I • I I -I -r 1 I ·1 -1 --I I j· ·: -r· j" I - I t I I ' I I -I -' ' I I ' ' I I I I I I I r· --i . -· -, ' 1· I -J ,T -I (,--1·1··1·-.--1- ii I -: I I I I . II I I I I I I I I I I -I -I I ii 'I , .. . I ,-1· I--,. ·;-,--.. ---I ' 11 I - I' I I ' I I • I I I --I I I , I -, I I --I I I I 11 ! I -r: -1·, . I I ' I r: -r-- I -I, ,-. ' -I I -.. -I I, ' I .. --·- r . -- I -----··-----.-,.· ._ ' DE F E R R E D Administration is not successful in negotiating an agreement with PCL Construction Services, Inc., authorize the Administration to enter into negotiations with Kaufman Lynn Construction, Inc., as the third ranked proposer; provided, however, that the final negotiated agreement shall be subject to the prior approval of the Mayor and City Commission. PASSED AND ADOPTED this ___ day of ____ 2021. ATTEST: Rafael E. Granado, City Clerk Dan Gelber, Mayor APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION Dote DE F E R R E D RFQ 2020-180-ND Design/Build Services for 72nd Street Community Complex PHASE II Qualitative Lowest GMP Subtotal Qualitative Lowest GMP Subtotal Qualitative Lowest GMP Subtotal Qualitative Lowest GMP Subtotal Qualitative Lowest GMP Subtotal Qualitative Lowest GMP Subtotal Qualitative Lowest GMP Subtotal Kaufman Lynn Costruction, Inc.90 10 100 2 88 10 98 2 76 10 86 2 80 10 90 3 68 10 78 3 65 10 75 3 90 10 100 3 18 3 PCL Construction Services, Inc.89 10 99 3 86 10 96 3 73 10 83 3 91 10 101 2 78 10 88 2 85 10 95 2 92 10 102 1 16 2 The Haskell Company 97 8 105 1 92 8 100 1 84 8 92 1 95 8 103 1 98 8 106 1 89 8 97 1 94 8 102 1 7 1 Proposer GMP Kaufman Lynn Costruction, Inc.$79,976,000 PCL Construction Services, Inc.$80,202,724 The Haskell Company $94,200,025 Ra n k i n g Monica Beltran Ra n k i n g Ra n k i n g Cynthia Casanova David Gomez Low Aggregate Totals 10 9.97 8.4 Ra n k i n g Carolina Jones Carmen Sanchez Ra n k i n g 10 8 FOR DISPLAY PURPOSES ONLY. FINAL RANKING DOES NOT CONSTITUTE AN AWARD RECOMMENDATION. Total Points Awarded Elizabeth Wheaton Ra n k i n g Cost Proposal Maximum Allowable Points Daniel Veitia Ra n k i n g Ra n k i n g 10 DocuSign Envelope ID: 859C08A2-267B-42D2-9718-9442485A69B2 DE F E R R E D SECTION VI G.O. Bond Revised Implementation Plan DRAFT Item No. Proj. No.Category Impl. Dept.Project Name GO Bond Budget ORIGINAL Tranche 1 $151.1M 2019 ORIGINAL Tranche 2 $101.9M 2022 ORIGINAL Tranche 3 $97.6M 2025 ORIGINAL Tranche 4 $84.4M 2028 REVISED Tranche 1 $151.1 M 2019 REVISED Tranche 2 $206.0 M 2023 REVISED Tranche 3 $78.0 M 2027 Notes 1 40 Infrastructure CIP 41st Street Corridor 15,000,000 1,500,000 1,500,000 6,000,000 6,000,000 1,500,000 13,500,000 -Move up all $13.5M of remaining funding to T2 2 31 Infrastructure CIP Ocean Drive Improvement Project 20,000,000 -4,000,000 8,000,000 8,000,000 2,000,000 18,000,000 - Fund $2M design in T1 from #39 Seawalls; move up remaining funding of $18M to T2 3 32 Infrastructure CIP Palm & Hibiscus Neighborhood Enhancements 1,000,000 1,000,000 - - - 1,000,000 - - No change; COMPLETE 4 36 Infrastructure CIP Washington Ave Corridor 10,000,000 -2,000,000 6,000,000 2,000,000 1,000,000 9,000,000 - Fund $1M design in T1 from #39 Seawalls; move up remaining funding of $9M to T2 5 1 Parks CIP 72nd Street