Loading...
Section VIIc_Appendix 2 Section VII_GOB Implementation G.O. Bond Revised Implementation Plan - T1 Funding Realignment- Part 1 DRAFT Item No. Proj. No.Category Impl. Dept.Project Name GO Bond Budget ORIGINAL Tranche 1 $151.1M 2019 REVISED Tranche 1 $151.1 M 2019 Notes Tranche 1 Only Values 1 31 Infrastructure CIP Ocean Drive Improvement Project 20,000,000 - 2,000,000 Fund $2M design in T1 from #39 Seawalls; move up remaining funding of $18M to T2 2,000,000 2 36 Infrastructure CIP Washington Ave Corridor 10,000,000 - 1,000,000 Fund $1M design in T1 from #39 Seawalls; move up remaining funding of $9M to T2 1,000,000 3 54 Public Safety CIP/Fire Marine Patrol Fire/Police Facility 2,700,000 2,700,000 - Move to T2 from T1 due to estimated O&M impact of $1.5M; Provide $2.7M in T1 to #52 LED Lighting in Parks to advance the sub-project for Flamingo Park Lighting (2,700,000) 4 51 Public Safety CIP/Fire Replace Fire Station #3 10,000,000 - 2,000,000 Move design of $2M into T1 and move remaining funding to T2; Use unused appropriation from #45 FS #1 2,000,000 5 45 Public Safety CIP/Fire Replace Fire Station #1 10,000,000 7,000,000 4,000,000 Move $2M for design of #51 FS#3 and move $1M for design of #46 Ocean Rescue NB Facility (3,000,000) 6 46 Public Safety CIP/Fire/Parks Ocean Rescue North Beach Facility 5,000,000 - 1,000,000 Move up $1M of design into T1 and move remaining funding to T2; Use unused appropriation from #45 FS#1; pending confirmation from the County 1,000,000 7 13 Parks CIP/Parks North Shore Park & Youth Center 5,725,000 4,930,000 3,540,000 Provides $750K to #30 Skate Park project and $640K to #18 Scott Rakow flooring projects; baseball field conversion of $3.69M pushed out from T1 to T2 to align with completion of #1 72nd Street Project (1,390,000) 8 39 Infrastructure CIP/PW Resilient Seawalls and Living Shorelines 10,000,000 8,000,000 5,000,000 Move $2M to #31 Ocean Drive for design and $1M to #36 Washington Ave in T1 (3,000,000) 9 30 Parks Parks Skate Park Improvements 750,000 - 750,000 Funded in T1 from #13 North Shore Park & Youth Center due to move out of $3.69M baseball conversion sub-project to T2 to align with completion of #1 72nd Street Project 750,000 GOB Implementation Tracking Sheet_Tranche 1 Only 1 of 2 2/17/2021 G.O. Bond Revised Implementation Plan - T1 Funding Realignment- Part 1 DRAFT Item No. Proj. No.Category Impl. Dept.Project Name GO Bond Budget ORIGINAL Tranche 1 $151.1M 2019 REVISED Tranche 1 $151.1 M 2019 Notes Tranche 1 Only Values 10 18 Parks Parks Scott Rakow Youth Center 5,088,000 4,448,000 5,088,000 Move to T1 the $640,000 T2 amount for basketball flooring, gymnastics flooring, mondo flooring at ice rink, outdoor patio flooring using funding from #13 North Shore Park & Youth Center due to move out of $3.69M baseball conversion sub-project to T2 to align with completion of #1 72nd Street Project 640,000 11 52 Public Safety Parks LED Lighting in Parks 4,500,000 1,041,000 3,741,000 Move up sub-project Flamingo Park lighting of $2.7M into T1 from T2; Use $2.7M of unused appropriation from #54 Marine Patrol Facility 2,700,000 12 48 Public Safety Prop Mgmt/Police Police Headquarters Renovations 10,000,000 4,000,000 5,500,000 Advance $1.5M of T2 spending into T1 from unused appropriation in #55 Part 1 Street Lights; Move remaining funding to T2 from T3 1,500,000 13 37 Infrastructure PW Sidewalk Improvement Program 13,000,000 3,500,000 5,200,000 Add $1.7M in T1 from #38 Streets and redistribute remaining $7.8M across T2 and T3 in equal amounts 1,700,000 14 38 Infrastructure PW Street Pavement Program 30,000,000 7,500,000 5,800,000 Provides $1.7M in T1 to #37 Sidewalks and redistribute remaining $24.2M across T2 and T3 in equal amounts (1,700,000) 15 55 Public Safety PW Street Lighting Improvements 10,000,000 5,000,000 3,500,000 Move $1.5M to #48 Part 1 Police HQ (1,500,000) TOTAL 146,763,000 48,119,000 48,119,000 - GOB Implementation Tracking Sheet_Tranche 1 Only 2 of 2 2/17/2021