Park, Library, and Aquatic Center 53,800,000 10,800,000 43,000,000 - - 10,800,000 43,000,000 -No change 6 15 Parks CIP Bayshore Park (Par 3 / Community Park)15,700,000 15,700,000 - - - 15,700,000 - - No change 7 23 Parks CIP Baywalk 15,000,000 10,000,000 5,000,000 - - 10,000,000 5,000,000 - No change; begin permitting for T2 projects from unused appropriation in T1 for Pedestrian Bridge 8 27 Parks CIP Log Cabin Reconstruction 1,076,000 -1,076,000 - - - 1,076,000 -No change 9 10 Parks CIP Maurice Gibb Park 3,300,000 3,300,000 - - - 3,300,000 - - No change 10 24 Parks CIP Middle Beach Beachwalk 4,500,000 4,500,000 - - - 4,500,000 - - No change 11 12 Parks CIP North Beach Oceanside Park Beachwalk 2,000,000 2,000,000 - - - 2,000,000 - - No change 12 5 Parks CIP PAL Facility, Flamingo Park & Youth Center 30,550,000 15,400,000 -15,150,000 -15,400,000 15,150,000 - Move up T3 funding of $15.15M to T2; start Flamingo Park Master Plan improvements in T1 with unused appropriation from PAL facility 13 28 Parks CIP Art Deco Museum Expansion 2,000,000 -2,000,000 - - - 2,000,000 -No change 14 54 Public Safety CIP/Fire Marine Patrol Fire/Police Facility 2,700,000 2,700,000 - - - - 2,700,000 - Move to T2 from T1 due to estimated O&M impact of $1.5M; Provide $2.7M in T1 to #52 LED Lighting in Parks to advance the sub-project for Flamingo Park Lighting GOB Implementation Tracking Sheet 1 of 5 2/15/2021 SECTION VII.a G.O. Bond Revised Implementation Plan DRAFT Item No. Proj. No.Category Impl. Dept.Project Name GO Bond Budget ORIGINAL Tranche 1 $151.1M 2019 ORIGINAL Tranche 2 $101.9M 2022 ORIGINAL Tranche 3 $97.6M 2025 ORIGINAL Tranche 4 $84.4M 2028 REVISED Tranche 1 $151.1 M 2019 REVISED Tranche 2 $206.0 M 2023 REVISED Tranche 3 $78.0 M 2027 Notes 15 51 Public Safety CIP/Fire Replace Fire Station #3 10,000,000 - - 2,000,000 8,000,000 2,000,000 8,000,000 - Move design of $2M into T1 and move remaining funding to T2; Use unused appropriation from #45 FS #1 16 45 Public Safety CIP/Fire Replace Fire Station #1 10,000,000 7,000,000 3,000,000 - - 4,000,000 6,000,000 - Move $2M for design of #51 FS#3 and move $1M for design of #46 Ocean Rescue NB Facility 17 46 Public Safety CIP/Fire/Parks Ocean Rescue North Beach Facility 5,000,000 - - - 5,000,000 1,000,000 4,000,000 - Move up $1M of design into T1 and move remaining funding to T2; Use unused appropriation from #45 FS#1; pending confirmation from the County 18 13 Parks CIP/Parks North Shore Park & Youth Center 5,725,000 4,930,000 795,000 - - 3,540,000 2,185,000 - Provides $750K to #30 Skate Park project and $640K to #18 Scott Rakow flooring projects; baseball field conversion of $3.69M pushed out from T1 to T2 to align with completion of #1 72nd Street Project 19 39 Infrastructure CIP/PW Resilient Seawalls and Living Shorelines 10,000,000 8,000,000 2,000,000 - - 5,000,000 5,000,000 - Move $2M to #31 Ocean Drive for design and $1M to #36 Washington Ave in T1 20 29 Parks Econ Dev West Lots Redevelopment 5,000,000 1,000,000 2,000,000 2,000,000 -1,000,000 4,000,000 -Move remaining funding of $4M to T2 21 33 Infrastructure Env Street Tree Master Plan 5,000,000 2,500,000 2,500,000 - - 2,500,000 2,500,000 -No change 22 25 Parks Env/CIP Waterway Restoration 6,000,000 -1,500,000 4,500,000 - - 6,000,000 -Move all funding to T2 23 49 Public Safety Fire/Police Public Safety Radio System 10,000,000 10,000,000 - - - 10,000,000 - - No change 24 30 Parks Parks Skate Park Improvements 750,000 - - 750,000 -750,000 - - Funded in T1 from #13 North Shore Park & Youth Center due to move out of $3.69M baseball conversion sub-project to T2 to align with completion of #1 72nd Street Project 25 2 Parks Parks Collins Park 640,000 640,000 - - - 640,000 - - No change; COMPLETE 26 3 Parks Parks Crespi Park 211,000 211,000 - - - 211,000 - - No change; COMPLETE 27 4 Parks Parks Fairway Park 260,000 260,000 - - - 260,000 - - No change GOB Implementation Tracking Sheet 2 of 5 2/15/2021 G.O. Bond Revised Implementation Plan DRAFT Item No. Proj. No.Category Impl. Dept.Project Name GO Bond Budget ORIGINAL Tranche 1 $151.1M 2019 ORIGINAL Tranche 2 $101.9M 2022 ORIGINAL Tranche 3 $97.6M 2025 ORIGINAL Tranche 4 $84.4M 2028 REVISED Tranche 1 $151.1 M 2019 REVISED Tranche 2 $206.0 M 2023 REVISED Tranche 3 $78.0 M 2027 Notes 28 6 Parks Parks Fisher Park 105,000 - - - 105,000 -105,000 -Move up to T2 from T4 29 7 Parks Parks La Gorce Park 150,000 - - 150,000 - - 150,000 -Move up to T2 from T3 30 8 Parks Parks Lummus Park 4,737,000 4,737,000 - - - 4,737,000 - - No change 31 9 Parks Parks Marjory Stoneman Douglas Park 682,000 682,000 - - - 682,000 - - No change 32 11 Parks Parks Muss Park 250,000 - - 250,000 - - 250,000 -Move up to T2 from T3 33 14 Parks Parks Palm Island Park 231,000 -231,000 - - - 231,000 -No change 34 16 Parks Parks Pinetree Park 700,000 -700,000 - - - 700,000 -No change 35 17 Parks Parks Polo Park 500,000 500,000 - - - 500,000 - - No change; COMPLETE 36 20 Parks Parks South Pointe Park 480,000 - - 480,000 - - 480,000 -Move to T2 from T3 37 21 Parks Parks Stillwater Park 145,000 145,000 - - - 145,000 - - No change; COMPLETE 38 22 Parks Parks Tatum Park 840,000 - - - 840,000 -840,000 -Move up to T2 from T4 39 18 Parks Parks Scott Rakow Youth Center 5,088,000 4,448,000 640,000 - - 5,088,000 - - Move to T1 the $640,000 T2 amount for basketball flooring, gymnastics flooring, mondo flooring at ice rink, outdoor patio flooring using funding from #13 North Shore Park & Youth Center due to move out of $3.69M baseball conversion sub-project to T2 to align with completion of #1 72nd Street Project 40 19 Parks Parks Soundscape Park 4,500,000 4,500,000 - - - 4,500,000 - - No change - Scope & budget change required to remove Restrooms. 41 52 Public Safety Parks LED Lighting in Parks 4,500,000 1,041,000 3,459,000 - - 3,741,000 759,000 - Move up sub-project Flamingo Park lighting of $2.7M into T1 from T2; Use $2.7M of unused appropriation from #54 Marine Patrol Facility 42 47 Public Safety Police License Plate Readers 1,950,000 1,950,000 - - - 1,950,000 - - No change 43 50 Public Safety Police Security Cameras in Business Districts 825,000 825,000 - - - 825,000 - - No change 44 57 Public Safety Police Security Cameras in Entertainment District 1,490,000 1,490,000 - - - 1,490,000 - - No change GOB Implementation Tracking Sheet 3 of 5 2/15/2021 G.O. Bond Revised Implementation Plan DRAFT Item No. Proj. No.Category Impl. Dept.Project Name GO Bond Budget ORIGINAL Tranche 1 $151.1M 2019 ORIGINAL Tranche 2 $101.9M 2022 ORIGINAL Tranche 3 $97.6M 2025 ORIGINAL Tranche 4 $84.4M 2028 REVISED Tranche 1 $151.1 M 2019 REVISED Tranche 2 $206.0 M 2023 REVISED Tranche 3 $78.0 M 2027 Notes 45 56 Public Safety Police Security Cameras on Beach Walk 400,000 400,000 - - - 400,000 - - No change 46 26 Parks Prop Mgmt Roof Replacement for Cultural Facilities 2,980,000 2,980,000 - - - 2,980,000 - - No change; COMPLETE 47 48 Public Safety Prop Mgmt/Police Police Headquarters Renovations 10,000,000 4,000,000 -6,000,000 -5,500,000 4,500,000 - Advance $1.5M of T2 spending into T1 from unused appropriation in #55 Part 1 Street Lights; Move remaining funding to T2 from T3 48 37 Infrastructure PW Sidewalk Improvement Program 13,000,000 3,500,000 3,000,000 3,500,000 3,000,000 5,200,000 3,900,000 3,900,000 Add $1.7M in T1 from #38 Streets and redistribute remaining $7.8M across T2 and T3 in equal amounts 49 38 Infrastructure PW Street Pavement Program 30,000,000 7,500,000 7,500,000 7,500,000 7,500,000 5,800,000 12,100,000 12,100,000 Provides $1.7M in T1 to #37 Sidewalks and redistribute remaining $24.2M across T2 and T3 in equal amounts 50 55 Public Safety PW Street Lighting Improvements 10,000,000 5,000,000 5,000,000 - - 3,500,000 6,500,000 -Move $1.5M to #48 Part 1 Police HQ 51 35 Infrastructure PW/CIP Flamingo Park Neighborhood 20,000,000 - - 8,000,000 12,000,000 - - 20,000,000 Move all $20M of funding to T3 based on Jacob's Engineering stormwater sequencing plan 52 41 Infrastructure PW/CIP La Gorce Neighborhood Improvements 14,000,000 -2,000,000 3,000,000 9,000,000 - - 14,000,000 Move all $14M to T3 based on Jacob's Engineering stormwater sequencing plan 53 34 Infrastructure PW/CIP Neighborhood Above Ground Improvements 43,000,000 -5,000,000 15,000,000 23,000,000 -23,000,000 20,000,000 Move Indian Creek Parkway ($2M), South Pointe ($5M), Normandy Isle ($8M), and City Center ($8M) to T2; remainder of $20M to T3 consistent with Jacob's Engineering stormwater sequencing plan 54 44 Infrastructure PW/CIP North Shore Neighborhood Improvements 8,000,000 - - 8,000,000 - - - 8,000,000 No change consistent with Jacob's Engineering stormwater sequencing plan 55 53 Public Safety PW/CIP Security for Public Spaces 4,350,000 2,000,000 2,350,000 - - 2,000,000 2,350,000 -No change 56 42 Infrastructure Transp Neighborhood Traffic Calming & Pedestrian-Friendly Streets 2,000,000 1,500,000 500,000 - - 1,500,000 500,000 -No change GOB Implementation Tracking Sheet 4 of 5 2/15/2021 G.O. Bond Revised Implementation Plan DRAFT Item No. Proj. No.Category Impl. Dept.Project Name GO Bond Budget ORIGINAL Tranche 1 $151.1M 2019 ORIGINAL Tranche 2 $101.9M 2022 ORIGINAL Tranche 3 $97.6M 2025 ORIGINAL Tranche 4 $84.4M 2028 REVISED Tranche 1 $151.1 M 2019 REVISED Tranche 2 $206.0 M 2023 REVISED Tranche 3 $78.0 M 2027 Notes 57 43 Infrastructure Transp/CIP Protected Bicycle Lanes and Shared Bike/Pedestrian Paths 5,000,000 2,500,000 1,200,000 1,300,000 -2,500,000 2,500,000 -Move up remaining funding of $2.5M to T2 TOTAL 435,115,000 151,139,000 101,951,000 97,580,000 84,445,000 151,139,000 205,976,000 78,000,000 Red Indicates Completed projects GOB Implementation Tracking Sheet 5 of 5 2/15/2021 Summary Revised G.O. Bond Implementation Plan DRAFT COSTS ORIGINAL Tranche 1 $151.1 M 2019 ORIGINAL Tranche 2 $101.9 M 2022 ORIGINAL Tranche 3 $97.6 M 2025 ORIGINAL Tranche 4 $84.4 M 2028 Total REVISED Tranche 1 $151.1 M 2019 REVISED Tranche 2 $206.0 M 2023 REVISED Tranche 3 $78.0 M 2027 Total Total Project Costs per Tranche 151,139,000 101,951,000 97,580,000 84,445,000 435,115,000 151,139,000 205,976,000 78,000,000 435,115,000 Estimated Issuance Costs and Rounding 1,178,409 884,966 884,966 787,620 3,735,960 1,178,409 1,855,551 702,000 3,735,960 Total per Tranche 152,317,409 102,835,966 98,464,966 85,232,620 438,850,960 152,317,409 207,831,551 78,702,000 438,850,960 CATEGORY ORIGINAL Tranche 1 $151.1 M 2019 ORIGINAL Tranche 2 $101.9 M 2022 ORIGINAL Tranche 3 $97.6 M 2025 ORIGINAL Tranche 4 $84.4 M 2028 Total REVISED Tranche 1 $151.1 M 2019 REVISED Tranche 2 $206.0 M 2023 REVISED Tranche 3 $78.0 M 2027 Total Parks, Recreational Facilities, and Cultural Facilities 86,733,000 56,942,000 23,280,000 945,000 167,900,000 86,733,000 81,167,000 - 167,900,000 Police, Fire, and Public Safety 36,406,000 13,809,000 8,000,000 13,000,000 71,215,000 36,406,000 34,809,000 - 71,215,000 Neighborhoods and Infrastructure 28,000,000 31,200,000 66,300,000 70,500,000 196,000,000 28,000,000 90,000,000 78,000,000 196,000,000 Estimated Issuance Costs and Rounding 1,178,409 884,966 884,966 787,620 3,735,960 1,178,409 1,855,551 702,000 3,735,960 Total per Tranche 152,317,409 102,835,966 98,464,966 85,232,620 438,850,960 152,317,409 207,831,551 78,702,000 438,850,960 LOCATION ORIGINAL Tranche 1 $151.1M 2019 ORIGINAL Tranche 2 $101.9M 2022 ORIGINAL Tranche 3 $97.6M 2025 ORIGINAL Tranche 4 $84.4M 2028 Total REVISED Tranche 1 $151.1 M 2019 REVISED Tranche 2 $206.0 M 2023 REVISED Tranche 3 $78.0 M 2027 Total North 19,346,000 46,871,000 10,750,000 5,840,000 82,807,000 19,706,000 55,101,000 8,000,000 82,807,000 Mid 29,948,000 4,840,000 11,400,000 23,105,000 69,293,000 32,588,000 22,705,000 14,000,000 69,293,000 South 50,549,000 18,581,000 37,630,000 22,000,000 128,760,000 47,849,000 60,911,000 20,000,000 128,760,000 Citywide 51,296,000 31,659,000 37,800,000 33,500,000 154,255,000 50,996,000 67,259,000 36,000,000 154,255,000 Estimated Issuance Costs and Rounding 1,178,409 884,966 884,966 787,620 3,735,960 1,178,409 1,855,551 702,000 3,735,960 Total per Tranche 152,317,409 102,835,966 98,464,966 85,232,620 438,850,960 152,317,409 207,831,551 78,702,000 438,850,960 GOB Implementation Tracking Sheet 1 of 1 2/15/2021 SECTION VII.b G.O. Bond Revised Implementation Plan - T1 Funding Realignment- Part 1 DRAFT Item No. Proj. No.Category Impl. Dept.Project Name GO Bond Budget ORIGINAL Tranche 1 $151.1M 2019 REVISED Tranche 1 $151.1 M 2019 Notes Tranche 1 Only Values 1 31 Infrastructure CIP Ocean Drive Improvement Project 20,000,000 - 2,000,000 Fund $2M design in T1 from #39 Seawalls; move up remaining funding of $18M to T2 2,000,000 2 36 Infrastructure CIP Washington Ave Corridor 10,000,000 - 1,000,000 Fund $1M design in T1 from #39 Seawalls; move up remaining funding of $9M to T2 1,000,000 3 54 Public Safety CIP/Fire Marine Patrol Fire/Police Facility 2,700,000 2,700,000 - Move to T2 from T1 due to estimated O&M impact of $1.5M; Provide $2.7M in T1 to #52 LED Lighting in Parks to advance the sub-project for Flamingo Park Lighting (2,700,000) 4 51 Public Safety CIP/Fire Replace Fire Station #3 10,000,000 - 2,000,000 Move design of $2M into T1 and move remaining funding to T2; Use unused appropriation from #45 FS #1 2,000,000 5 45 Public Safety CIP/Fire Replace Fire Station #1 10,000,000 7,000,000 4,000,000 Move $2M for design of #51 FS#3 and move $1M for design of #46 Ocean Rescue NB Facility (3,000,000) 6 46 Public Safety CIP/Fire/Parks Ocean Rescue North Beach Facility 5,000,000 - 1,000,000 Move up $1M of design into T1 and move remaining funding to T2; Use unused appropriation from #45 FS#1; pending confirmation from the County 1,000,000 7 13 Parks CIP/Parks North Shore Park & Youth Center 5,725,000 4,930,000 3,540,000 Provides $750K to #30 Skate Park project and $640K to #18 Scott Rakow flooring projects; baseball field conversion of $3.69M pushed out from T1 to T2 to align with completion of #1 72nd Street Project (1,390,000) 8 39 Infrastructure CIP/PW Resilient Seawalls and Living Shorelines 10,000,000 8,000,000 5,000,000 Move $2M to #31 Ocean Drive for design and $1M to #36 Washington Ave in T1 (3,000,000) 9 30 Parks Parks Skate Park Improvements 750,000 - 750,000 Funded in T1 from #13 North Shore Park & Youth Center due to move out of $3.69M baseball conversion sub-project to T2 to align with completion of #1 72nd Street Project 750,000 GOB Implementation Tracking Sheet_Tranche 1 Only 1 of 2 2/17/2021 G.O. Bond Revised Implementation Plan - T1 Funding Realignment- Part 1 DRAFT Item No. Proj. No.Category Impl. Dept.Project Name GO Bond Budget ORIGINAL Tranche 1 $151.1M 2019 REVISED Tranche 1 $151.1 M 2019 Notes Tranche 1 Only Values 10 18 Parks Parks Scott Rakow Youth Center 5,088,000 4,448,000 5,088,000 Move to T1 the $640,000 T2 amount for basketball flooring, gymnastics flooring, mondo flooring at ice rink, outdoor patio flooring using funding from #13 North Shore Park & Youth Center due to move out of $3.69M baseball conversion sub-project to T2 to align with completion of #1 72nd Street Project 640,000 11 52 Public Safety Parks LED Lighting in Parks 4,500,000 1,041,000 3,741,000 Move up sub-project Flamingo Park lighting of $2.7M into T1 from T2; Use $2.7M of unused appropriation from #54 Marine Patrol Facility 2,700,000 12 48 Public Safety Prop Mgmt/Police Police Headquarters Renovations 10,000,000 4,000,000 5,500,000 Advance $1.5M of T2 spending into T1 from unused appropriation in #55 Part 1 Street Lights; Move remaining funding to T2 from T3 1,500,000 13 37 Infrastructure PW Sidewalk Improvement Program 13,000,000 3,500,000 5,200,000 Add $1.7M in T1 from #38 Streets and redistribute remaining $7.8M across T2 and T3 in equal amounts 1,700,000 14 38 Infrastructure PW Street Pavement Program 30,000,000 7,500,000 5,800,000 Provides $1.7M in T1 to #37 Sidewalks and redistribute remaining $24.2M across T2 and T3 in equal amounts (1,700,000) 15 55 Public Safety PW Street Lighting Improvements 10,000,000 5,000,000 3,500,000 Move $1.5M to #48 Part 1 Police HQ (1,500,000) TOTAL 146,763,000 48,119,000 48,119,000 - GOB Implementation Tracking Sheet_Tranche 1 Only 2 of 2 2/17/2021